CSI BUILDING SPECS
TABLE OF CONTENTS:
| SPECIFICATION |
| PAGE |
SECTION 01770 – CLOSEOUT PROCEDURES
SECTION 02205 - BARRIER ROCKS
SECTION 02217 - TENT PADS
SECTION 02218 – SINGLE/DOUBLE CAMPGROUND UNITS
SECTION 03305 – CONCRETE FOR MINOR STRUCTURES
SECTION 10415 – FEE STATION AND SITE RECREATIO SIGNS
SECTION 10416 – SITE ENTRANCE SIGNS
| SECTION 13129 - INSTALLATION OF PRECAST CONCRETE TOILET AND UTILITY BUILDINGS |
| 26 |
Angel Creek Campground Page 21 of 28
SECTION 01770
CLOSEOUT PROCEDURES
PART - GENERAL
PART 1 -
SCHEDULE 0 - SUMMARY
1.1 This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:
SPEC WRITER: ADJUST LIST BELOW TO SUIT PROJECT.
A. Inspection procedures.
B. Project Record Documents.
C. Operation and maintenance manuals.
D. Warranties.
E. Instruction of Government personnel.
F. Final cleaning.
G. Final “As Built” Drawings
SCHEDULE 1 - SUBSTANTIAL COMPLETION
1.1 Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
SPEC WRITER: DELETE ITEMS BELOW NOT APPLICABLE OR REVISE TO SUIT PROJECT.
A. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
B. Advise Contracting Officer (CO) of pending insurance changeover requirements.
C. Submit specific warranties, maintenance service agreements, final certifications, and similar documents.
D. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
E. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, damage or settlement surveys, property surveys, and similar final record information.
F. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
G. Make final changeover of permanent locks and deliver keys to CO. Advise Government personnel of changeover in security provisions.
H. Complete startup testing of systems.
I. Submit test/adjust/balance records.
J. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.
K. Submit changeover information related to Government occupancy, use, operation, and maintenance.
L. Complete final cleaning requirements, including touchup painting.
M. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
1.2 Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
A. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
B. Results of completed inspection will form the basis of requirements for Final Completion.
SCHEDULE 2 - FINAL COMPLETION
1.1 Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
A. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
B. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
C. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
1.2 Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
A. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
1.3 Final “As Built” Drawings: Drawings shall include: campground road and spurs (existing and new), campsite locations, toilet locations, sign locations, kiosk locations, and culvert size and location.
SCHEDULE 3 - LIST OF INCOMPLETE ITEMS (PUNCH LIST)
1.1 Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
A. Organize list of spaces in sequential order, starting with exterior areas first and proceeding from lowest floor to highest floor.
B. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.
SCHEDULE 4 - PROJECT RECORD DOCUMENTS
1.1 General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.
SCHEDULE 5 - OPERATION AND MAINTENANCE MANUALS
1.1 Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system. Include operation and maintenance data required in individual Specification Sections and as follows:
A. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations.
B. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.
1.2 Organize operation and maintenance manuals into suitable sets of manageable size. Bind and index data in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, with pocket inside the covers to receive folded oversized sheets. Identify each binder on front and spine with the printed title "OPERATION AND MAINTENANCE MANUAL," Project name, and subject matter of contents.
SCHEDULE 6 - WARRANTIES
1.1 Submittal Time: Submit written warranties on request of CO for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.
1.2 Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.
A. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch (115-by-280-mm) paper.
B. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.
C. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.
1.3 Provide additional copies of each warranty to include in operation and maintenance manuals.
PART 2 – PRODUCTS
PART 2 -
SCHEDULE 0 - MATERIALS
2.1 Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
PART 3 - FINAL CLEANING
PART 1 -
PART 2 -
PART 3 -
SCHEDULE 0 -
SCHEDULE 1 -
PRODUCT DATA SHEET 0 -
3.1 General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
3.2 Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 01770
01770
CLOSEOUT PROCEDURES
SECTION 02205
BARRIER ROCKS
PART 1 – GENERAL
0. summary A. This item shall consist of collecting, hauling, and placing barrier rocks. They shall be placed and installed in conformity with the details as shown on the drawings at the locations staked by the contracting Officer, (CO).
0.1 METHOD OF MEASUREMENT
A. The quantity to be measured shall be the number of existing barrier rocks salvaged and reset or the number of native barrier rocks of the acceptable size and characteristics, placed, and accepted.
PART 2 – PRODUCTS
1.
