SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

888904

USDA FOREST SERVICE

R5 NO-CAL ACQ SERVICE AREA NCASA

3644 AVTECH PARKWAY SUITE 180

REDDING CA 96002

9AC7

PAUL WOOD

Northern California Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002

PAUL WOOD 530-226-2445

1x 01/29/2018

129AC718R0001

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

GRIFFIN CREEK BRIDGE REHABILITATION

SIX RIVERS NATIONAL FOREST

NAICS: 237310

SIZE STANDARD: $36.5 Million

Set Aside: 100% Total Small Business

Government estimate between $500,000 - $1,000,000

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 75 calendar days and complete it within ________________ ________________ calendar days after receiving

02/28/2018

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

R5 NO-CAL ACQ SERVICE AREA NCASA

3644 AVTECH PARKWAY SUITE 180

REDDING CA 96002

9AC7

PAUL M. WOOD

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

129AC718R0001

Griffin Creek Bridge Rehabilitation

Delivery: 12/31/2018

Delivery Location Code: 9A47

SIX RIVERS NATIONAL FOREST

1330 BAYSHORE WAY

EUREKA CA 95501 US

FOB: Destination

001 Griffin Creek Bridge Rehabilitation

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Six Rivers NF, 129AC718R0001 Griffin Creek Bridge Rehabilitation Page 4 of 32

PART I - SCHEDULE OF ITEMS

SECTION B - Supplies or Services and Prices

GRIFFIN CREEK BRIDGE REHABILITATION

Six Rivers National Forest

ITEM

NO. DESCRIPTION UNIT QUANTITY UNIT

PRICE AMOUNT

151(01) Mobilization LS 1 $ ___________ $ ___________

152(13) Survey and Staking LS 1 $ ___________ $ ___________

157(13) Soil Erosion and Pollution Control LS 1 $ ___________ $ ___________

201(02) Clearing and Grubbing LS 1 $ ___________ $ ___________

203(05) Removal of Structures and Obstructions LS 1 $ ___________ $ ___________

204(01) Roadway Excavation, Compaction Method C CY 65 $ ___________ $ ___________

208(01) Structure Excavation CY 35 $ ___________ $ ___________

208(03) Structure Backfill CY 29 $ ___________ $ ___________

*301(01) Untreated Aggregate Course, Grade C TON 75 $ ___________ $ ___________

*403(01) Hot Asphalt Concrete Pavement TON 30 $ ___________ $ ___________

552(01) Structural Concrete, Class A (AE) CY 79 $ ___________ $ ___________

*552(13) Drill & Bond Dowels (Chemical Adhesive) EA 12 $ ___________ $ ___________

554(01) Reinforcing Steel LB 20,200 $ ___________ $ ___________

555(01) Structural Steel Bridge, Furnished, Fabricated and Erected LB 91,200 $ ___________ $ ___________

556(03) Remove and Reset Bridge Railing LF 334 $ ___________ $ ___________

563(01) Painting, Bridge Structure LS 1 $ ___________ $ ___________

*564(01) Elastomeric Bearing Device EA 6 $ ___________ $ ___________

*633(06) Object Markers, Type 3 EA 4 $ ___________ $ ___________

635(04) Barricades, Type III LF 40 $ ___________ $ ___________

635(07) Construction Signs SY 9 $ ___________ $ ___________

TOTAL $____________

Griffin Creek Bridge Rehabilitation Page 5 of 32

Schedule of items notes:

1. Offeror must price each item to be considered for award.

2. Offers for quantities less than those listed may be rejected.

3. Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the

Schedule of Items; AC=Acre, AQ= Actual Quantity, CQ=Contract Quantity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, LSQ= Lump Sum Quantity, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton.

CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quantity.

B.1 NOTE REGARDING BOND PREMIUMS:

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP- 03 109.01 unless otherwise noted

B.2 NOTICE TO OFFERORS:

Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation’s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.

