11 QALI 20-50073.pdf
PDF 916 KB Posted
- Attached to
- B1B TRANSFER ONE WAY Federal contract opportunity
- Solicitation number
- FA8213
About this file
This document outlines a federal solicitation for time delay devices and initiators. The solicitation seeks first article samples and production quantities of nine national stock numbered pyrotechnic items across eleven line items for use by the Department of the Air Force Materiel Command Lifecycle Management Center. Delivery of first article test plans is required within 30 days of award, with first article tests to be completed within 120 days of approval. Production items must be delivered by specified dates in June 2021 to Hill Air Force Base and Tinker Air Force Base. The solicitation was released to Pacific Scientific Energetic Material and Chemring Energetic Devices and includes standard terms for first article testing and production deliverables.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 03 FA8213R3039 AMEND 2 Solicitation.pdf | ||
| 02 FA821320R3039 AMEND 1 Solicitation.pdf | ||
| 14 JFQR 3746ES.pdf | ||
| FA821320R3039 Solicitation..pdf | ||
| 05 CADPAD Item Marking Instructions.pdf | ||
| 09 SPI_F011676621.pdf | ||
| 10 SPI_F012418149.pdf | ||
| 15 JFQR 20-50076.pdf | ||
| 19 EDL 20-50076.pdf | ||
| 06 SOW SPI.pdf | ||
| 01 AIR_SPEC 20-50073.pdf | ||
| 08 SPI_F012340822.pdf | ||
| Synopsis.pdf | ||
| 04 SOW Ammunition Data Cards.pdf | ||
| 18 EDL 20-50073.pdf | ||
| 12 QALI 20-50076.pdf | ||
| 21 CDRLs_50076.pdf | ||
| 02 AIR_SPEC 20-50076.pdf | ||
| 17 Item Descriptions 20-70076.pdf | ||
| 03 REPSHIP 20-50073_20-50076.pdf | ||
| 20 CDRLs_50073.pdf | ||
| 13 Rework and Repair ES7034.pdf | ||
| 07 SPI_F012340719.pdf | ||
| 16 Item Descriptions 20-50073.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
Sheet1
| Text46: 10 May 2019 | |
| 2019-05-10T13:20:52-0600 | |
| TIDWELL.QUINN.RAY.1241451913 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, Reports) |
| undefined_7: M |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: 6036200-1, 816890-1 |
| DODIC: MH61 |
| Text20: |
| Text19: |
| Part Number Line 2: |
| Contract No: 20-50073 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: |