1.1 GENERAL
A. Rock: The rock used for this work shall be angular or rounded, sound, hard, and free from laminations, fractures, or other structural defects. They shall be of such quality that they will not disintegrate on exposure to water or weathering.
B. Rocks used shall have a volume of greater than 8 cubic feet (approximately 1300 pounds).
C. Source: Existing barrier rocks to be salvaged and reset will be marked by the CO. Rocks to be salvaged and reset are approximately 15 on site. Native barrier rocks will be obtained from the National forest Lands when directed.
D. Source: Contractor shall provide and install approximately 20 barrier rocks from outside source.
PART 3 – EXECUTION
2.
2.1 PROTECTION OF TREES AND VEGETATION
A. All work under this item shall be done in such a manner that trees and larger vegetation are not damaged.
2.2 EXCAVATION
A. All barrier rock shall be placed according to detailed drawings.
B. All excavated material 3 inches and smaller shall be used for backfill of barrier rock.
C. All material not suitable for backfill shall be segregated. Stockpiled, and disposed of at the disposal site.
D. Excavation shall be of such size and depth that 30 to 50 percent by volume of the placed barrier rock is set below finished grade or natural ground as the specific location may dictate.
2.3 PLACING OF ROCK BARRIERS
A. Rock barriers shall be placed according to detailed spacing shown on drawings.
B. Fifty to 70 percent of rock volume shall be visible when work is complete.
2.4 COMPACTION
A. Accepted segregated backfill material used in placing the barrier rock shall be placed by hand and compacted with a minimum of three passes of an approved mechanical tamper.
2.5 CLEANUP AND EXCESS MATERIAL DISPOSAL
A. After the barrier rocks have been placed and the backfill completed, the general area shall be cleaned up by removing all debris and material not utilized.
B. Any excess excavated material that can be transported less than 300 feet within the total project area and used in accordance with other project specifications will not be paid for separately. For disposal of excavated material in excess of total project needs or material not meeting other specifications, the Contractor shall see Section 02135, “Waste Material Disposal.”
END OF SECTION 02205
02205 Barrier Rock
SECTION 02217
TENT PADS
PART 1 - GENERAL
SUMMARY
This work shall consist of construction of tent pads. It includes: furnishing the treated lumber, rebar, and surfacing material; clearing; excavation; and constructing the pads in accordance with these specifications and details as SHOWN IN THE DRAWINGS.
QUANTITIES OF TENT PADS
SPEC WRITER: ADJUST NUMBERS OF CAMPSITES BELOW TO SUIT PROJECT.
spec writer: edit number of pads below. below are examples.
Contractor shall install 11 tent pads.
JOB CONDITIONS
Traffic:
Conduct site clearing operations to ensure minimum interference with roads and other adjacent occupied or used facilities.
Do not close or obstruct streets, walks or other occupied or used facilities without permission from authorities having jurisdiction.
Protection of Existing Improvements:
Provide protection necessary to prevent damage to existing improvements indicated to remain in place.
Protection of Existing Trees and Vegetation:
Protect existing trees and other vegetation indicated to remain in place, against unnecessary cutting, breaking or skinning of roots, skinning and bruising of bark, smothering of trees by stockpiling construction materials or excavated materials within drip line, excess foot or vehicular traffic, or parking of vehicles within drip line.
Provide temporary guards to protect trees and vegetation to be left standing.
Where any trees are damaged, or where limbs are required to be trimmed or removed because of operations under this contract, or because of interference with new construction, any cutting or removal of limbs or branches shall be done only with prior approval of the Contracting Officer (CO).
Solvents, oils, and other material, which may be harmful to plant life, shall be disposed of in containers and removed from the site. At the completion of the work, any contaminated soil shall be removed and replaced with topsoil.
PART 2 - PRODUCTS
TREATED LUMBER
Treated lumber shall be rough-sawn, pre-cut and pre-drilled Douglas Fir No. 2 Grade or Hem Fir No. 2 Grade, as grade by WWPA.
Size:
Border Edge - 6" x 6".
REINFORCING BAR (RE-BARS)
ASTM A 615, grade 40 unless other grade indicated on the drawings.
Size:
AS SHOWN ON DRAWINGS.
SURFACE MATERIAL
Source:
Materials shall be obtained from a commercial source. The contractor shall submit test results for aggregate gradation and a Certificate of Compliance that states gradation meets contract requirements. SEE DRAWINGS for material size.
Sampling and testing of the material before incorporation into the work shall be in accordance with AASHTO requirements and shall occur as follows:
For commercially produced aggregates: at the producer's plant or stockpile.