Griffin Creek Bridge Rehabilitation Page 6 of 32

SECTION C - Description/Specifications/Statement of Work

C.1 SCOPE OF WORK

This project includes replacement of the existing Griffin Creek Bridge superstructure with a single span steel girder bridge with a concrete deck. The existing two span bridge is 117 feet long. This project replaces the superstructure of the bridge while retaining and modifying the existing abutments, and demolition of an existing pier. Work also includes roadway reconstruction including, aggregate base and surface courses, and asphalt paving.

C.2 LOCATION OF PROJECT

Griffin Creek Bridge is located in Del Norte County, California, approximately 16 miles northeast of the town of Gasquet; where Forest Service Road (FSR) 18N07crosses over Griffin Creek (off highway 199). The site can be reached by travelling north on highway 101 from Crescent City to highway 199 north, travelling 29 miles northeast to the intersection with FSR 18N07.

C.3 OPERATING SEASON

There are no seasonal restrictions other than what is noted below.

There may be limited operating periods in some areas due to wildlife concerns. These will be identified prior to start of project.

After October 15th, wet weather operation restrictions shall apply to all roads and work shall be tightly controlled and monitored for erosion control and preventative measures. At Forest Service discretion, work may be suspended for winter weather when conditions warrant.

C.4 OTHER REQUIREMENTS

Camping Requirements - Before any camp, storage, or service area is operated on National Forest lands or lands administered by the Forest Service, written permission shall be obtained through the Forest Service. See District office for camping permit form and terms. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor.

Contractors and their employees shall comply with the rules and regulations governing the operation of the premises of which they occupy.

Fire Plan - Contractor shall abide by the PAL Fire Plan Checklist provided in addition to the specifications

Griffin Creek Bridge Rehabilitation Page 7 of 32

C.5 DRAWINGS AND SPECIFICATIONS

Project Drawings: see Section J, List of Documents, Exhibits and other Attachments

Specifications:

[ ] Construction Standard Institute (CSI) specifications These specifications are physically incorporated in the solicitation.

[ x ] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 (US Customary Units) This document is incorporated by reference and is available on the web in either MS Word (https://flh.fhwa.dot.gov/resources/specs/fp-03/) or Acrobat (https://flh.fhwa.dot.gov/resources/specs/fp-03/fp-03usc.pdf ) It is also available as a wire-bound book that can be purchased from the US Government Printing

Office:

Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001 Stock Number: 050-001-00341-4 (U.S. Customary)

[ x ] AASHTO LRFD Bridge Design Specifications,6th Edition, with 2013 Interim Revisions American Association of State Highway and Transportation Officials 341 National Press Building Washington, DC 20024 https://bookstore.transportation.org/

Special Project Specifications are physically incorporated within this solicitation.

The following Standard and Special Project Specifications are applicable to this contract:

# Description Date 101 Terms, Format, and Definitions 2003

102 Bid, Award, and Execution of Contract 2003

103 Scope of Work 2003

104 Control of Work 2003

105 Control of Material 2003

106 Acceptance of Work 2003

107 Legal Relations and Responsibility to the Public 2003

109 Measurement and Payment 2003

151 Mobilization 2003

152 Construction Survey and Staking 2003

155 Schedules for Construction Contracts 2004

157 Soil Erosion Controls 2005

201 Clearing and Grubbing 2003 https://flh.fhwa.dot.gov/resources/specs/fp-03/ https://flh.fhwa.dot.gov/resources/specs/fp-03/fp-03usc.pdf http://bookstore.gpo.gov/ https://bookstore.transportation.org/

Griffin Creek Bridge Rehabilitation Page 8 of 32

203 Removal of Structures and Obstructions 2003

204 Excavation and Embankment 2009

208 Structure Excavation and Backfill for Selected Major Structures

261 Rock Dowels

301 Untreated Aggregate Courses 2003

403 Hot Asphalt Concrete Pavement 2003

552 Structural Concrete 2003

553 Prestressed Concrete

554 Reinforcing Steel 2003

555 Steel Structures 2003

556 Bridge Railing 2003

563 Painting 2003

564 Bearing Devices 2003

633 Permanent Traffic Control 2003

635 Temporary Traffic Control 2003

All specifications not included in the specification listing, but referenced by listed specifications, are applicable. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

C.6 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made a part of this solicitation and any resultant contract.

