129AC718Q0051-0002.pdf
PDF 173 KB Posted
- Attached to
- HCWC Barracks Renovation Federal contract opportunity
- Solicitation number
- 129AC718Q0051
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendees.pdf | ||
| 129AC718Q0051-0001.pdf | ||
| Q&A_Version_1_-_073018.docx | DOCX document | |
| WD_CA180021_dtd_010518,_Modification_0.pdf | ||
| Project_Plans.pdf | ||
| 129AC718Q0051.pdf | ||
| Experience_Questionaire.docx | DOCX document | |
| Project_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
129AC718Q0051
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9AC7
SUSANVILLE CA 96130
2550 RIVERSIDE DRIVE ROOM 174
R5 NO-CAL ACQ SERVICE AREA NCASA
USDA FOREST SERVICE
9AC7
REDDING CA 96002
3644 AVTECH PARKWAY SUITE 180
R5 NO-CAL ACQ SERVICE AREA NCASA
USDA FOREST SERVICE
07/31/20180002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/28/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
129AC718Q0051, Hat Creek Work Center Barracks Renovation is amended to:
a. update/correct Schedule of Items to correct some errors/omissions; and
b. clarify bonding requirements after award.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KIM A. DELEON
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Scope of Contract
This project is a follow on contract from two other contracts, a Hazardous Material Abatement contract, and Repair Storm Damaged Barracks, Phase I contract, which replaced the entire roof and all of the trusses. This project will complete the repairs to the barracks. The work will consist of the residing and painting of the exterior of the building per plans, reconfiguration and installation of attic and soffit vents, replacement of two storm damaged doors and reframing of the rough opening for one of those doors. Reinstallation of HVAC duct work, replacement of the Air Conditioning equipment and refrigerant, repairing the furnace and re-commissioning of the HVAC system, reinstalling and recommissioning of the plumbing and wall insulation in affected areas and attic insulation for entire building. The work will include installation of two new Government furnished hot water heater(s), installation and finishing of drywall on walls and ceiling in affected areas, as well as completion of the demolition and reinstallation of the electrical wiring for the building. Work shall include replacement of building lighting with LED style lights, taping and texturing of drywall on ceilings and walls and painting of the entire interior painted surfaces as well as removal of existing carpet and vinyl sheet flooring and replacement with vinyl plank flooring building wide. Project will also replace a solid oak pantry door in the kitchen and restore the T.V. cabinet in the lounge and the closets in room 1 and restore telephone service to kitchen.
Project Location
The project is located on the Hat Creek Ranger District, Hat Creek Work Center, 17696 Highway 89, Hat Creek, CA 96040
Schedule of Items
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
150501 Mobilization (at 10% Base Bid) 1 LS $ $
074623 Structural Repairs 1 LS $ $
092900 Insulation/Drywall Repairs 1 LS $ $
096600 Resilient Tile Flooring 1490 SF $ $
099000 Painting/Cabinet Work 1 LS $ $
220000 Plumbing Repairs 1 LS $ $
230000 HVAC Repairs 1 LS $ $
260010 Electrical Repairs 1 LS $ $
TOTAL AMOUNT $
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 1510501 Mobilization.
Payment will be made on actual work performed unless otherwise noted.
There is a requirement for payment and performance protections (payment bond and performance bond or Irrevocable Letter of Credit (ILC)) if quote is over $150,000 (only payment bond if less than $150,000). The payment bond and performance bond or ILC will be for 100% of the award price and submitted within 10 days after contract award. See Section 00 72 00 for additional information. There is no bid guarantee required.