This is a Statement of Work for aftercooler core replacement and cleaning services aboard the NOAA Ship FERDINAND R. HASSLER. The work involves removing and replacing government-furnished aftercooler cores on four diesel engines: two Caterpillar C-32 main propulsion diesel engines (MPDEs) and two Caterpillar C9 ship's service diesel generators (SSDGs), with serial numbers PME RND00123, SME RND00124, PDG C9J00506, and SDG C9J00507.
The contractor must perform the following primary tasks: install the provided aftercooler cores on all four engines; provide new OEM seal and gasket sets for each engine installation; supply sealant for aftercooler cores as needed; inspect and clean turbo housings, air lines, and intake plenums; inspect all connection points and removed parts; submit a condition found report recommending any additional maintenance or replacement parts; reinstall all components using new OEM seals and gaskets; perform operational testing of all four engines to satisfaction of the Chief Marine Engineer or Port Engineer; wash, chemically clean, and hydrostatic test the removed cores to 30 psi; return removed cores to the port office; and provide a comprehensive service summary report including engine hours, fuel burn, inspection observations, and maintenance recommendations. The contractor must use Caterpillar-recommended cleaners (Hydrosolv 4165 or Hydrosolv 100) at specified concentrations and temperatures. Three maintenance windows are scheduled: Norfolk, VA (June 22-26, 2026), Charleston, SC (September 7-10, 2026), and New Castle, NH (November 2-30, 2026), with dates subject to change based on the ship's schedule. The point of contact is Port Engineer Justin Kusterer at 240-704-2815 or justin.kusterer@noaa.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1333MK26Q0057_Amd_0002.pdf | ||
| Attachment_0002_0002.pdf | ||
| Sol_1333MK26Q0057_Amd_0001.pdf | ||
| Statement_of_Work.pdf | ||
| Sol_1333MK26Q0057.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA Hassler
( NOAA-S 250 )
Propulsion Machinery CONTRACT NO. N00000-00-X-0000
ITEM NO. 20002 CATEGORY "A" 2026-03-19
Aftercooler Core Replacement Plus Cleaning Kusterer, Justin
20001 - 1
1.1 Intent:
1.1.1 This item describes the requirement to change out and
clean aftercoolers on the port and starboard main engines (MPDE) and ship’s service diesel generators (SSDG) aboard NOAA Ship
FERDINAND R. HASSLER.
1.2 References:
1.2.1 None
1.3 Government Furnished Material:
1.3.1 2 sets of aftercoolers for MPDEs (C32)
1.3.2 2 sets of aftercoolers for SSDGs (C9)
1.4 Requirements:
1.4.1 Remove existing and install GFM aftercooler cores on
both the PORT and STARBOARD main diesel engines, and both the port and starboard SSDGs.
1.4.2 Provide new OEM seal and gasket sets to accommodate
aftercooler changes on each engine.
1.4.3 Provide sealant for aftercooler cores. See 1.6.4.
1.4.4 Inspect and clean turbo housings and air lines.
1.4.5 Inspect intake plenum.
1.4.6 Inspect remaining connection points and parts removed
to facilitate aftercooler core change.
1.4.7 Checkpoint: Submit a condition found report to the
port engineer and contracting officer to recommend additional replacement parts and maintenance, as required.
1.4.8 Reinstall all components, utilizing new OEM seals and
gaskets.
1.4.9 Upon completion of all work, perform an operational
test of all four engines. Observe engines for proper operation and control, to the satisfaction of the Chief Marine Engineer or Port Engineer.
1.4.10 Wash, chemically clean and test the removed
aftercooler cores. Test to 30 psi.
1.4.11 Return removed aftercooler cores to port office.
1.4.12 Provide a service summary report. Include individual
Propulsion Machinery CONTRACT NO. N00000-00-X-0000
20001 - 2 engine hours and total fuel burn, inspection observations and any recommendations for additional maintenance or repairs.
1.5 Quality Assurance:
1.5.1 Run each engine until normal operating temperatures
and conditions are met. Verify no leaks and proper operational parameters are met.
1.5.2 Perform a submerged hydrostatic test on each core to
30 psi. Provide testing report.