SECTION D – Government Furnished Property

Government-Furnished Materials – NONE

SECTION E - Inspection and Acceptance

E.1 Inspection of Construction FAR 52.246-12 (AUG 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not—

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

Griffin Creek Bridge Rehabilitation Page 9 of 32

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may—

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

Griffin Creek Bridge Rehabilitation Page 10 of 32

SECTION F - Deliveries or Performance

F.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov/far/www.usda.gov/procurement/policy/agar.html Variation in Estimated Quantity, FAR 52.211-18 (APR 1984) Suspension of Work, FAR 52.242-14 (APR 1984)

F.2 Commencement, Prosecution, and Completion of Work, FAR 52.211-10 (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than December 31, 2018 after the effective date of the notice to proceed. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by October 15th, 2018. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

F.3 Schedules for Construction Contracts, FAR 52.236-15 (APR 1984)

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

F.4 Winter Shutdown

When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified.

http://www.acquisition.gov/far/ http://www.usda.gov/procurement/policy/agar.html

Griffin Creek Bridge Rehabilitation Page 11 of 32

SECTION G - Contract Administration Data

G.1 Postaward Conference, AGAR 452.215-73 (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within 30 days after the date of contract award. The conference will be held at a mutually agreeable location.

G.2 Payment and Invoices

(a) All invoices shall be submitted via the Department of Treasury's Invoice Processing Platform (IPP).

Paper copies of invoices will no longer be accepted. This is a mandatory requirement initiated by the U.S. Department of Agriculture. Failure to comply with this direction may result in late or delayed payments.

(b) Invoice Processing Platform (IPP) (Invoice Submission Procedures) The "Submit Invoice-to" address for invoices on USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices for work performed under this contract shall be submitted via the electronic Invoice Processing Platform. This platform is managed by the U.S. Department of Treasury and additional information is available at this website: https://www.ipp.gov/index.htm.

After award of a contract, please make sure your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account, there is no pre-award registration. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is current in the System for Award Management (SAM) account for your company (www.sam.gov). Recent update(s) to a SAM registration need time to process from a “Pending” to in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the POC identified in the SAM account. For assistance with questions on the IPP enrollment process, creating invoices, or uploading attachments to IPP please contact the IPP help desk phone number is 1-866-973-3131.

Invoices in IPP are the official request for payment. Supporting information is required for all construction progress payments and shall be attached to the IPP invoice.

• The payment certification required in FAR 52.232-5 Payments under Fixed-Price

Construction Contracts must be signed and submitted for each progress payment requested,

• A breakdown of billing, based on the pricing schedule along with the progress schedule, must be included as attachments to the IPP invoice.

• When requesting final payment, attach contract release of claims to final invoice.

Additionally, the government will verify the contractor’s compliance with the submission of certified payrolls for the invoiced timeframe as required in FAR Clause 52.222-8 Payrolls and Basic Records.

The Contractor shall submit payrolls weekly for each week in which any contract work is performed by the prime or any subcontractors. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information required in the contract clause (form WH-347 is an optional form compliant with the requirement and is available for download at www.dol.gov). State or County government forms lack the specific certification requirement and are not acceptable without supplementation of the certification statement.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm http://www.sam.gov/ http://www.dol.gov/

Griffin Creek Bridge Rehabilitation Page 12 of 32

SECTION H - Special Contract Requirements

H.1 Emergency Response, AGAR 452.236-77 (NOV 1996)

(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.

(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

H.2 Emergencies Fire Plan

[X]See Section J, Fire Plan [ ]Not applicable; however, Contractors are required to comply with State law during fire season.

Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan (Section J):

[ ](a) Trail Construction - 100 meters on either side of the centerline [ ](b) Construction of Structures - 100 meters around the perimeter of the project [X](c) Road Construction - 400 meters on either side of the centerline [ ](d) Special for this project Utility Services

H.3 Traffic Control The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Suitable warning signs shall be provided to properly control and direct traffic. The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the project crosses or coincides with an existing road or trail. The Contractor will be responsible for obtaining a Dual Encroachment Permit from the California Department of Transportation under an existing Encroachment Permit obtained by the Government.