These test results shall not preclude later sampling and testing for final acceptance after final processing of the material.
Crushing, screening, and mixing plants shall be equipped with sampling devices.
The contractor shall take additional samples as required to validate the certification.
PART 3 - EXECUTION
SITE CLEANING
General:
Remove trees, shrubs, grass and other vegetation, improvements, or obstructions interfering with installation of new construction.
Remove such items elsewhere on site or premises as specifically indicated.
Removal includes digging out stumps and roots.
Carefully and cleanly cut roots and branches of trees indicated to be left standing, where such roots and branches obstruct new construction.
Clearing shall be kept to a minimum within the specified working limits and care exercised to not damage the root system of adjacent trees or shrubbery.
Topsoil:
Topsoil is defined as friable clay loam surface soil found in a depth of not less than 4". Satisfactory topsoil is reasonably free of subsoil, clay lumps, stones, and other objects over 2" in diameter, and without weeds, roots, and other objectionable material.
Where trees are indicated to be left standing, stop topsoil stripping a sufficient distance to prevent damage to main root system.
Clearing and Grubbing:
Clear site of trees, shrubs and other vegetation, except for those indicated to be left standing.
Completely remove stumps, roots, and other debris protruding through ground surface.
Use only hand methods for grubbing inside drip line of trees indicated to be left standing.
Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated.
Place fill material in horizontal layers not exceeding 6" loose depth, and thoroughly compact to a density equal to adjacent original ground.
Removal of Improvements: Remove existing above-grade and below-grade improvements necessary to permit construction, and other work as indicated.
TREATED LUMBER
Timber to be laid on a continuous solid soil surface.
Straight splices shall be kept to a minimum. Straight splices shall overlap by 6 inches.
All timber length, lap joints and holes will be cut and drilled, and then treated with ACQ (Alkaline Copper Quaternary) and shall be rated for continuous ground contact.
All joints shall be lapped and pinned.
If tent pad is located directly adjacent to the campground unit, the common timber border shall be eliminated.
REINFORCING BARS (RE-BARS)
All re-bar pins shall be placed 3 inches minimum from center of rebar to edge of timbers.
Predrilled holes for re-bar.
SURFACING MATERIAL
After treated lumber edge is complete, the area inside the treated lumber shall be constructed with surface material and compacted to the density equal to adjacent original ground.
The surfacing material shall be spread in a uniform layer, with no segregation of size, and to a loose depth that shall compact to the required compacted depth.
Removing all debris and material not utilized shall clean up the area.
STOCKPILING
If one of the contractors elects to produce aggregates prior to placement, the aggregates shall be handled and stockpiled in accordance with the requirements shown below.
Stockpile sites shall be at locations or approved by the CO.
All materials shall be transported and handled to preserve their quality and fitness for the work.
Aggregates shall be stockpiled, loaded, and transported in a manner that will preserve specified gradation and avoid contamination. Stockpiles of aggregate having different gradations shall not be intermingled.
END OF SECTION 02217
02217
TENT PADS
SECTION 02218
SINGLE/DOUBLE CAMPGROUND UNITS
PART 1 - GENERAL
3.
3. SUMMARY
A. This work shall consist of construction of single/double campground units. It includes furnishing the treated lumber, rebar, and surfacing material; clearing; excavation; installation of site furnishing, and constructing the pads in accordance with these specifications and details as SHOWN IN THE DRAWINGS.
B. The Government shall stake exact location of single/double campground units.
3.1 QUANTITIES OF SINGLE/DOUBLE HOST CAMPGROUND UNITS
A. Contractor shall install the following numbers of campground units to a total of 11 units:
SPEC WRITER: ADJUST QUANTITIES ABOVE AND BELOW TO SUIT PROJECT.
1. Single Campground Units: 10 units.
2. Double Campground Units: 1 unit.
3.2 JOB CONDITIONS
A. Traffic:
1. Conduct site clearing operations to ensure minimum interference with roads and other adjacent occupied or used facilities.
2. Do not close or obstruct streets, walks or other occupied or used facilities without permission from authorities having jurisdiction.
B. Protection of Existing Improvements:
1. Provide protection necessary to prevent damage to existing improvements indicated to remain in place.
C. Protection of Existing Trees and Vegetation:
1. Protect existing trees and other vegetation indicated to remain in place, against unnecessary cutting, breaking or skinning of roots, skinning and bruising of bark, smothering of trees by stockpiling construction materials or excavated materials within drip line, excess foot or vehicular traffic, or parking of vehicles within drip line.
