Little Truckee Biomass Stewardship Page 21 of 73

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
1. REQUISITION NUMBER
PAGE 1 OF
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
73
2. CONTRACT NO.
3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER
5. SOLICITATION NUMBER
6. SOLICIATION ISSUE

DATE

129JGP19R4006
April 25, 2019

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME
b. TELEPHONE NUMBER(No collect

calls)

8. OFFER DUE DATE/

LOCAL TIME

Donald Tinsley
(530) 478-6121 x
May 16, 2019/ 430 PM PST
9. ISSUED BY
CODE
10. THIS ACQUISITON IS |X| UNRESTRICTED OR |_| SET ASIDE
% FOR:

Email: @ Phone No.: ( ) - x

|_|
SMALL BUSINESS
|_|
WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMAN-

OWNED SMALL BUSINESS PROGRAM

|_|
EDWOSB
NAICS:
|_|
HUBZONE SMALL BUSINESS

113310

|_|
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS
|_|
8(A)
SIZE STANDARD:

500 employees

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

|_| SEE SCHEDULE

12. DISCOUNT TERMS

|_|13a. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

13b. Rating

14. METHOD OF SOLICITATION

|X| RFQ
|_| IFB
|X|RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17A. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE

Email: @ Telephone No: ( ) - x

IPP

DUNS:

|_|
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

|X| SEE ADDENDUM

19.
20.
21.
22.
23.
24.
ITEM N0.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

LITTLE TRUCKEE BIOMASS STEWARDSHIP PROJECT

See attached Schedule of items

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

|X|
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
|X|
ARE
|_|
ARE NOT ATTACHED
|X|
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
|X|
ARE
|_|
ARE NOT ATTACHED
|_|28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
|_| 29. AWARD OF CONTRACT: REF. OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
DATED , YOUR OFFER ON SOLICITATION
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print)
31c. DATE SIGNED
/
/
AUTHORIZED FOR LOCAL REPRODUCTIONSTANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLEPrescribed by GSA FAR (48 CFR) 53.212
Little Truckee Biomass StewardshipPage 1 of 73
Project nameSolicitation No.Page 2 of 69

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

Amount

SEE ATTACHED SCHEDULE OF ITEMS

32a. QUANTITY IN COLUMN 21 HAS BEEN

|_| RECEIVED
|_| INSPECTED
|_| ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

/
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

( ) - x

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT
37. CHECK NUMBER

|_| PARTIAL |_| FINAL

|_| COMPLETE |_| PARTIAL |_| FINAL

38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42a. RECEIVED BY (Print)
41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41 c. DATE

42b. RECEIVED AT (Location)

42c. DATE RECD (YY/MM/DD)
42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV.3/2011) BACK

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 GENERAL INFORMATION:

Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section L for instructions on preparing your proposal and pricing.

Bonds: Bid Bonds, Payment Bonds, and Performance Bonds are not required for this project.

All Contractors must be actively registered in the System for Award Management (SAM) (https://SAM.gov) to be eligible for award under this solicitation. If not actively registered by time of proposal evaluations, you will be found non-responsive. Registration in SAM is a free service – you do not need to pay to register in this system. If your registration is not active, you will not be considered for award.

B.2SCHEDULE OF ITEMS
B.2.1 MANDATORY WORK ACTIVITIES:
Contractor Name
ITEM NO.
DESCRIPTION OF

MANDATORY WORK ACTIVITIES

UNIT
ESTIMATED

QUANTITY

UNIT PRICE
TOTAL
1
Chipping and Hauling of Biomass

See Appendix A and B

Lump Sum
1 Job
$
$
2
Road Maintenance – Appendix C
Lump Sum
1 Job
$
$
Total All Mandatory Service Items
$

B.2.2 OPTIONAL WORK ACTIVITIES:

Contractor Name
ITEM NO.
DESCRIPTION OF

OPTIONAL WORK ACTIVITIES

UNIT
ESTIMATED

QUANTITY

UNIT PRICE
TOTAL
1
Chipping and Hauling of Biomass

See Appendix A and B

Lump Sum
1 Job
$
$
Total All Optional Service Items
$

B.2.3 TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:

SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE OFFER
OFFER

(FLAT)

TOTAL OFFER

CS
BIOMASS
33,829
Green Tons
$3,382.90 at $0.10 per ton
$
$
CS
BIOMASS

Optional Items

6,497
Green Tons
$649.70 at $0.10 per ton
$
$
Total – All Products
$

Note: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.

