12817319R0012_REVISED_Decommission_Chevelon_WorkCenter.pdf

PDF 1 MB Posted

Attached to
DECOMMISSION CHEVELON WORK CENTER
Solicitation number
12817319R0012
Issued by

About this file

REVISED RFP DECOMMISSION CHEVELON

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

52.215-1 INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2017)

(a) Definitions. As used in this provision --

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.”

“In writing,” “writing,” or “written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals.

(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages

(i) addressed to the office specified in the solicitation, and

(ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show --

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation;

and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any modification, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)

(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and --

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall --

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed -- in whole or in part -- for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of -- or in connection with -- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government’s interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of Provision)

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA

FAR (48 CFR) 53.236-1I

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

B. SOLICITATION NO.

12817319R0012

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

5/07/2019

PAGE OF PAGES

1 59

IMPORTANT — The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

955670

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

USDA FOREST SERVICE APACHE-SITGREAVES NATIONAL FORESTS

SUPERVISOR’S OFFICE – ACQUISITION MANAGEMENT

30 S. CHIRICAHUA DRIVE PO BOX 640

SPRINGERVILLE, AZ 85938

SAME AS BOX NO. 7

9. FOR INFORMATION

CALL:

B. NAME

WARREN ABBOTT

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(928) 333-6344

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The USDA Forest Service, Apache—Sitgreaves National Forests, Springerville, Arizona, has a requirement to decommission buildings and other infrastructure at Chevelon Work Center, on Black Mesa Ranger District, Coconino County.

MAGNITUDE OF PROJECT: Between $500,000 and $1,000,000. This solicitation is a 100 percent Total Small Business Set-Aside.

NAICS: 238910 $15 Million is size standard for small business. PSC: Z2QA

Davis-Bacon Wages apply. Payment and Performance bonds will be required upon award from awarded contractor only. No bid bonds are required.

Offerors are required to have active vendor record for the DUNS number above in the System for Award Management (SAM) https://www.sam.gov

11. The Contractor shall begin performance within 10 calendar days and complete it within time specified calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1600 MST (hour) local time JUNE 4, 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation — give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

B. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

B. SUBMIT INVOICES TO ADDRESS SHOWN

IN

ITEM

B. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304I( ) 41 U.S.C. 253I( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

SAME AS 7 Electronic Funds Transfer via Invoice Processing Platform at www.ipp.gov

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO

SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print) Warren Abbott

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

CONSTRUCTION RFP REVISED – AMENDMENT 1 SOL NO: 12817319R0012

UNIT: APACHE-SITGFREAVES N.F

PROJ NAME: DECOMMISSION BUILDINGS CHEVELON WORK CENTER

CHECKLIST OF MINIMUM REQUIREMENTS

AND CERTIFICATION OF OFFER

_____Provide your business email to facilitate communications____________________________

_____DUNS Number ___________________________

_____ Respond with the COMPLETE RETURN PACKAGE (See Section M, Evaluation Factors on how to respond).

Failure to provide the required information for Evaluation factors may result in your offer being removed from competitive range.

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

B1 – SCHEDULE OF BASE ITEMS

BASE

ITEM # DESCRIPTION OF PROJECT ITEMS UNIT OF

MEASURE

EST.

QTY UNIT PRICE* EXTENDED

AMOUNT*

B1.1 Mobilization and bonding, one-time fee LS 1 $_________ $____________

B2.1 Remove ten (11) buildings, excluding foundations LS 1 $_________ $____________

B3.1 Remove building foundations SF 16,849 $_________ $____________

B4.1 Remove communications tower and foundation LS 1 $_________ $____________

B5.1 Remove above-ground piping, intake structures, fencing at sewer lagoons LS 1 $_________ $____________

B6.1 Remove other miscellaneous infrastructure LS 1 $_________ $____________

TOTAL OF ALL BASE ITEMS

*PRICE INCLUDES ALL FEDERAL, STATE, LOCAL TAXES, LICENSES, PERMITS, FEES, ETC.

O1 – SCHEDULE OF OPTION ITEMS

OPTION

ITEM # DESCRIPTION OF PROJECT ITEMS UNIT OF

MEASURE

EST.

QTY UNIT PRICE* EXTENDED

AMOUNT*

O2.1 Remove building G-10 including stem wall foundation LS 1 $_________ $____________

O3.1 Remove miscellaneous concrete pads and footings SF 1000 $_________

O4.1 Remove chain link fence and posts, including footings LS 1 $_________ $____________

O5.1 Remove above-ground fuel storage tanks LS 1 $_________ $____________

*PRICE INCLUDES ALL FEDERAL, STATE, LOCAL TAXES, LICENSES, PERMITS, FEES, ETC.

