Fuels Reduction IDIQ-Mechanical Thinning
Solicitation number
1284M819R0002
Issued by

About this file

This document is an amendment to a solicitation for fuels reduction services through mechanical thinning activities. The Forest Service Intermountain Region is seeking contractors to perform thinning, chipping, mastication, mowing, piling, skidding, decking, and unit preparation on various acres. Pricing is to be provided on a per acre basis for each specified line item treatment or activity. Control lines and water barring are also required services priced per mile or foot. The amendment provides additional details on the description of work for each treatment or activity and modifies the schedule of items. It requires acknowledgement of receipt by interested offerors by the specified date in order to be considered for award of the indefinite delivery, indefinite quantity contract.

The purpose of this amendment is to: 1. Make changes to the Schedule of Items. 2. Add/correct verbiage to the Description of Work/Statement of Work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1284M819R0002 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

BOISE ID 83709-1663

1249 S VINNELL WAY STE 200

ATTN BECKY ROCCO

SW IDAHO-NEVADA ACQUISITION CENTER

84M8

OGDEN UT 84401

324 25TH STREET

INTERMOUNTAIN REGION

12/11/20180002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/30/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1. Make changes to the Schedule of Items.

2. Add/correct verbiage to the Description of Work/Statement of Work.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

BECKY A. ROCCO

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS: Fuels Management-Mechanical Thinning Activities

Line Item Description Qty. Unit

Maximum Pricing Per Acre Base Option 1 Option 2

8.A Thinning Each Acre 8.B Chipping Each Acre 8.C Mastication Each Acre 8.D Mowing Each Acre 8.E Wet Mowing Each Acre 8.F Harrowing Each Acre 8.G Chaining Each Acre 8.H Piling Each Acre 8.I Skidding and/or Decking Each Acre 8.J Unit Preparation Each Acre 8.K Control Line and Water Barring Each Mile/Foot

J. Unit Preparation Unit preparation is combining any treatments to achieve a desired outcome. This could be for prescribed burning purposes, fire suppression tactics, improved fire and public safety, and forest health. These attribute to fire and fuel management objectives and noncommercial timber objectives.

An example would be to thin the stand to a desired spacing, pile all material to a certain height and spacing, and lastly cover the piles with approved cover material. The task order will outline the treatment specifications.

Thinning criteria are the same as stated above.

Chipping criteria are the same as stated above.

Mastication criteria are the same as stated above.

Mowing criteria are the same as stated above.

Wet Mowing criteria are the same as stated above.

Harrowing criteria are the same as stated above.

Chaining criteria are the same as stated above.

Piling criteria are the same as stated above.

Skidding and Decking criteria are the same as stated above.

K. Control Line and Water Barring Control Line is a constructed or natural barrier and treated fire edge used to control a fire.

Treatment specifications for control lines are determined by the task order.

The Forest Service will designate control lines (if constructed) on the ground and provide the Contractor with a written description of the work standards in the Silvicultural Summary Prescription or the Task Order.

Unless otherwise specified in the task order, mechanical constructed control line consists of utilizing mechanized equipment to scrape a continuous mineral soil line, as determined in the task order. Cut material and existing down wood removed from the control line shall be scattered within the cutting area and not windrowed or otherwise concentrated adjacent to the control line. All existing stumps and snags within the control line clearing limits shall be cut flush at ground level and/or scraped around down to mineral soil to remove fuels and prevent ignition. Do not mix slash with side cast material and control line shall be constructed on the exterior/interior edge of the existing or newly constructed fuel break, or as specified for unit preparation.

The Contractor shall not move to a new unit without completion of treatment.

Waterbars are trenches cut at a 45-degree angle across the fireline to deflect water and reduce erosion.

All treatment specifications will be identified in the task order. These guidelines should be followed:

• Avoid waterbars on scablands with a slope less than 20%

• Waterbars should be directed outside the unit. They should follow natural topography and tailed out towards vegetation.

• Where waterbars drain into the unit, use brush, rocks, or other natural vegetation to limit erosion.

• Cut in the waterbar- do not simply push up loose soil.

• Modify the spacing to take best advantage of the terrain, rocks, roots, brush, and natural drainage.

Avoid unstable terrain.