NOTE: Price Proposals MUST be provided on ALL Items in Schedules: Mandatory Work and Option Work Activities and Timber or other products Removal Price Schedule. Unit prices prevail.

B.3 LAND MANAGEMENT ACTIVITIES.

Performance of land management activities shall be in accordance with Section C – Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule B-2.1 will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Base Work Activities shall be performed. Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.

SECTION C – DESCRIPTION/ SPECIFICATIONS/STATEMENT OF WORK

C.1 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.2 Project Description

(a) The purpose of the Little Truckee Biomass Stewardship is to:

Reduce hazardous fuel loadings and modify landscape-scale wildland fire behavior;

• Maintain and enhance habitat for the marten and other wildlife species associated with late seral forest habitat;

• Create heterogeneous forest stand conditions that would be expected to develop under an active fire regime;

• Enhance the ecological role of fire To accomplish these objectives, the contract includes the following components: biomass chip, haul and removal, and road work maintenance

(b) Resulting Contract – Any resultant contract will be a commercial services contract with requirements for timber removal.

(c) Project Location – Project is located in T19N, R16E, Sec. 6 &7; T19N, R15E, Sec. 1, 2, 11, & 12, T19N, R15E, Sec. 8, 9 & 10; T18N, R15E, Sec. 14 & 22; T19N, R14E, Sec. 18: T19N, R13E, Sec. 16 and 22 MDB&M (Mount Diablo Base and Meridian) C.3 Specifications Specifications for each Stewardship Activity individually described by an item number in Schedule B pages can be found in Appendix A. Specifications for timber removal can be found in Appendix B. Road Maintenance plans and specifications can be found in Appendix C.

C.4 Contract Area Map The boundaries of Subdivisions or Payment Units and any cutting units thereof, are as shown on the attached "Contract Area Map," which is made a part hereof, and were, before solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of the Subdivisions or Payment Units and their approximate acreage are stated in Division A/AT. Subdivisions or Payment Units may be revised and additional ones may be established only by written agreement of both parties. Where applicable, the following are also identified on Contract Area Map:

(a)Identified claims limiting Contractor's rights;
(b)Boundaries of cutting units;
(c)Areas where leave trees are marked to be left uncut;
(d)Roads listed
(e)Sources of base course, rock riprap and surface rock;
(f)Roads where log hauling is prohibited or restricted;
(g)Roads and trails to be kept open;
(h)Improvements to be protected;
(i)Locations of known historical sites;
(j)Maximum stump heights when more than one height is listed by areas;
(k)Skidding or yarding methods specified;
(l)Streamcourses to be protected;
(m)Other features required by Appendix B; and
(n)Boundaries of stewardship work activities.
C.5Government-Furnished Property

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause(s) contained in Section I of the contract.

Description of Property
Value
Quantity
Return/Consumable

N/A

C.6 Operating Plan and Schedule:

The Contractor will provide a detailed timeline of when the contract requirements will be accomplished while conforming to the requirements within Section F.5. The operating plan should indicate the sequence of activities that will take place to accomplish the tasks described within the solicitation, Appendix A, Appendix B, Appendix C, and Appendix D including proposed start and completion dates. The operating plan and schedule should contain the following elements:

· All Subcontractors working on this contract.

· A proposed communication plan regarding findings, progress, information exchange, questions, and concerns of both parties.

Depending upon how the contractor proposes accomplishing the activities within the solicitation, the Operating Plan and Schedule may be developed by indicating when and how all work activities within individual units will be completed, when and how individual tasks will be completed, or a combination of when and how units or tasks will be completed. The contractor should be able to display through an operating plan and schedule that all of the contract activities will be accomplished in a timeline that will meet the contract requirements.

C.7 Sustainable Acquisition The Contractor shall comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.

In compliance with FAR Part 23.4 through performance of this contract, the Contractor shall make maximum use of EPA designated and USDA designated biobased in accordance with FAR clause 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts and 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts The Contractor shall utilize products and material made from biobased materials (e.g. biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible in the performance of this contract without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. Information about this requirement and a catalog of products are available at the BioPreferred Web Site.