CERTIFICATION OF OFFER AND SUBMISSIONS FOR THIS REQUEST FOR PROPOSALS:

VENDOR COMPANY NAME:____________________________________ DUNS#____________________

AUTHORIZED TO SIGN (NAME & TITLE):_____________________________________________________

SIGNATURE:__________________________________________ DATE:______________________

BUSINESS EMAIL:___________________________________________

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C1 – GENERAL DESCRIPTION OF WORK

The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to decommission buildings and other infrastructure at the Chevelon Work Center on the Apache-Sitgreaves National Forests. The project is located on the Black Mesa Ranger District.

All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions of this RFP shall be made without the prior approval of the Contracting Officer in writing.

The Government intends to award a contract based on Best Value – Tradeoffs. The offeror that demonstrates that they have technical skill required and lowest price. In order to remain in the competitive range, Offerors (Contractors) shall submit the Return Package with the requirements in Section M, Evaluation Factors.

C.2 – LOCATION OF PROJECT

Chevelon Work Center: LAT 34.539689 degrees, LONG -110.914039

From Show Low:

From the intersection of AZ-260 and US-60 in Show Low, AZ, head east along AZ-260 for 58.1 miles. Turn right onto NFSR 300 and continue 9.1 miles. Merge right onto NFSR 34 and continue 12.6 miles. Chevelon Work Center is located on the west side of the road. This access is closed seasonally during the winter months.

From Winslow:

From the intersection of AZ-87 and Central Street (south of the railroad tracks), head southwest along AZ-87 one mile. Turn left at AZ-99 and continue 39.8 miles. AZ-99 turns into NFSR 34. Chevelon Work Center is located on the west side of the road.

C.3 – SPECIFIC SCOPE OF WORK

When the terms “remove,” “dispose,” and or “decommission” are used herein, the Contractor shall remove all debris created by demolition activities offsite and properly disposed in accordance with local, state (Arizona Department of Environmental Quality (ADEQ)), and federal laws and regulations to include National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements when environmental contaminants and asbestos containing materials (ACM) are present.

Where a void is left in the ground as a result of removing infrastructure (i.e.; valve boxes, concrete catch basins, manholes, etc.), contractor shall fill void with surrounding earthen material.

Buildings do not have live electric or water lines running to them.

The Government assumes no liability of any items that are removed from the site as a result of this project.

Quantities and measurements are approximate. Offerors shall be responsible for verifying site and facility dimensions and conditions prior to submitting their offer.

Overnight camping is permitted at the location. Contact the Black Mesa Ranger District at (928) 535-7300 for further information. The site offers non-potable water, but no electricity. Contractor must bring own sanitary facilities.

For concrete removal and specific to Base Line Item B3.1 and Option Line Item O3.1, the Contractor may elect to crush the concrete onsite to the following gradation:

Screened Aggregate Target Value for Gradation

Test Methods AASHTO T-11 & T-27

Sieve Size Percent by Mass Passing Designated Sieve

4" 100 3" 90 - 95 1" 56 - 68

1/2" 43 - 53 #4 30 - 40

#40 12 - 20 #200 08 - 12

If the Contractor chooses to crush concrete onsite, the concrete must be free of foreign debris (such as ACM, rebar, etc.) before it is crushed. The Government will designate a stockpile location onsite (i.e. at the Chevelon Work Center, Heliport Area, or Lagoons).

C3.1 Base line item B1.1 Mobilization (one-way) and bonding.

C3.2 Base line item B2.1

Remove and dispose of buildings as outlined in Exhibit 4, excluding building slab-on-grade foundations and Bldg. G-

10. Total approximate square footage is 25,395, and includes overhangs, porches, etc.

The following table shows the basic details of the buildings.

Bldg.

ID Bldg. Name Bldg.

