This document is an amendment to a Request for Quote (RFQ) for Disaster Recovery Services. The amendment incorporates contractor questions and government answers related to the requirements.

The key details are:

  • The contract period of performance is March 15, 2025 to March 14, 2026.
  • The primary recovery facility must be located within a 100-mile radius of the Denver metropolitan area, and the secondary facility must be geographically separated, at least 60 miles from the primary and the Albuquerque Data Center.
  • The contractor is required to provide a mainframe z15 with crypto express card at the primary site, with a secondary mainframe available within 120 days of award.
  • The contractor must provide 3 full size racks (42U each) and 1 medium rack to house the DOI-provided equipment, with the contractor providing the backup power/generator at each site.
  • Pricing will be evaluated on a firm-fixed-price basis to the lowest technically acceptable quotation, with no leases or options considered.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140D0424Q0033 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Herndon VA 20170

D15

Suite 2000A 381 Elden Street Acquisition Services Directorate Interior Business Center, AQD

05/31/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/31/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This RFQ is hereby amended to update and incorporate Contractor Questions and Government

Answers (Q&A) - "RFQ 140D0424Q0033 - Amendment 2 -Questions and Answers"

Period of Performance: 03/15/2025 to 03/14/2026

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Adam Stetler

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

RFQ 140D0424Q0033 – Disaster Recovery

Contractor Question and Answers

Question Number

Vendor Question Government Response

1 Does this request require an existing facility or is a new facility acceptable within 100 radius of Denver?

Contractor is required to provide the demarcation location to an existing facility.

2 Is a existing colocation site acceptable for both recovery locations?

No.

3 Is the any requirement for a facility within 100 mile radius of Albuquerque, NM?

4 Our facilities manager can offer the location on lease to U.S. Government, is a lease situation most convenient?

No leases will be considered under this requirement.

5 If facilities are leased on a Base +4 yr option, what is the possibility of contract extension for leasing services beyond this timeframe?

See above response.

6 Does this infrastructure operation require back-up power/generator onsite sessions, for redundancy at second facility or are both expected singular solutions with an additional backup to the secondary backup?

Each Data Center shall have its own back-up power/generator onsite.

7 How many mainframes are needed at each site, primary, secondary?

One mainframe z15 with crypto express card shall be available for DOI at the contractor site. The contractor shall provide the resources per the SOW during the annual exercise and during a disaster declaration.

Contractor shall ensure the resources are available for DOI use.

8 Noting there's a 6.99kW per rack, how many racks at each site? Is 6.99kW the actual power draw anticipated on each of the racks or mainframes?

The 6.99KW is adequate coverage per rack.

DOI listed the DOI owned equipment, and the actual power calculation should be done by the contractor based on the list of Equipment. The estimated 6.99KW does not include the mainframe.

9 What power circuits do they require, i.e., 208V 30A single-phase, 208V 30A three-phase, something else?

208V 30A three-phase is the standard.

We typically have 2 separate circuits per rack for redundancy.

10 What is the total replicated SF required for primary disaster recovery site total replicated SF required for secondary disaster recovery site?

Contractor shall estimate SF required based on the Attachment A equipment.

11 Does the solicitation requirement for (2Qty) z15 IBM Mainframe be available at the time of contract award or is obtaining it during transition period acceptable?

The primary mainframe shall be available at the time of award and be located at site where the contractor provided the demarcation address. The secondary mainframe shall be available within 120 days of award.

12 Is all DOI equipment to be duplicated at both recovery facilities?

No, only at the primary site.

13 Has this solicitation provided the entire list of IT equipment required?

Yes

14 Is there a designated DR budget and are there any limits on any specific items?

Award will be made as a firm-fixed price order to the lowest price technically acceptable quotation.

15 What does ADC stand for? Albuquerque Data Center 16 Please clarify each one below.

a) The primary recovery facility needs to be "located within a 100-mile radius of the Denver Metropolitan Area."

b) The secondary recovery facility needs to be "located in a geographically separated area from the primary recovery facility and from ADC."

a. 100-mile radius of the Denver Metropolitan Area for the purpose of evaluation will be 100 miles from the Denver City Limits base on driving distance of google maps.

b. The secondary recovery facility must be at least 60 miles from the primary site and ADC site.

17 Can both primary and secondary recovery data centers be located outside the 100 mile radius of the Denver Metropolitan area? However, both backup data centers would be geographically separated from each other.

18 Can we get an extension?

19 What is the size of the current data center space? N/A 20 How many cabinets? 3 Cabinets can house all the DOI owned equipment.

21 What is current space power draw? N/A See answer on item 8.

22 For the network circuits, should the new circuits be sized similarly? Or shall we make recommendations for speeds?

Per the SOW, DOI will be responsible for the installation and cost of the circuits. DOI anticipates ordering similar sized circuits. Contractor can recommendations but it will not be part of the evaluation or award.

23 What is the quantity of cabinets for this environment? 4 Racks. 3 Full size Racks - 42U each Rack and a Medium size rack to house the DLM.

24 What are the sizes of the cabinets?

See answer on item 23

25 Will the entire environment be migrated to the new locations or is going to be done with some net new equipment?

Combination. Some will be moved, some will be new but similar in specs.

26 What is the overall anticipated power draw, and if known, what type of power circuits are required?

See answer on item 8 and 9.

27 Any physical security requirements?

Yes, see “2. Security Requirements” in the SOW.

28 Regarding 2nd Recovery Site will DOI be providing customer owned network, DLM equipment and replicate that to 2nd site?

No, adequate network shall be established between both sites to enable the restore from the DLM located at the primary site to the Mainframe at the secondary site.

29 Also, if 6.99 kW for Network equipment includes DLM equipment?

6.99 KW is per Rack not the total power draw.

30 Are they customer provided cabinets or vendor provided cabinets and how many?

The 3 cabinets are shall be provided by the contractor.

The DLM rack will be provide by DOI.

31 What are the plans for growth for the future?

The mainframe can be upgraded and changed in our production environment and that will require the same change at the disaster recovery site provided by the contractor.

The circuits can be changed also in the future based on DOI needs and based on DOI clients needs.

The DOI owned equipment can be replaced, we may add or remove some of the DOI equipment, but we will continue to use the same number of racks as the 3 racks are not fully stacked.

For Mainframe it notates: 3 GP We either need to know: what capacity setting on the general processor (GP) OR total # of MIPS DOI requires.

DOI has a 8562.P03 Model: T02 Our last CP300 study our CPC at 1757 MIPS