The Contractor shall utilize products and material to the maximum extent possible in the performance of this contract from EPA’s list of designated products and the accompanying recommendations for post-consumer content and recovered materials content in the following eight categories: Construction products, Landscaping products, Nonpaper Office Products, Paper and Paper Products, Park and Recreation products, Transportation Products, Vehicular Products, and Miscellaneous Products.

Compliance with the USDA Biobased requirements requires Contractors to report the purchase of biobased products under service and construction contracts through the System for Award Management (https://SAM.gov) and provide a copy of the report to the Contracting Officer.

7.1 Sustainable products identified for this solicitation:

The following is a list of categories for biopreferred products and EPA products that that may be used in the performance of this contract. The list is not all inclusive; the Contractor shall research for available products.

7.1.1 BioPreferredProducts:

a Diesel Fuel Additives

(1) Any substance, other than one composed solely of carbon and/or hydrogen, that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use.

(2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20). 90% - Minimum Biobased Content.

b Hydraulic Fluids - Mobile Equipment Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes. 44% - Minimum Biobased Content.

c Penetrating Lubricants Products formulated to provide light lubrication and corrosion resistance in close tolerant internal and external applications including frozen nuts and bolts, power tools, gears, valves, chains, and cables. 68% - Minimum Biobased Content.

d Greases - Truck Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots. 71% - Minimum Biobased Content.

e Gear Lubricants Products, such as greases or oils, that are designed to reduce friction when applied to a toothed machine part (such as a wheel or cylinder) that meshes with another toothed part to transmit motion or to change speed or direction. 58% - Minimum Biobased Content.

f Fuel Conditioners Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system. 64% - Minimum Biobased Content.

h Erosion Control Woven or non-woven fiber materials manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth. 77% - Minimum Biobased Content.

g 2-Cycle Engine Oils Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear. 34% - Minimum Biobased Content.

7.1.2 EPA Designated Products:

Plastic trash bags, printer ribbons, toner cartridges, print & writing papers, Traffic Barricades, Traffic Cones, Engine Coolants, Rebuilt Vehicular Parts, Re-refined lubricating oils, retread tires, manual grade strapping, signage, sorbents.

C.8 Definitions Acceptable Quality Level: The allowable leeway or variance from a standard before the government will reject the specific service. An AQL does not say that the contractor may knowingly offer defective service. It implies that the government recognizes that defective performance sometimes happens unintentionally. As long as the percent of defective performance does not exceed the AQL, the service will not be rejected by the government. The contractor, however, must re-perform the defective service when possible.

Biobased Products: See Sustainable Acquisitions Contracting Officer (CO): Individual with authority to bind the government with their signature on the contract.

Contracting Officer Representative (COR): Individual(s) designated to act on the behalf of the CO within the delegation given them in writing.

Period of performance (also Performance period or Contract time): All calendar days allowed for completion of contract work. Includes all days of the week including weekends and holidays.

Quality Assurance: Those actions taken by the government to check goods or services to determine that they meet the requirements of the SOW.

Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance surveillance. The document contains information about how the government will assess performance, checklists, and may contain decision tables.

Quality Control: Those actions taken by a contractor to control the production of goods or services so that they will meet the requirements of the Performance Statement of Work. Refer to Inspection and Acceptance in clause 52.212-4 and Contractors Quality Control Plan as described in Section E.

Quality Control Plan: Contractors plan for self-monitoring work prior to Government inspection and acceptance. See Section E.

Random Sampling: A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.

(Acceptable) Service: A job performed to the standard and within the acceptable quality level. The contractor must do the specific job, and meet the standard, and meet the acceptable quality level before one can say that performance has been acceptable and that he/she should be paid.

Standard: An acknowledged measure of comparison.

Stewardship Contracting: An exchange of goods/products for services including construction.

Sustainable Acquisitions (FAR Part 23.4 – Use of recovered materials and biobased products)

a. Biobased Products: Managed by the U.S. Department of Agriculture (USDA), the goal of the BioPreferred program is to increase the purchase and use of biobased products. The BioPreferred program was created by the 2002 Farm Bill and reauthorized and expanded as part of the Agricultural Act of 2014 (the 2014 Farm Bill). The program's purpose is to spur economic development, create new jobs and provide new markets for farm commodities. The increased development, purchase, and use of biobased products reduce our nation's reliance on petroleum, increase the use of renewable agricultural resources, and contribute to reducing adverse environmental and health impacts. Information on biobased/biopreferred products can be found at the BioPreferred Site . The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts and the provision at FAR 52.223-1, Biobased Product Certification.

b. EPA-designated items: Products that are or can be made with recovered material. The Comprehensive Procurement Guideline (CPG) program is part of EPA's continuing effort to promote the use of materials recovered from solid waste. Buying recycled-content products ensures that the materials collected in recycling programs will be used again in the manufacture of new products. See FAR 52.223-17 Affirmative Procurement of EPA-designated items in Service and Construction Contracts.