Category Approximate

Year Constructed Approximate

Square Footage G-11 CHEV RESIDENCE Residence 1972 2040 G-12 CHEV RANGER RESIDENCE Residence 1972 2040 G-13 CHEV CREW QUARTERS B Bunkhouse 1960 2560 G-14 CHEV CREW QUARTERS A Bunkhouse 1960 2600 G-16 CHEV VEHICLE STORAGE Garage 1972 7220 G-19 CHEV FLAMMABLE STORAGE Storage 1972 1015 G-20 CHEV OFFICE/SHOP/STORAGE Other 1972 7110 G-23 CHEV HELIPORT BLDG Storage 1970 70 G-24 CHEV GENERATOR SHED Storage 1983 550 G-35 CHEV SOLAR SHED Storage 1985 90 G-36 CHEV WASHRACK SHED Storage 1986 100

Removal of the buildings consists of all the contents within those buildings, excluding:

a) Refrigerators and stoves in G-20

b) Lawn mowers, edger, and pressure washers in G-16

c) Generator in G-24

d) Range poly tanks in G-19

Move the excluded items to a Government-designated centrally located place onsite (in the courtyard between G- 20 and G-16).

Removal of the buildings also include:

a) Connected add-ons such as porches, sheds, etc.

b) Stem wall foundations on G-11 and G-12 (all other buildings are assumed to have slab on grade foundations and are part of B3.1)

c) Electrical infrastructure such as breaker boxes, meter assemblies, etc.

d) Exposed utilities including crawl space; for sewer, water, and all other underground utilities, remove and cut to at least 12 inches below existing grade

e) Remove all flooring, including carpet and tiling, down to the concrete slab

Refer to Exhibit 5, for environmental impact of the facilities, which may include issues with rodent droppings, asbestos-containing materials (ACM), and lead-based paint. The summary of findings for ACM and lead-based paint are included in the exhibit. A full copy of the report shall be provided to the awarded Contractor. Contractor shall include any required remediation costs in pricing this line item. Building G-35 tested negative for ACM, and testing for lead was under the EPA minimum threshold.

Awarded contractor shall provide one (1) picture of each building during demolition and one (1) picture of results after demolition (debris pile), at a minimum.

C3.3 Base line item B3.1

Remove and properly dispose of building foundations, approximately 16,849 square feet. They range from 18 to 36 inches thick on the perimeter stem walls to 6 to 8 inches thick on the slabs on grade. Unit of measure is per 1000 square feet (SF):

ID Bldg. Name

Approximate Foundation

Square Footage

G-13 CHEV CREW QUARTERS B 2024

G-14 CHEV CREW QUARTERS A 1848

G-16 CHEV VEHICLE STORAGE 5688

G-19 CHEV FLAMMABLE STORAGE 624

G-20 CHEV OFFICE/SHOP/STORAGE 5925

G-23 CHEV HELIPORT BLDG 70

G-24 CHEV GENERATOR SHED 480

G-35 CHEV SOLAR SHED 90

G-36 CHEV WASHRACK SHED 100

Total 16,849

C3.4 Base line item B4.1

Remove and properly dispose of communications tower and foundation. Tower is approximately 80-foot tall and minimum 80 gauge galvanized steel, with a 12-foot by 12-foot foundation. Depth of foundation is minimum 12 inches. See Exhibit 6 for pictures.

C3.5 Base line item B5.1

Remove and properly dispose all above ground piping and aeration system at the sewer lagoons, as shown on Exhibit 7, to include the concrete catch basin and inlet structures, PVC pipes, approximately 1,340 linear feet of elk enclosure fence including posts, and small concrete pad where the aeration pump sits. Remove adjacent yard waste to include the chicken coup, concrete manhole bases, tires, and wood debris.

C3.6 Base line item B6.1

Remove and properly dispose of other miscellaneous infrastructure as shown in Exhibit 8 and the table below. For valve boxes, culvert or PVC, pipe must be pulled. For concrete or wood valve boxes, remove the exterior walls and fill with earthen fill. For sewer manholes, remove covers and collapse the top of concrete walls below grade, and cover with earthen fill. For exposed pipes, twist and remove such that remaining pipe is minimum 12 inches below existing grade. Pull completely exposed pipe assembly if possible.

Item Description UOM Quantity 4-foot wall at wash bldg LF 70 Wood shed, detached 12'x12' EA 1 Rock wall with stairs LF 120 Steel bollards w/ concrete EA 10 Light pole EA 1 Light assembly on tree EA 1 Breaker box assembly EA 1 Wood bollards EA 40 Flagpole EA 1 Communications pole EA 1 Meter post, wood EA 1 Gas meter EA 2 Other posts/bollards EA 25 Fence fabric and pole piles, loose EA 3 Picnic table, wood EA 1 Trash can EA 1 Valve box, concrete, 3'x3' EA 8 Railroad ties, wood EA 60 Fence posts, w/ footings EA 61 Exposed pipes, above-ground EA 20 Valve box, wood, 4'x4' EA 8 Posts, clothline, inc. wiring EA 8 Meter pedestals, metal EA 12 Telephone pedestal EA 30 Sewer manhole EA 10 Hydrant EA 8 Valve box, culvert or PVC EA 25 Stairs, concrete, 5'x5' EA 1 Irrigation control box EA 10 Transformer, behind quarters EA 1 Windmill base and concrete EA 1 Fire pit EA 1 Bench, wood EA 1 Mailbox EA 2 Fence box structure, hose-drying SF 1000 Basketball post, steel EA 1 Merry-go-round EA 1

C3.7 Delete the previous work of this paragraph

Remove Exhibit 9 from consideration.