H.4 Superintendence by Contractor In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.

Griffin Creek Bridge Rehabilitation Page 13 of 32

H.5 Loss, Damage or Destruction Equipment Furnished with Operator: The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.

Other: Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.

H.6 Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)-- will be identified for the contractor before work commences.

If any new cultural resources or archeological sites are discovered during implementation, all work shall halt until the Contracting Officer and Heritage Program Manager is notified and clearance to continue work is approved. Should inadvertent effects to or unanticipated discoveries of human remains be made on Region 5 lands, the County Coroner [California Health and Safety Code 7050.5(b)] shall be notified immediately. If the remains are determined to be Native American or if Native American (Indian) cultural items pursuant to NAGPRA are uncovered, the provisions of NAGPRA and its regulations at 43 CFR 10 and ARPA at 43 CFR 7 shall be followed on federal lands.

H.7 Spill Plan If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan.

Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations.

The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.

H.8 Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.

Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.

If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.

Griffin Creek Bridge Rehabilitation Page 14 of 32

PART II – CONTRACT CLAUSES

I.1 Clauses Incorporated by Reference, FAR 52.252-2 (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATIONS (FAR)

52.202-1 Definitions. (NOV 2013) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant against Contingent Fees. (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (May 2011) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debarment. (OCT 2015) 52.215-2 Audit and Records - Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set Aside (NOV 2011) 52.219-14 Limitations on Subcontracting. (JAN 2017) 52.219-28 Post-Award Small Business Program Representations (JUL 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation (MAY 2014) 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (MAY 2014) 52.222-6 Davis-Bacon Act. (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity Action for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages under Executive Order 13658 (DEC 2015)

SECTION I - Contract Clauses http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html

Griffin Creek Bridge Rehabilitation Page 15 of 32

52.223-6 Drug-Free Workplace. (MAY 2001) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent. (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets. (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit. (NOV 2014) 52.228-15 Performance and Payment Bonds - Construction. (OCT 2010) 52.229-3 Federal, State, and Local Taxes. (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-17 Interest. (MAY 2014) 52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (JUL 2013) 52.233-1 Disputes. (MAY 2014) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.246-21 Warranty of Construction. (MAR 1994) 52.248-3 Value Engineering - Construction. (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.253-1 Computer Generated Forms. (JAN 1991)

AGRICULTURE ACQUISITION REGULATION

452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) 452.236-71 Prohibition against the Use of Lead-Based Paint. (NOV 1996) 452.236-72 Use of Premises. (NOV 1996) 452.236-73 Archaeological or Historic Sites. (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996) 452.236-76 Samples and Certificates. (FEB 1988)

I.2 Affirmative Procurement of Biobased Products under Service and Construction Contracts, FAR 52.223-2 (SEP 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased

Griffin Creek Bridge Rehabilitation Page 16 of 32 products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

I.3 52.225-9 Buy American—Construction Materials. (MAY 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material. “Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which http://www.biopreferred.gov/ http://www.sam.gov/ http://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

Griffin Creek Bridge Rehabilitation Page 17 of 32 nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE

[Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph

(b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123

Griffin Creek Bridge Rehabilitation Page 18 of 32

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material Domestic construction material

Item 2:

Foreign construction material Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

I.4 Bid Guarantee, FAR 52.228-1 (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds -

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 Million, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

Griffin Creek Bridge Rehabilitation Page 19 of 32

PART III – LIST OF DOCUEMNTS, EXHIBITS AND OTHER

ATTACHEMENTS

J.1 Attachments to Statements of Work/Specifications, AGAR 452.211-73 (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

Attachment No. Description Number of Pages

1 Project Specifications 35

2 Drawings 15

3 Fire Plan 9

4 Davis Bacon WD, CA4, 01/26/2018 19

5 SF-24, Bid Bond Form 2

SECTION J - List of Documents, Exhibits, and Other Attachments

Griffin Creek Bridge Rehabilitation Page 20 of 32

K.1 FAR 52.223-1 Biobased Product Certification MAY 2012) As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005

(7 U.S.C. 8102(c)(3)), the offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7…