2. Provide temporary guards to protect trees and vegetation to be left standing.
3. Where any trees are damaged, or where limbs are required to be trimmed or removed because of operations under this contract, or because of interference with new construction, any cutting or removal of limbs or branches shall be done only with prior approval of the Contracting Officer (CO).
4. Solvents, oils, and other material, which may be harmful to plant life, shall be disposed of in containers and removed from the site. At the completion of the work, any contaminated soil shall be removed and replaced with topsoil.
PART 2 - PRODUCTS
4.
4.1 TREATED LUMBER
A. Treated lumber shall be rough-sawn, pre-cut and pre-drilled Douglas Fir No. 2 Grade or Hem Fir No. 2 Grade, as grade by WWPA.
1. Size:
a. Border Edge - 6" x 6".
4.2 REINFORCING BAR (RE-BARS)
A. ASTM A 615, grade 40 unless other grade indicated on the drawings.
B. Size:
1. AS SHOWN ON DRAWINGS.
4.3 SURFACE MATERIAL
A. Source:
1. Materials shall be obtained from a commercial source. The contractor shall submit test results for aggregate gradation and a Certificate of Compliance that states gradation meets contract requirements.
2. Sampling and testing of the material before incorporation into the work shall be in accordance with AASHTO requirements and shall occur as follows:
a. For commercially produced aggregates: at the producer's plant or stockpile.
b. These test results shall not preclude later sampling and testing for final acceptance after final processing of the material.
c. Crushing, screening, and mixing plants shall be equipped with sampling devices.
d. The contractor shall take additional samples as required to validate the certification.
4.4 SITE AMMENATIES
A. General: Contractor shall provide and install fire ring and picnic tables for each single/double campground unit as SHOWN ON DRAWINGS.
B. Fire Ring: Fire ring grill will be installed at each new single and double campground unit. Type is specified in drawings.
C. Picnic Tables:
1. Picnic tables will be installed at each single and double campground unit.
2. Double campground unit to receive two (2) picnic tables.
3. Type is specified in drawings.
SPEC WRITER: DELETE ARTICLE BELOW IF NOT SUITED FOR PROJECT.
PART 3 - EXECUTION
5.
5.1 SITE CLEANING
A. General:
1. Remove trees, shrubs, grass and other vegetation, improvements, or obstructions interfering with installation of new construction.
2. Remove such items elsewhere on site or premises as specifically indicated.
3. Removal includes digging out stumps and roots.
4. Carefully and cleanly cut roots and branches of trees indicated to be left standing, where such roots and branches obstruct new construction.
5. Clearing shall be kept to a minimum within the specified working limits and care exercised to not damage the root system of adjacent trees or shrubbery.
B. Topsoil:
1. Topsoil is defined as friable clay loam surface soil found in a depth of not less than 4". Satisfactory topsoil is reasonably free of subsoil, clay lumps, stones, and other objects over 2" in diameter, and without weeds, roots, and other objectionable material.
2. Where trees are indicated to be left standing, stop topsoil stripping a sufficient distance to prevent damage to main root system.
C. Clearing and Grubbing:
1. Clear site of trees, shrubs and other vegetation, except for those indicated to be left standing.
2. Completely remove stumps, roots, and other debris protruding through ground surface.
3. Use only hand methods for grubbing inside drip line of trees indicated to be left standing.
4. Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated.
a. Place fill material in horizontal layers not exceeding 6" loose depth, and thoroughly compact to a density equal to adjacent original ground.
D. Removal of Improvements:
1. Remove existing above-grade and below-grade improvements necessary to permit construction, and other work as indicated.
5.2 TREATED LUMBER
A. Timber to be laid on a continuous solid soil surface.
B. Splicing shall be kept to a minimum. Splices shall overlap by 6 inches.
C. All timber length, lap joints and holes will be cut and drilled, and then ACQ (Alkaline Copper Quaternary) treated. They shall be rated for continuous ground contact.
D. All joints shall be lapped and pinned.
E. If tent pad is located directly adjacent to the campground unit, the common timber border shall be eliminated.
5.3 REINFORCING BARS (RE-BARS)
A. All re-bar pins shall be placed 3 inches minimum from edge of timbers.
B. Predrill holes for re-bar.
5.4 SURFACING MATERIAL
A. After treated lumber edge is complete, the area inside the treated lumber shall be constructed with surface material and compacted to the density equal to adjacent original ground.
B. The surfacing material shall be spread in a uniform layer, with no segregation of size, and to a loose depth that shall have the required depth when compacted.
