13 Rework and Repair ES7034.pdf

PDF 184 KB Posted

Attached to
B1B TRANSFER ONE WAY Federal contract opportunity
Solicitation number
FA8213
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This federal contract solicitation seeks various time delay devices and initiators to be used in munitions. The solicitation includes nine line items for different time delay products identified by National Stock Numbers ranging from 0.3 to 1.6 seconds as well as initiators. First article test plans are due within 30 days of award with first article tests to be completed within 120 days and production articles due by 30 June 2021 to Hill Air Force Base. The solicitation requires compliance with rework and repair procedures outlined in an attached document defining these terms and processes. The contracting agency is the Department of the Air Force Materiel Command Lifecycle Management Center.

View the file

Other files for this federal contract opportunity

Other files attached to B1B TRANSFER ONE WAY, newest first.
File Type Posted
03 FA8213R3039 AMEND 2 Solicitation.pdf PDF
02 FA821320R3039 AMEND 1 Solicitation.pdf PDF
20 CDRLs_50073.pdf PDF
07 SPI_F012340719.pdf PDF
16 Item Descriptions 20-50073.pdf PDF
06 SOW SPI.pdf PDF
01 AIR_SPEC 20-50073.pdf PDF
08 SPI_F012340822.pdf PDF
Synopsis.pdf PDF
11 QALI 20-50073.pdf PDF
04 SOW Ammunition Data Cards.pdf PDF
18 EDL 20-50073.pdf PDF
12 QALI 20-50076.pdf PDF
21 CDRLs_50076.pdf PDF
02 AIR_SPEC 20-50076.pdf PDF
17 Item Descriptions 20-70076.pdf PDF
03 REPSHIP 20-50073_20-50076.pdf PDF
FA821320R3039 Solicitation..pdf PDF
05 CADPAD Item Marking Instructions.pdf PDF
09 SPI_F011676621.pdf PDF
10 SPI_F012418149.pdf PDF
15 JFQR 20-50076.pdf PDF
19 EDL 20-50076.pdf PDF
14 JFQR 3746ES.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the non-conformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

File details come from the government source that posted it. Updated .