C3.8 Option line item O2.1

Remove and dispose of Bldg. G-10, including stem-wall foundation.

ID Bldg. Name Bldg.

Category Approximate

Year Constructed Approximate

Square Footage G-10 CHEV OLD RESIDENCE Residence 1950 1040

C3.9 Option line item O3.1

Remove and properly dispose of miscellaneous concrete pad, footings, sidewalks and other concrete, up to 20,000 square feet. Concrete ranges from 4 to 12 inches thick. See Exhibit 10 for concrete pictures under this bid line item.

Unit of measure is per 1000 square feet (SF).

C3.10 Option line item O4.1

Remove and properly dispose of chain link fence, including post and footings, approximately 1,350 linear feet and 5-foot high. Only fencing to remain is the new chain link fence installed by APS around their propane tanks and other electrical infrastructure.

C3.11 Option line item O5.1

Remove and properly dispose of above-ground fuel storage tanks, four total, as shown in Exhibit 11. Include required permitting, inspections, etc. to safely and legally transport and dispose offsite.

The fuel storage tanks (that are painted white) are concrete encased. The first two tanks on the west have 1-2 inches of residual fuel. The third tank (the furthest east of the three) measured approximately 12 inches of residual fuel.

In addition to properly disposing of the tanks, any residual fuel must be properly disposed in accordance with all Federal, State, and Local regulations.

Bollards and concrete pads captured on other bid line items.

SECTION D – PACKAGING AND MARKING

D1—GENERAL INFORMATION:

See Section J for Exhibits that are incorporated as part of the statement of work:

Exhibit 1 – U.S. Department of Labor, Wage Determination Exhibit 2 – Bio-preferred Requirements Exhibit 3 – Site Maps Exhibit 4 – Pictures, Buildings Exhibit 5 – Building Environmental Status Exhibit 6 – Pictures, Communication Tower Exhibit 7– Pictures, Sewer Lagoons Exhibit 8 – Pictures, Miscellaneous Items Exhibit 9 – Removed from consideration Exhibit 10 – Pictures, Concrete Exhibit 11 – Pictures, Fuel Tanks

Technical Capability shall be submitted in the form of a statement or document that demonstrates the contractor’s capability to perform the work to meet or exceed the requirements of this solicitation. In order to meet the Technical Capability Requirements, offers shall address the following factors:

Factor a - tools, equipment, training, and general business practices should be developed in the statement or document to satisfy an evaluation panel that you the contractor has a level of technical capability that meets or exceeds the requirements to perform this work:

a) List of specific equipment and tools to demo the facilities and infrastructure at Chevelon Work Center

b) Certificates of personnel with asbestos remediation that meets ADEQ requirements for mandatory classes, training, and certifications.

Factors b - Provide specific information to gain a better understanding of the requirements to demolish and haul offsite building and miscellaneous infrastructure, that documents and addresses your firm’s experience and capability. You may provide your own drawings, illustrations, documents, or photos to support your capability to perform the work. Specifically address the following:

a) General building demolition experience, which can include residential, commercial, or government facilities

b) Removal of construction/building debris containing asbestos materials such as drywall, tile mastic, and window putty

Technically Capability represents up to 40 percent as an evaluation factor.

Exhibit 3 – Site Maps (see electronic attachment, 3 pages)

Exhibit 4 – Pictures, Buildings (see electronic attachment, 22 pages)

Exhibit 5 – Building Environmental Status (see electronic attachment, 1 page)

Exhibit 6 – Pictures, Communication Tower (see electronic attachment, 3 pages)

Exhibit 7 – Pictures, Sewer Lagoons (see electronic attachment, 2 pages)

Exhibit 8 – Pictures, Miscellaneous Items (see electronic attachment, 9 pages)

Exhibit 9 – REMOVED FROM CONSIDERATION

Exhibit 10 – Pictures, Concrete (see electronic attachment, 1 page)

Exhibit 11 – Pictures, Fuel Tanks (see electronic attachment, 1 page)

SECTION E - INSPECTION AND ACCEPTANCE

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not—

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may—

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of clause)

52.246-13 INSPECTION—DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)

(a) Unless otherwise designated by the specifications, all workmanship performed under the contract is subject to

Government inspection at all times and places where dismantling or demolition work is being performed. The Contractor shall furnish promptly, and at no increase in contract price, all reasonable facilities, labor, and materials necessary for safe and convenient inspection by the Government. The Government shall perform inspections in a manner that will not unduly delay the work.