1.6 Notes:
1.6.1 MPDEs are CAT C-32 Engines, SSDGs are CAT C9 Engines.
Engine S/Ns as follows:
PME RND00123
SME RND00124
PDG C9J00506
SDG C9J00507
1.6.2 The point of contact for this work is the Port
Engineer Justin Kusterer. He can be reached at 240-704-2815 or justin.kusterer@noaa.gov
1.6.3 Caterpillar recommends the following core cleaner:
Part Number Description Size
1U5490 *Hydrosolv 4165 19L (5 US gallon)
174-6854 *Hydrosolv 100 19L (5 US Gallon
*: Use a two to five percent concentration of the cleaner at temperatures up to 93deg C (200 degF). Refer to application guide, NEHS050526 or consult your Caterpillar dealer for more information.
1.6.4 It has been noted that after having been cleaned and
hydro tested, sealant may be removed from the aftercooler cores outer perimeter. The Contractor shall provide the required sealant in the event that GFE cores are lacking. Example:
Propulsion Machinery CONTRACT NO. N00000-00-X-0000
20001 - 3
1.6.5 Maintenance windows locations and dates. Maintenance
windows and locations subject to change based on ship’s schedule
CLIN 1: CLIN 2: Norfolk, VA 22JUN2026 to 26JUN2026 CLIN 2: Charleston, SC 07SEP2026 to 10SEP2026 CLIN 3: New Castle, NH 02NOV2026 to 30NOV2026
| 1.1 Intent: |
| 1.1.1 This item describes the requirement to change out and clean aftercoolers on the port and starboard main engines (MPDE) and ship’s service diesel generators (SSDG) aboard NOAA Ship FERDINAND R. HASSLER. |
| 1.2 References: |
| 1.2.1 None |
| 1.3 Government Furnished Material: |
| 1.3.1 2 sets of aftercoolers for MPDEs (C32) |
| 1.3.2 2 sets of aftercoolers for SSDGs (C9) |
| 1.4 Requirements: |
| 1.4.1 Remove existing and install GFM aftercooler cores on both the PORT and STARBOARD main diesel engines, and both the port and starboard SSDGs. |
| 1.4.2 Provide new OEM seal and gasket sets to accommodate aftercooler changes on each engine. |
| 1.4.3 Provide sealant for aftercooler cores. See 1.6.4. |
| 1.4.4 Inspect and clean turbo housings and air lines. |
| 1.4.5 Inspect intake plenum. |
| 1.4.6 Inspect remaining connection points and parts removed to facilitate aftercooler core change. |
| 1.4.7 Checkpoint: Submit a condition found report to the port engineer and contracting officer to recommend additional replacement parts and maintenance, as required. |
| 1.4.8 Reinstall all components, utilizing new OEM seals and gaskets. |
| 1.4.9 Upon completion of all work, perform an operational test of all four engines. Observe engines for proper operation and control, to the satisfaction of the Chief Marine Engineer or Port Engineer. |
| 1.4.10 Wash, chemically clean and test the removed aftercooler cores. Test to 30 psi. |
| 1.4.11 Return removed aftercooler cores to port office. |
| 1.4.12 Provide a service summary report. Include individual engine hours and total fuel burn, inspection observations and any recommendations for additional maintenance or repairs. |
| 1.5 Quality Assurance: |
| 1.5.1 Run each engine until normal operating temperatures and conditions are met. Verify no leaks and proper operational parameters are met. |
| 1.5.2 Perform a submerged hydrostatic test on each core to 30 psi. Provide testing report. |
| 1.6 Notes: |
| 1.6.1 MPDEs are CAT C-32 Engines, SSDGs are CAT C9 Engines. Engine S/Ns as follows: |
| PME RND00123 |
| SME RND00124 |
| PDG C9J00506 |
| SDG C9J00507 |
| 1.6.2 The point of contact for this work is the Port Engineer Justin Kusterer. He can be reached at 240-704-2815 or justin.kusterer@noaa.gov |
| 1.6.3 Caterpillar recommends the following core cleaner: |
| 1.6.4 It has been noted that after having been cleaned and hydro tested, sealant may be removed from the aftercooler cores outer perimeter. The Contractor shall provide the required sealant in the event that GFE cores are lacking. Example: |
| 1.6.5 Maintenance windows locations and dates. Maintenance windows and locations subject to change based on ship’s schedule |
| CLIN 1: CLIN 2: Norfolk, VA 22JUN2026 to 26JUN2026 |
| CLIN 2: Charleston, SC 07SEP2026 to 10SEP2026 |
| CLIN 3: New Castle, NH 02NOV2026 to 30NOV2026 |