C. Removing all debris and material not utilized shall clean up the area.
5.5 STOCKPILING
A. If one of the contractors elects to produce and aggregates prior to placement, the aggregates shall be handled and stockpiled in accordance with the requirements shown below.
B. Stockpile sites shall be at locations or approved by the CO.
1. All materials shall be transported and handled to preserve their quality and fitness for the work.
2. Aggregates shall be stockpiled, loaded, and transported in a manner that will preserve specified gradation and avoid contamination. Stockpiles of aggregate having different gradations shall not be intermingled.
5.6 SITE FURNISHINGS
A. Install site furnishings as SHOWN ON THE DRAWINGS.
5.7 PICNIC TABLE HOLDDOWNS
A. Install 2 holddowns per picnic table.
END OF SECTION 0221
02218
SINGLE/DOUBLE CAMPGROUND UNITS
SECTION 03305
CONCRETE FOR MINOR STRUCTURES
PART 1 - GENERAL
6.
7. SPEC WRITER: THIS SPECIFICATION IS INTENDED FOR MINOR STRUCTURES SUCH AS THRUST BLOCKS, ANCHOR BLOCKS, SIDE WALKS, SMALL SLABS AND WILL BE USED ONLY WITH PRIOR APPROVAL OF THE CONTRACTING OFFICER (CO).
7. sUMMARY A. This specification is intended for amenities, signs, and kiosks and will be used only with prior approval of the Contracting Officer (CO).
PART 2 - PRODUCTS
8.
8.1 PREPACKAGED CONCRETE MIX
A. Material shall be identified as conforming to ASTM C387, Normal Strength Concrete; Normal Weight Concrete.
8.2 JOB-BATCHED CONCRETE
A. Aggregates shall be clean, washed materials supplied by a firm regularly engaged in the production of concrete aggregates. Separate stockpiles shall be maintained of sand passing a 3/8-inch sieve and coarse aggregate of 3/4 inch to No. 4 nominal size.
B. Cement:
1. ASTM C150, type II or I.
C. Proportion dry ingredients by volume in the following ratio:
1. Cement: 3 parts.
2. Sand: 5 parts.
3. Coarse aggregate: 7 parts.
D. Add water to obtain a slump of 3-6 inches. Based on the ratio of dry ingredients of 3-5-7, the water will be approximately two parts.
E. The relative proportions of sand and coarse aggregate may be adjusted, upon approval of the CO, if necessary to obtain better workability.
PART 3 - EXECUTION
9.
9.1 SURFACE PREPARATION
A. Remove loose material from surface immediately before placing concrete.
9.2 MIXING OF CONCRETE
A. Thoroughly mix ingredients.
B. Use mechanical mixer if total quantity to be placed is over 8 cubic feet.
9.3 CONCRETE PLACEMENT
A. Place in layers to avoid segregation and begin placing at corners of structure.
B. Consolidate with mechanical vibrators or hand tampers.
C. Thoroughly work the external surface to bring mortar against the forms to produce a smooth finish, substantially free of air or water pockets or honeycomb.
9.4 COLD WEATHER
A. Heat or protect concrete, if necessary, to maintain a temperature of more than 35oF for at least 24 hours after placing.
9.5 CURING
A. Keep surfaces moist a minimum of 2 days. Acceptable methods include ponding, wet burlap, wet straw or hay, curing paper, plastic sheets, and membrane curing compound. The CO must approve other methods.
9.6 CONCRETE FINISHING
A. Do not remove forms for 24 hours after concrete has been placed.
B. Remove and replace areas or sections with major defects.
9.7 REPAIRS AND PROTECTIONS
A. Repair or replace broken or defective concrete.
B. Protect concrete from damage until acceptance of work.
END OF SECTION 03305
03305
CONCRETE FOR MINOR STRUCTURES
SECTION 10415
FEE STATION AND SITE RECREATION SIGNS
PART 1 - GENERAL
10.
10. SUMMARY
A. This work shall consist of furnishing all materials, labor, and equipment to construct fee stations, kiosks, and site recreation sign as SHOWN ON THE DRAWINGS.
B. Exact location of fee station and recreation signs shall be staked by the Government.
10.1 RELATED WORK SPECIFIED ELSEWHERE
A. See Division 3 “Concrete for Minor Structures”
10.2 QUALITY ASSURANCE
A. Wood Signs:
1. The wood signs shall be fabricated by a manufacturer which regularly engages in the manufacturer of wood routed signs for the United States Department of Agriculture, Forest Service.