(b) The Contractor is responsible for damage to property caused by defective workmanship. The Contractor shall promptly segregate and remove from the premises any unsatisfactory facilities, materials, and equipment used in contract performance, and promptly replaces them with satisfactory items. If the Contractor fails to proceed at once in a workmanlike manner with performance of the work or with the correction of defective workmanship, the Government may—

(1) By contract or otherwise, replace the facilities, materials, and equipment or correct the workmanship and charge the cost to the Contractor; and

(2) Terminate for default the Contractor’s right to proceed. The Contractor and any surety shall be liable, to the extent specified in the contract for any damage or cost of repair or replacement. (End of clause)

52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of—

(1) The Contractor’s failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall—

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting

Officer; and

(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturers, or supplier’s warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

(End of clause)

SECTION F - DELIVERIES OR PERFORMANCE

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives notice-to-proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days from issuance of notice-to-proceed. The time stated for completion shall include final cleanup of the premises.

AGAR 452.236-75 MAXIMUM WORK WEEK – CONSTRUCTION SCHEDULE (NOV 1996)

Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work

The maximum workweek shall be Monday through Sunday, Daylight to Dusk. Any change in the work schedule shall be approved in writing by the Contracting Officer prior to commencement.

SECTION G - Contract Administration Data

Government Furnished Items:

A full copy of the asbestos and lead-based paint test report shall be provided to the awarded Contractor

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H1 APACHE-SITGREAVES NATIONAL FORESTS: INDUSTRIAL FIRE PLAN

The following requirements are a part of this solicitation and any resultant contract or permit, and shall be provided at the Contractor’s expense:

1. Wildfire Prevention – During periods of contract/permit performance, fire prevention and immediate suppression actions shall be performed by the Contractor.

2. Execution of Industrial Fire Plan

a. Forest Service personnel involved will, in all cases, coordinate through the Contracting Officer’s Representative (COR) or

Permit Administrator, except in cases of emergency, Red Flag Days, or Forest closure.

b. The Contractor shall designate a Fire Guard, fluent in English, who shall be responsible for executing and carrying out the

Industrial Fire Plan requirements. The name of this representative will be provided to the COR at the pre-work meeting.

c. The Contractor shall include the Industrial Fire Plan requirements in all subcontracts.

d. The Contractor shall assure that all contract employees are informed of the existence and conditions of the Industrial Fire

Plan requirements.

3. Compliance Inspection

a. Inspection by the Forest Service will be made to insure compliance with the fire requirements.

b. Should any deficiencies appear during the inspection, the Contractor/Permit holder will be informed and the deficiencies shall be corrected within 24 hours. Activities with the potential to start fires shall be halted until the deficiencies are corrected and the corrections are approved by the COR.

c. The Contractor’s Fire Guard shall make daily inspections to insure that the terms of the Industrial Fire Plan requirements are met at all times, both on the job-site and in the Contractor’s camp.

4. Fire Prevention Requirements

a. Fire Toolbox - During contract performance, the Contractor shall furnish and maintain, at the Contractor’s expense, one mobile Fire Toolbox, within ¼ mile or less of the location where the Contractor is currently performing work and camping.

The fire toolbox is to be maintained with tools in good working condition, in such quantities and mix to provide at least one firefighting tool for each person in the Contractor’s workforce engaged in contract operations. This equipment is for the sole purpose of firefighting: a mix of three shovels, size 0 or larger, one axe, two fire rakes, two Pulaskis, and two 3-5 gallon hand pump garden sprayers or backpack pumps filled with water. Where appropriate, a chainsaw may be substituted for the axe; a McLeod tool or heavy duty garden rake for a fire rake, and a heavy duty garden wide hoe or other sturdy digging/scraping tool may be substituted for the Pulaski.