C.8.1 Technical Definitions – See Appendices.

SECTION D – PACKAGING AND MARKING

There are no clauses in this section.

Carbon emission release from truck hauling will be put in consideration

SECTION E - INSPECTION AND ACCEPTANCE

General Clauses and Provisions Pertaining To All Items E.1 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov/far

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

E.2 Contractor Quality Control Inspection System The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

E.3 Acceptance The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work E.4 Government Quality Assurance Surveillance Plan Quality assurance specific to individual items will be found in Appendix A.

SECTION F - DELIVERIES OR PERFORMANCE

General Clauses and Provisions Pertaining To All Items F.1 52.252-2 Clause Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-15Stop-Work Order (Aug 1989)
52.247-55F.O.B. Point for Delivery of Government-Furnished Property (JUN 2003)
F. 2Commencement, Prosecution, and Completion of Work

The Contractor shall be required to (a) commence work under this contract in accordance with the accepted operation plan; starting work when the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire project including final cleanup of the premises by __ June 20, 2020__.

F.3 AGAR 452.211-74 Period of Performance (FEB 1988) The effective period of this contract is from May 15, 2019 through June 20, 2020.

F.4 Special Contract Time and Performance Restrictions The Contractor shall perform this contract according to the following restrictions. Additional performance restrictions may also be found in the Technical Specifications and/or on contract maps.

Contract Item or Area Description
Description of Restriction
Units: 1, 2, 5, 7, 8, 9, 13, 14, 15, 24, 26 and 34
Northern Goshawk Operation Restriction: March 1- September 15
Roads: 05, 07, 07-10, 12 and 88
Snow removal prohibited for OSV route: November 15 – May 1

F.5 Schedules and Reports Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:

ITEM DESCRIPTION
SUMBITAL DUE
COPIES REQUIRED
Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit two copies (or one electronic copy) of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the starting and completion dates of various phases of the work. The schedule shall comply with the contract time requirements in the contract (or Task Order), including, but not limited to Paragraphs F.2 and F.5. The schedule shall be provided in either 8.5’x11’ or 11’x17’ format.
With Proposal
1
Subcontractors: List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project.
With Proposal
1
Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to Paragraph H.9, “Traffic Control Plan” and the requirements included in the Appendices, if any.
10 days after issuance of Notice to Proceed
1
Soil Erosion and Water Pollution Control Plan. The Contractor shall prepare and submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after contract performance. Plan shall conform to all contract requirements, including but not limited to Paragraph H.5, “Erosion Prevention and Control”, and the requirements in the Appendices, if any.
10 days after issuance of Notice to Proceed
Safety Plan. The Contractor shall comply with the requirements of FAR 52.236-13 – Accident Prevention, for all activities under this contract. (Paragraph I.2)
With Proposal
1
Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO. Refer to E.2
With Proposal
1
Designation of Contractor personnel describing responsibilities and authorities
At prework Meeting
1
BioBased Report. Submit annually. Refer Section C.7
October 31

All schedules and reports shall be submitted to the Contracting Officer’s Representative identified by the CO, unless the Contracting Officer directs the Contractor to submit any schedules or reports directly to the CO.

SECTION G – CONTRACT ADMINISTRATION DATA

General Clauses Pertaining To All Items G.1 Payment It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber or other products will not completely offset the value of the work to be performed. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber or other products value during the contract period. When payment is made to the contractor for work performed, it will be made in accordance with FAR 52.212-4 Contract Terms and Conditions-Commercial Items (i) – Payments and 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (See clause 52.212-5). Submit certification G.8 with all invoices.

Invoices are to be submitted to: IPP The value of work completed and timber or other products removed will be documented in a Stewardship Statement of Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.

G.1.1 FINAL PAYMENT - RELEASE OF CLAIMS

The Government shall pay the amount due the Contractor under this contract after—

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed invoice; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.