2. The manufacturer shall be familiar with the USDA - "Forest Service Sign Installation Guide", dated March 2010 and the Manual for Uniform Traffic Control Devices (MUTCD).
3. The wood signs shall be fabricated by one manufacturer throughout.
10.3 SUBMITTALS
A. Shop Drawings:
1. Submit shop drawings for fabrication and erection of fee station and site recreation sign. Include plans, elevation and large-scale accessory items.
2. Furnish location template drawings for items supported or anchored to permanent construction.
PART 2 – PRODUCTS
10.4 GENERAL
A. Fee Station: Wood Product Signs: Virginia Roof kit (10'), wood = douglas fir (oak brown stain), metal roof (color = burnished slate), 2x 6''x6''x 12' posts (rough sawn douglas fir, oak brown stain), 2x bulletin boards- watershed (48''x48''), bulletin board labels (top = Fees/Information, bottom = Angel Creek Campground)- or approved equal.
B. Forest/Visitor Information Kiosk: Wood Product Signs: Virginia Roof kit (10'), wood = douglas fir (oak brown stain), metal roof (color = burnished slate), 2x 6''x6''x 12' posts (rough sawn douglas fir, oak brown stain), 2x bulletin boards- watershed (48''x48''), bulletin board labels (top = Information, bottom = Uncompahgre National Forest)- or approved equal
10.5 CONCRETE
A. See Division 3 Section - "Concrete for Minor Structures".
10.6 PAINT SCHEDULE
A. Shop Primer for Ferrous Metal:
1. Manufacturer's or Fabricator's standard, fast-curing, lead-free, "universal" primer; selected for good resistance to normal atmospheric corrosion, for compatibility with finish paint systems indicated and for compatibility to provide a sound foundation for field-applied topcoats despite prolonged exposure.
2. Painting Schedule: As SHOWN ON THE DRAWINGS.
B. Stained Wood:
1. Exposed Wood.
a. Per manufacturer’s recommendations.
PART 3 – EXECUTION
11.
11.1 INSTALLATION
A. General:
1. Fee station and site recreation sign location will be staked on the grounds by the CO, prior to commencement of work.
2. Forming shall not be necessary if the walls of the hole are firm and shall receive the concrete without sloughing and provided the excavation shall be either round or square.
3. Grind exposed joints smooth and touch-up shop paint coat.
11.2 PAINTING AND CLEANING
A. Touch-up Painting:
1. Cleaning and touch-up painting of field welds, bolted connections and abraded areas of the shop paint on miscellaneous metal.
11.3 LEXAN SHEETING
A. Install according to manufacturer's recommendations.
END OF SECTION 10415
10415
FEE STATION AND SITE RECREATION SIGNS
SECTION 10416
SITE ENTRANCE SIGN
PART 1 - GENERAL
12.
12. SUMMARY
A. This work includes furnishing materials, labor and equipment necessary to construct site entrance in accordance with these specifications and as SHOWN ON THE DRAWINGS.
B. Contractor to remove existing site entrance sign and replace with new site entrance sign.
C. Installation includes the sign, posts, and all necessary hardware.
12.1 RELATED WORK SPECIFIED ELSEWHERE
A. Fee Station and Site Recreation Signs - Section 10415.
12.2 QUALITY ASSURANCE
A. Sign Manufacturer:
1. The wood sign shall be fabricated by a manufacturer which regularly engages in the manufacture of wood sign for the United States Department of Agriculture, Forest Service.
The manufacturer shall be familiar with the USDA - "Forest Service Sign Installation Guide", dated March 2010 and the Manual for Uniform Traffic Control Devices (MUTCD).
2. The wood signs shall be fabricated by one manufacturer throughout.
PART 2 – PRODUCTS
13.
13.1 CUSTOM SIGNS
A. Types of Signs:
1. Recreation Site Identification Sign (No. RS-2). From ‘‘Wood Product Signs” OR APPROVED EQUAL.
a. Size: 63" x 40".
b. Material: Aluminum.
FASTENERS
B. Provide bolts, nuts, lag bolts, machine screws, toggle bolts, masonry anchorage devices, lock washers as required for application indicated and complying with applicable Federal standards.