The fire toolbox shall be replenished with cleaned, re-sharpened, reconditioned, or new tools by the Contractor after each use.

b. Work Hours – The Contractor shall restrict operations in accordance with the following Industrial Fire Plan level unless the COR waives the requirement in writing.

Each day of operation when there is a predicted change in the Industrial Fire Plan level, the Forest Service will inform the Contractor between 3 and 6 pm MST (4 and 7 pm MDT). Notification will be made of which stage in the industrial fire precaution plan (Supplement 1) to be followed the next day within the local operating area.

No later than 9 am MST (10 am MDT) the following day, the Forest Service will inform the Contractor of any change in the fire precaution schedule. In the case of Red Flag Days, the Forest Service will inform the Contractor as soon as possible after the National Weather Service issues their high wind warning for that day, which often comes after 9 am MST.

c. Blasting – Use of fuses in blasting shall not be permitted. A Fire Guard must remain on the blasting site for a minimum of one hour after blasting operations have concluded. Required equipment shall consist of at least one 5 lb. fire extinguisher, one long-handled round-pointed shovel size 0 or larger and one 5-gallon hand pump garden sprayer or backpack pump filled with water.

Written permission must be obtained from the CO during fire precaution plan B and C days. Blasting hours are restricted under fire precaution plan C; and blasting is prohibited under fire precaution plan D and on Red Flag days.

d. Welding –Written permission must be obtained from the COR during fire precaution plan B, C, and D. Welding is prohibited on Red Flag days. Required equipment at the welding site shall consist of at least one 5 lb. fire extinguisher, one shovel, size 0 or larger and one 3-5-gallon hand pump garden sprayer or backpack pump filled with water. An area commensurate with the amount of welding to be accomplished shall be cleared to bare mineral soil before welding operations are started. The area in the immediate vicinity of the operation shall be wet down before and after operations. The area adjacent to the welding operations shall be thoroughly checked by the Fire Guard for fires for at least 1 hour after welding.

e. Slash Incineration – Operation of forced-air burners must comply with all state and federal open burning laws, regulations and policies. Forced air burners shall be operated with a minimum set back from combustibles of 100feet. This activity is prohibited on fire precaution plan C, D and Red Flag days.

f. Ash disposal – Ash from slash incineration shall be treated in such a manner as to not constitute a wildfire risk, and shall be disposed of in an approved manner designated by the COR.

g. Controlled Burning – All planned burns, including pile burns or use of air curtain burners, conducted by the

Contractor under the terms and conditions of the contract are required to have a written Burn Plan that meets the requirements of Forest Service Manual 5140 for the project. The Burn Plan must be prepared, recommended and approved by the appropriate Forest Service Officers. The Contractor will notify the CO, COR, and District Fire Management Officer prior to implementation of a burning project. The Contractor will insure all appropriate Federal, State and local laws, regulations, and policies pertinent to the Burn Plan, are adhered to. Training and qualification standards for the Contractor’s employees conducting burning operations will be required according to the applicable regulations in NWCG 310-1, which can found at the National Wildfire Coordinating Group website, www.nwcg.gov/pms/docs/docs.htm.

h. Fire Guard – To prevent, detect, and suppress wildfires, the Contractor shall provide one or more trained Fire Guards at each operating area where internal combustion engines, incineration equipment, controlled burns or camps are used. Each Fire Guard is required to read, understand, and perform the Industrial Fire Plan duties. The Fire Guards may perform other contract work in conjunction with Fire Guard duties, provided such other work does not distract from Fire Guard responsibilities. A Fire Guard(s) assigned on one operating area shall satisfy the requirements on adjacent areas if the travel time with available transportation is not in excess of twenty (20) minutes to any of the other areas.

Each Fire Guard shall be physically able, and trained to prevent, detect, and report any fire, and to immediately take suppression action with the required firefighting equipment and employees on any wildfire that starts within the contract area. The Fire Guards shall perform their duties during normal operating hours; with an added three (3) hour watch after work stops for the day when the Fire Precaution Plan is at level B or C. If the Contractor has agreed to additional terms for operation under Fire Precaution Plan D, the Fire Guard will perform all requirements specified in the Plan D Authorization Letter issued by the CO.

Each Fire Guard shall be equipped with a vehicle capable of carrying a minimum 5 lb. fire extinguisher and fire tools consisting of a cache box with one shovel, size 0 or larger, one cutting tool such as either an axe, Pulaski or chainsaw, one fire rake or heavy duty garden rake, and two 3-5-gallon hand pump garden sprayers or backpack pumps filled with water. All equipment and tools shall be maintained in serviceable and operable condition.