G.2 Incidental Payment Items The intent of the contract is to provide for the complete performance of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

G.3 Product Payment Guarantee To guarantee payment for product in advance of cutting, Contractor may earn Stewardship Credits in advance of cutting, or provide a product payment guarantee in the form of an acceptable surety payment bond, irrevocable letter of credit (ILOC), cash, or a deposit in a Federal Depository negotiable securities of the United States.

Any earned stewardship credits and product payment guarantee together will maintain a minimum unobligated balance equal to the total value of product that has not been paid for from stewardship units released for cutting.

Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.

Product payment guarantee for a single contract shall be provided utilizing Form FS6500-12 Payment Bond.

Blanket Payment Bond:

a. Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for product from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for product payment guarantee.

b. The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor shall provide the contact information for the Forest Service representative administering the blanket payment bond to the Contracting Officer. The Forest Service representative administering the blanket payment bond will provide the Contracting Officer with documentation showing the allocation to this contract.

c. When there is to be no product cutting or removal hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract may be reallocated to other contracts at Contractor’s request.

d. Payment guaranteed with acceptable blanket payment bond for multiple contracts shall be provided utilizing Form FS-6500-12a Blanket Payment Bond.

G.4 Stewardship Credits Stewardship Credits are credits that are earned and established when work listed in the B.1 Schedule of Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber or other products value included in Schedule B.2. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.

G.5 Establishment of Stewardship Credits Notwithstanding references to payments in “Payment” clauses of this contract, payment for Stewardship Activities will be made with Product Value or other funding as indicated in the award document.

Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.

Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest Service. No credits will be established for work performed under terms of Schedule B.2.3.

G.6 Contractor Certification Contractor will submit certification with every invoice and monthly, as Stewardship Credits are established. The Contractor shall furnish the following certification indicating if for invoice, stewardship credit or both. Credit will not be received if certification is not submitted.

CONTRACTOR CERTIFICATION

|_| - Invoice and/or |_| Stewardship Credit Earned

Page
of
Unit (Region, Forest, District)
Project:
Contract No.
Name and Address of Contractor:
Invoice No.
Invoice Date:

I hereby certify, to the best of my knowledge and belief, that--

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

(Name)

(Title)

(Date)

G.7 Excess Stewardship Credits In the event there are excess (unused) established Stewardship Credits when all of the included timber or other products has been cut and removed the Forest Service, at its option, shall either add more timber or other products or make cash payment for the unused credits.

G.8 Excess Timber or Other Products Value In the event the value of the included timber or other products exceeds the total value of all of the mandatory activities plus the ordered optional activities, the Contractor shall make cash payment for the excess timber or other products value.

G.9 Refund of Excess Cash If at any time the credit balance of the Stewardship Statement of Account exceeds the charges for timber or other products removed to date and for timber or other products that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, “PRODUCT PAYMENT GUARANTEE” before additional timber or other products may be cut.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

General Clauses and Provisions Pertaining To All Items H.1 AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at the __Truckee Ranger District___, and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans.

H.2 AGAR 452.236-72 Use of Premises (NOV 1996)

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

(End of Clause) H.3 AGAR 452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

Overall Project Manager Information on key personnel qualifications are found in Section C.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.4 Safety Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees. In the event that a conflict develops between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an equitable adjustment.

H.5 Requirements of Rights-of-Way Contractor’s use on rights-of-way shall be confined to said rights-of-way and limited by the related easements and stipulations, if any, unless Contractor makes other arrangements that will not infringe upon or adversely affect the grantee’s rights. Said easements or right-of-way documents are available in the offices of the Forest Supervisor and District Ranger.

H.6 Use of Roads by Contractor Contractor is authorized to maintain roads, bridges, and other transportation facilities, as needed for harvesting Included Timber or other products on National Forest and other lands where Forest Service has such authority. The location and clearing widths of all Temporary Roads or facilities shall be agreed to before construction is started. Contractor is authorized to cut and use for construction without charge construction timber or other products designated by agreement.

Except as provided herein, Contractor is authorized to use existing National Forest roads and Specified Roads, when such use will not cause damage to the roads or National Forest resources and when hauling can be done safely. If Contractor’s use of an existing temporary or National Forest system road cannot be satisfactorily accommodated without reconstruction, Contractor shall be authorized to use such road upon agreement as to the minimum reconstruction work that Contractor shall perform before hauling.