C. Hot-dip galvanized fasteners for exterior applications to comply with ASTM A 153.
D. Bolts and Nuts: Regular hexagon head type, ASTM A 307, Grade A, Cadmium coated.
E. Lag Bolts: Square head type, FS FF-B-561.
F. Machine Screws: Cadmium plated steel, FS FF-S-92.
G. Wood Screws: Flat head, brass.
H. Plain Washers: Round, carbon steel, ASTM A 307, Grade A, Cadmium coated.
I. Toggle Bolts: Tumble-wing type, FS FF-B-588, type, class and style as required.
J. Lock Washers: Helical spring type carbon steel, FS-W-84.
K. Nails:
1. Nails shall be rust resistant, hot-dipped, galvanized or aluminum.
2. Staples shall not be allowed.
L.
13.2 WOOD MEMBERS
A. Exposed framing lumber:
1. Definition: Exposed framing refers to dimension lumber which is not concealed by other work and is indicated to receive a stained or natural finish.
2. Grading:
a. Hand select material at factory from lumber of species and grade indicated below for compliance with "Appearance" grade requirements of ALSC National Grading Rule.
1) Redwood, clear all heart grade per RIS rules.
2) Cedar, "A" grade, saw texture, per western red cedar rules.
B. Minimum size of wood posts shall be 6’’x6’’.
PART 3 – EXECUTION
14.
14.1 GENERAL
A. The site entrance shall be installed in the location as SHOWN ON THE DRAWINGS on contractor furnished timber post base per USDA “Sign Installation Guide” dated March 2010.
END OF SECTION 10416-24
10416
SITE ENTRANCE SIGN
SECTION 13129
INSTALLATION OF PRECAST CONCRETE TOILET AND UTILITY BUILDINGS
13129
INSTALLATION OF PRECAST CONCRETE TOILET AND UTILITY BUILDINGS
PART 1 - GENERAL
15. List Level 1
15. description A. The work of this section consists of furnishing, delivering, and installing precast concrete toilet and utility buildings including clearing and grubbing, excavating, backfilling, site grading and cleanup.
B. SEE DRAWINGS for toilet details.
15.1 QUALITY ASSURANCE
A. Ensure that water on the floor slab drains towards the door.
15.2 SUBMITTALS
A. Certification from supplier that bedding material meets the gradation specified.
B. Building installation manual.
15.3 DELIVERY AND HANDLING
A. Contractor shall coordinate with the building manufacturer for the delivery and placement of the precast concrete building.
B. SEE DRAWINGS for detailed directions and a map for each delivery site.
C. Building shall be installed according to the manufacturer’s installation instructions.
PART 2 – PRODUCTS
16.
16.1 SOIL CLASSIFICATION
A. Excavation shall be unclassified as to materials and shall include all materials that are encountered in the required excavation.
16.2 BACKFILL MATERIAL
A. Backfill shall be sandy clay, sand, gravel, soft shale, or other suitable material free from brush, organic material, dirt clods, stone or boulders larger than six inches in greatest dimension or frozen material.
Backfill within six inches of concrete shall be free of deleterious material and shall contain no stone larger than two inches in greatest dimension and no stone two inches or larger shall lie closer than six inches to the ground surface.
B. Backfill material shall be excavated material whenever it meets specification requirements. Whenever excavated material contains less than 10 percent of oversized material, the Contractor shall remove boulders larger then 6” from the excavated material at no additional compensation and utilize it as backfill material. Whenever material meeting the specification requirements is not available from excavation, the Contractor shall import material from a designated or approved source.
16.3 SELECT BORROW
A. When excavated soil does not meet the requirements for backfill, Contractor shall backfill with select borrow obtained from a source identified by the Ordering Unit Contracting Officer.
16.4 BEDDING MATERIAL
A. Bedding material shall be 1.5 inch minus crushed aggregate road base from a private or commercial source. Aggregate shall be used as a leveling course beneath the concrete vault or slab.
16.5 ACCESSIBLE PATH SURFACING
A. The Government will provide granular surface material for placement by the Contractor within 50 feet of the building.
16.6 SEALANT
A. Per manufacturer’s recommendations.
PART 3 - EXECUTION
17.
17.1 LOCATION
A. The Government shall approve location prior to the Contractor beginning work.
17.2 CLEARING AND GRUBBING
A. Clearing and grubbing shall be confined to designated areas and only marked trees may be removed. Maximum clearing and grubbing shall be confined to an area 20 feet beyond the back and sides of the building and 30 feet in front of the building. Construction work shall disturb a minimum of the existing terrain and plant life adjacent to the cleared and grubbed area. The Contractor shall exercise care to not damage unmarked trees and shrubbery. Skinned or barked trees shall be repaired with an application of black asphalt emulsion especially formulated for such use.
