A15_Brand_Name_Justification_JA25-00168_Copy_Redacted.pdf

PDF 1 MB Posted

Attached to
Ft Hall Indian Irrigation Project (FHIP) Flowmeter
Solicitation number
140A1225Q0014
Issued by

About this file

This document is a Brand Name Only Justification for the Fort Hall Indian Irrigation Project (FHIP) Flowmeters. The Bureau of Indian Affairs requires McCreometer flow meters for the Fort Hall Indian Irrigation Project to record daily water flow into canals for the Shoshone Bannock Tribe and the State of Idaho Department of Water Resources. The procurement is being conducted as a non-competitive acquisition under FAR 13.106-1(b)(1)(i), with justification based on the project's current use of McCreometer flow meters and personnel's proficiency with this specific brand. Market research conducted through ISBEE vendors confirmed commercial availability, with 14 Indigenous business enterprises identified that could potentially provide a quote.

The justification highlights the time-sensitive nature of the procurement, as the water season has already started (April to October), and switching to an alternative flow meter would require retraining personnel and potentially disrupt irrigation of valuable crops. The contracting officer has determined the anticipated cost will be fair and reasonable, based on the expectation of competitive quotations from qualified ISBEE sources. Future market research will continue to minimize brand-specific acquisitions, with the goal of identifying alternative manufacturers' products that could be utilized in subsequent procurements.

View the file

Other files

File Type Posted
Sol_140A1225Q0014.pdf PDF
Attachment_2_IA_-_IEE_Representation_Form.pdf PDF
Attachment_1_Specs.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7. A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable.

I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. This determination is based on the following:

8. A description of the market research conducted (see Part 10) and the results or a statement of the reason market research was not conducted.

9. Any other facts supporting the use of justification of other than full and open competition, such as:

10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.

11. A statement of any actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.

File details come from the government source that posted it. Updated .