The Contract Area Map shows existing temporary or permanent roads that for such reasons as limitations in structural capacity, safety, and protection of soil, water, and roads:

(a)Cannot be used for log hauling or
(b)May be used only under the restrictive limitations stated therein.

Contractor's use of existing roads identified on Contract Area Map by the following codes is prohibited or subject to restrictive limitations, unless agreed otherwise:

Code
Use Limitations
X
Hauling prohibited
R
Hauling restricted
U
Unsuitable for hauling prior to completion of agreed reconstruction
P
Use prohibited
A
Public use restriction
W
Regulation waiver

Roads coded A will be signed by the Forest Service to inform the public of use restrictions. Contractor's use of roads coded R, A, or W shall be in accordance with the following restrictions:

Restricted Road List

Road Number
Road Name
Termini
Map
Description of Restrictions
From
To
Legend
05, 07, 07-10, 12 and 88
Brownie
NFSR 148
NFSR 126.1B
R
Hauling and Snow Removal restricted to protect OSV route from November 15 through May 1

EOR – End of Road FS/PVT – Forest Service/Private

H.7 Road Maintenance Contractor shall maintain roads, commensurate with Contractor’s use, in accordance with Road Maintenance Requirements and the Road Maintenance Specifications (see Appendix C). Performance of road maintenance work by Contractor may be required prior to, during, or after each period of use. The timing of work accomplishment shall be based on Contractor’s Progress Schedule.

H.8 Traffic Control Plan Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations. Contractor and Forest Service shall agree to a specific Traffic Control plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except at otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUCD) and as shown on Plans, Contract Area Map, Traffic Control Plan or in specifications attached hereto.

H.9 Use by Others Forest Service shall have the right to use any road constructed by Contractor under this contract for any and all purposes in connection with the protection and administration of the National Forest. Other parties, in connection with the logging of tributary National Forest timber, may use roads constructed by Contractor hereunder when such use will not materially interfere with Contractor’s Operations. Such third party use shall be contingent upon the third party paying a fair share of maintenance cost commensurate with such commercial use. Unless otherwise provided, Forest Service shall authorize other uses of roads constructed by Contractor hereunder only if:

(a)Forest Service makes appropriate arrangements to relieve Contractor of related maintenance costs commensurate with such other uses and
(b)Such other uses will not materially interfere with Contractor’s Operations.

Where Contractor reconstructs a road having established use, the use during reconstruction and thereafter by Contractor shall be such as to reasonably accommodate such established use. Contractor shall have the right to use such reconstructed road without material additional interference from other users.

H.9.1 Closure to Use by Others A. Closure of Roads During Period of Contract.

Unless otherwise agreed in writing between Contractor and Forest Service, Contractor shall within 15 days of receipt of notice from Forest Service, install gates listed below and close gates on roads designated "To Be Closed" on Contract Area Map and listed below to effectively block access behind such gates to vehicle traffic except that constituting official use. Installation of gates shall follow closure details attached hereto and made a part hereof.

Official vehicle traffic shall constitute that use by Contractor and his employees when engaged in timber sale activities. It shall also include administrative traffic by Forest Service, and other landowners for the administration of their lands. Contractor will close gates as directed by Forest Service at the completion of daily activities or close gates after passage of each vehicle. Forest Service will monitor and administer closure activities.

Gate Location(s)

Road Number
Location
Gate

Furnished By Gate Installed By In Place

N/A

B. Closure of Roads at End of Contractor's Use.

Unless otherwise agreed in writing between Contractor and Forest Service, upon completion of use, Contractor shall effectively close to public use the following roads designated "To Be Closed" on Contract Area Map and listed below. As an element of final road maintenance and environmental or resource protection, the designated closure shall be accomplished by using the methods required for each road as described below:

Installation of barricades, which may include earth berms, logs, timber, rock, metal railing, etc., in accordance with details attached hereto and made a part hereof, including the proper barricade and closure signing.

Scarify, seed, and fertilize these travel ways full width as described in RO-KT-GT.601# Erosion Control Seeding (Appendix B).

Recontour or reshape cut or fill slopes in accordance with details attached hereto and made a part hereof; seed, scarify, and fertilize as described under RO-KT-GT.601# Erosion Control Seeding (Appendix B); pull existing drainage structures; haul designated culverts to approved stockpile site, or other work needed to obliterate or put road to bed as described in attached road logs or details.

