Sol_140FC324R0002_Amd_0005.pdf

PDF 183 KB Posted

Attached to
OR-HMNAR-Water System Upgrades Federal contract opportunity
Solicitation number
140FC324R0002
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document is an amendment to a solicitation for the Hart Mountain National Antelope Refuge (HMNAR) Water System Upgrades project located in Plush, Lake County, Oregon. The purpose of Amendment 0005 is to provide Phase 2 - Attachment 11 - Bid Schedule. The solicitation number is 140FC324R0002, and the contract is being issued by the U.S. Fish and Wildlife Service. The project's period of performance is from 06/01/2024 to 12/31/2026. The amendment lists the various base items, additive bid items, and option items to be included in the bid schedule, such as general requirements, preparatory requirements, treatment building, site electrical and instrumentation work, and various pipeline and infrastructure upgrades. Pricing details and quantities are provided for each item. No other terms and conditions have been changed.

View the file

Other files for this federal contract opportunity

Other files attached to OR-HMNAR-Water System Upgrades, newest first.
File Type Posted
Sol_140FC324R0002_Amd_0007.pdf PDF
Sol_140FC324R0002_Amd_0006.pdf PDF
Sol_140FC324R0002_Amd_0004.pdf PDF
Sol_140FC324R0002_Amd_0003.pdf PDF
Sol_140FC324R0002_Amd_0002.pdf PDF
Sol_140FC324R0002_Amd_0001.pdf PDF
Sol_140FC324R0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140FC324R0002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

FC3

Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS, Construction A/E Team 3

FC3

Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS Constr A/E 3

03/12/20240005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/12/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Hart Mountain National Antelope Refuge (HMNAR) Water System Upgrades located in Plush, Lake

County, Oregon in accordance with the statement of work.

The purpose of Amendment 0005 is to:

1. Provide Phase 2 - Attachment 11 - Bid Schedule.

5. All other terms and conditions remain unchanged and in full force and effect.

Period of Performance: 06/01/2024 to 12/31/2026

POINT OF CONTACT:

SHANNON BARNHILL

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Anthony Kuntz

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140FC324R0002/0005

CONTRACT SPECIALIST

SHANNON_BARNHILL@FWS.GOV

ANTHONY KUNTZ

CONTRACTING OFFICER

ANTHONY_KUNTZ@FWS.GOV

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Project Hart Mountain National Antelope Refuge Agency U.S. Fish and Wildlife Service

Project No. NA.

Prepared by Checked by

BASE ITEM. Item to be included at Contract Award.

ADDITIVE BID ITEM. Item to be included at Contract Award if supported by funding.

OPTION ITEM. Item to be included after Contract Award if there is additional funding.

BASE ITEM.

TASK 1: GENERAL REQUIREMENTS. LS

BASE ITEM.

TASK 2: PREPARATORY REQUIREMENTS. LS

BASE ITEM.

TASK 8: TREATMENT BUILDING. LS

BASE ITEM.

TASK 9: SITE ELECTRICAL AND INSTRUMENTATION WORK. LS

ADDITIVE BID ITEM.

TASK 3: VALET SPRING MODIFICATIONS. LS

OPTION ITEM.

TASK 4: TRANSMISSION PIPELINE FINAL CONNECTIONS. CONNECTIONS ONLY . LS

ADDITIVE BID ITEM.

TASK 5: STORAGE TANKS. LS

OPTION ITEM.

TASK 6: DISTRIBUTION PIPING. LS

OPTION ITEM.

TASK 7: POTABLE WATER PLUMBING. LS

OPTION ITEM.

DEMOLITION, REMOVAL, AND DISPOSAL OF EXISTING NON-HAZARDOUS LS

PIPE MATERIALS.

All Base, Additive Bid, and Option Items include the cost of Materials, Products, and Installation to result in 100% Construction

/ Installation Unless Explicitly Noted Otherwise.

Bid Schedule

SCHEDULE - DOMESTIC AND UTILITY WATER SYSTEM UPGRADES - BASE ITEMS, BID OPTION ITEMS, AND OPTION ITEMS

Spec Section

Bid Item No.

Description Quantity Unit Unit Price Total

Spec Section

Bid Item No.

Description Quantity Unit Unit Price Total

OPTION ITEM.

DEMOLITION, REMOVAL, AND DISPOSAL OF HAZARDOUS PIPE MATERIALS. LS

ASBESTOS-CEMENT PIPE REMEDIATION, REMOVAL, AND DISPOSAL SURCHARGE.

OPTION ITEM.

CHLORINATION SYSTEM. LS

OPTION ITEM.

PRICE INCREASE FOR CHANGING FROM PVC SCHEDULE 80 TO HDPE DR17 PIPE. LS

OPTION ITEM.

TRANSMISSION PIPELINE: TRENCHING AND BACKFILL. LF

OPTION ITEM.

TRANSMISSION PIPELINE: ABANDON IN-PLACE. LF

OPTION ITEM.

TRANSMISSION PIPELINE: 2" DIA. BURIED SCHEDULE 80 PVC PIPE OR LF

HDPE DR17 PIPE (RAW WATER).

OPTION ITEM.

TRANSMISSION PIPELINE: 3" DIA. BURIED SCHEDULE 80 PVC PIPE OR LF

HDPE DR17 PIPE (POTABLE WATER).

OPTION ITEM.

TRANSMISSION PIPELINE: 4" DIA. BURIED AWWA C900 PIPE OR LF

HDPE DR17 PIPE (UTILITY WATER).

GRAND TOTAL (BASE ITEMS) LS

GRAND TOTAL (BASE ITEMS, ADDITIVE BID ITEMS) LS

GRAND TOTAL (BASE ITEMS, ADDITIVE BID ITEMS, OPTION ITEMS) LS

File details come from the government source that posted it. Updated .