B. Trees shall be felled within the clearing limits, usually towards the center, so as to prevent damage to the trees that are to be left standing. When necessary to prevent damage to structures, adjacent trees, property, or to minimize danger to traffic, trees shall be cut in sections from the top downward.
C. All trimming of trees shall be done in accordance with approved horticultural practices. Branches shall be saw cut flush with the trunk. Stumps within the clearing limit but out of the excavation area shall be cut not more than 6 inches above the ground.
D. Trees and limbs larger than 4 inches in diameter shall be cut in 8-foot lengths and stockpiled as directed by the Ordering Unit Contracting Officer.
17.3 TOPSOIL
A. Topsoil shall be removed from the area to be excavated and from the area where excavated material shall be piled prior to excavating. Topsoil shall be kept separate from excavated material. Topsoil shall be reused on those areas from which it came after backfilling is complete.
17.4 SAFETY, SHORING, AND PROTECTION
A. The Contractor shall meet OSHA safety rules and regulations. Walls of excavations 4’ or more in depth shall be supported by bracing, shoring, or other methods, unless the walls are sloped to a safe angle from the bottom. If shored, the excavation shall be of proper dimensions to accommodate shoring and bracing, as required to keep walls from collapsing and to allow for proper installation of the work. All existing improvements shall be fully protected from damage. All supports shall be removed after construction is completed and shall be withdrawn in a manner that will prevent the collapse of the sides of the excavation. All openings in the ground, caused by the removal of supports, shall be filled with suitable material and properly compacted.
B. All excavations left open overnight shall be fenced with wire or plastic mesh secured to steel posts all around the excavation.
1. The bottom of the fence shall follow the contour of the ground
2. Maximum spacing of the steel posts shall be 10 feet.
3. Minimum height of the fence shall be 36 inches.
17.5 REMOVAL OF WATER
A. The Contractor shall provide and maintain, at all times during construction, ample means and devices with which to promptly remove and properly dispose of all water entering the excavations or other parts of the work without damage to adjacent property. All excavations shall be kept free from standing water. The Contractor at his own expense shall repair any damage caused by water in the excavation.
17.6 EXCAVATION, BACKFILL, AND SITE GRADING
A. Coordination with the Building Manufacturer
1. Contractor shall coordinate with the manufacturer of the precast concrete building to accommodate installation at the time of delivery. The Contractor shall be responsible to obtain installation instructions from the manufacturer and perform the excavation, backfill, and site grading in accordance with those instructions. The excavation shall be over excavated two feet (horizontal measurement) on each side of the vault or slab to allow for compaction and minor adjustments in orientation. The Contractor must have excavation complete prior to delivery of the precast concrete building. The Contractor will be provided 1-week minimum lead-time to have the excavation work performed. Also, the Contractor must be on site at the time of delivery to perform the backfill operation as soon as the precast concrete building is in place.
B. Excavation
1. Stockpile excavated material away from the excavation to facilitate crane and delivery truck access.
2. Compact the natural ground at the bottom of the vault excavation with a minimum of three passes with an approved whacker-type mechanical tamper.
C. Bedding
1. The Contractor shall place a leveling course prior to placement of the vault or building. Compact leveling course with one pass of an approved whacker-type mechanical tamper. Grade leveling course so there will be no high spots in the middle. Compact with a second pass with a tamper. Slope the top of the bedding one percent from back to front of building.
a. Minimum compacted leveling course for vault shall be 4 inches.
b. Minimum compacted leveling course for building slab shall be 6 inches.
D. Backfill
1. Backfill shall be permitted only after the work to be covered has been approved by the Contracting Officer. Backfill shall be placed in 8” thick (loose measurement) lifts and compacted with three complete passes of an approved vibratory compactor.
17.7 START-UP PROCEDURES
a. Per manufacturer’s recommendations.
17.8 FINISH GRADING
A. All surfaces and slopes shall be shaped to blend with the original ground line, mounded over or smoothed off, and raked, and left in a uniform and neat condition. Stockpiled topsoil shall be smoothly distributed over disturbed areas and hand raked to blend with ground line. Final grade shall be flush with top of front slab to provide accessibility. Surface drainage shall be diverted so that it will not enter into the area.
17.9 CLEANUP
A. After backfilling and grading has been completed, the disturbed area shall be finished to present as near a natural appearance as possible and cleaned up by removing all debris and materials not utilized.
B. Clean building walls, floors, and roof using soapy water.
17.10 DISPOSAL
A. All construction refuse shall be disposed of off-site at a State-approved disposal site.
END OF SECTION 13129