Construct cross ditches by cutting a dip at least six (6) inches deep in the road surface and mounding the excavated material along the downgrade edge of the dip. Dips shall be cut at a sufficient angle so that they will drain to the outside of the road. They shall cross the entire width of the roadbed and be constructed at the following spacing:

Percent Grade
Maximum Spacing
2
250’
5
135’
10
80’
15
60’
20
45’

Closure Location(s)

Road Number
Location
Closure Method
Furnished

By In Place

05-70
MP 0.01 & MP 0.1
Install rock barrier and/or construct earthen berm to close access to public
Contractor
Y

11-02

Install rock barrier and/or construct earthen berm to close access to public
Contractor
Y

11-06-02

Install rock barrier and/or construct earthen berm to close access to public
Contractor
Y

88-90

Install rock barrier and/or construct earthen berm to close access to public
Contractor
Y

During the life of this contract, Contractor is authorized to install temporary barricades on the roads designated "To Be Closed." Gates with adequate and protected locks may be considered a temporary barricade. Temporary barricades shall be installed so that they may be readily opened by Contractor or Forest Service for access to Contract Area in case of fire or other emergency. Official vehicle traffic shall also include administrative traffic by Forest Service and other landowners for the administration of their lands. Contractor shall provide and post approved signs as authorized by Forest Service.

C. Contractor's Operations in areas otherwise closed to motorized vehicle.

During the period of closure specified in Section A, when Contractor's Operations are in areas otherwise closed to motorized vehicles, Contractor shall not be permitted to hunt, transport hunters, discharge firearms, or transport big game animals with vehicles within the closed areas.

H.10 Protection of Land Survey Monuments Forest Service shall appropriately designate on the ground all known survey monuments, section corners, and other corner accessories. Forest Service shall post identifying signs on two sides of each known bearing tree.

Forest Service shall arrange protective or perpetuative action that does not cause unnecessary delay to Contractor in authorized clearings, such as Clearcutting Units and road construction, and in other instances where damage to monuments, section corners, and other corner accessories is unavoidable.

Contractor shall protect all known survey monuments, witness corners, reference monuments, and bearing trees against avoidable destruction, obliteration, or damage during Contractor’s Operations. If any known monuments, corners, or accessories are destroyed, obliterated, or damaged by Contractor’s Operations, Contractor shall hire the appropriate county surveyor or a registered land surveyor to reestablish or restore at the same location the monuments, corners, or accessories at no additional cost to the Government. Such surveyors shall use procedures in accordance with the Bureau of Land Management “Manual of Instructions for the Survey of the Public Lands of the United States” for General Land Office surveys and in accordance with State law for others. Contractor shall record such survey in appropriate county records.

H.11Protection Measures Needed for Plants Animals, Cultural Resources, and Cave Resources
1.Areas, known by Forest Service prior to contract solicitation, needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground, and shall be treated as follows:

a. Unless agreed otherwise, wheeled or track laying equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s Operations within such areas in lieu of cross ditching.

b. Unless agreed otherwise, trees will not be felled into areas identified as needing special measures.

c. Contractor shall conduct operations in a manner that does not damage or disturb identified areas. In the event that protective measures identified by the Forest Service are for any reason inadequate, Contracting Officer may delay or interrupt Contractor’s operations, under this Contract, and/or modify this Contract.

d. Contractor shall immediately notify the Forest Service if its operations disturb or damage any area identified as needing special protection, and shall immediately halt its operations in the vicinity of such area until the Forest Service authorizes continued operations. In the event that Contractor's operations disturb or damage an area identified as needing special protection, then Contractor shall reimburse the Forest Service for the full cost and expense of any evaluative and remedial measures undertaken by the Forest Service in connection with such disturbance or damage. Such payment shall not relieve Contractor from civil or criminal liability under applicable law.

2. Nothing contained in this clause shall establish, or be deemed to establish any express or implied warranty on the part of the Forest Service that the Forest Service has identified all areas within the Contract Area requiring special protection, or that measures prescribed by the Forest Service for protection of such areas are adequate.

3. Following contract solicitation, additional areas needing special measures for protection may be discovered or identified; protective measures may be revised or newly prescribed; and, additional species of plants and/or animals may be added to federal lists of protected species. In such event, Contracting Officer may delay or interrupt Contractor’s operations, under this Contract, and/or modify this Contract.

4. Discovery, by either the Contractor or the Forest Service, of additional…