This project specification document outlines requirements for road repairs across three phases for the USDA Agricultural Research Service Field Research Implementation and Information Delivery Plains Area. The project includes repaving and reconstruction of entrance roads, overlay of campus roads, and repairs to Fort Reno Road. Work will involve milling, asphalt overlay and reconstruction, aggregate base installation, drainage improvements, and erosion control measures. The specifications provide construction details, applicable standards, payment terms, and general notes. Erosion control plans show temporary and permanent controls required during grading and revegetation work. Bidders should follow all local, state and federal codes in planning dust control, disposal of demolition materials, and trench safety.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
ROADWAY PLANS FOR
USDA ROADWAY REPAIRS
PHASES 1-3
EL RENO, OKLAHOMA PROJECT LOCATION
Walter P Moore and Associates, Inc.
7666 East 61st Street, Suite 251 Tulsa, Oklahoma 74133 918.806.7200
101 Park Avenue, Suite 1300 Oklahoma City, Oklahoma 73102 405.493.0500
Know what'sbelow.
Callbefore you dig.
PREPARED BY:
PORTION OF CANADIAN COUNTY, OKLAHOMA
VICINITY MAP
NOT TO SCALE
PROJECT LOCATION
R8W
TO WEATHERFORD
N L
EN
AP
AH
A
VE
N L
O M
BA
R
D L
N
N J
AV
IN
E H
IL
L
T12N
TO BETHANY
TO OKLAHOMA CITY
INDEX OF SHEETS
SHEET # SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES
3 QUANTITY TABLES
4 TYPICAL SECTIONS & DETAILS
5 PAVING PLAN (1)
6 PAVING PLAN FORT RENO RD (1)
7 PAVING PLAN FORT RENO RD (2)
8 PAVING PLAN ROAD 1 (1)
9 PAVING PLAN ROAD 1 (2)
10 EROSION CONTROL PLAN (1)
11 EROSION CONTROL PLAN (2)
12 EROSION CONTROL PLAN (3)
13 EROSION CONTROL PLAN (4)
14 EROSION CONTROL PLAN (5)
15 DRAINAGE AREA MAP
APPLICABLE STANDARDS
ODOT 2019 ROADWAY
BMPR-0
TESCA-0
RSF-0
TSD-0
SCE-0
CWA-0
SSS-2-1
ASCD-6-1
PR-4-1
PCES-5-1
SPI-5-2
PBB-1-2
FHTCP-4-1
SBI-5-2
PDT-2-1
PDT-2-2
ODOT 2009 BRIDGE
RCB-C1-3&4&5(2-20)-01E
RCB-C1-8(2-14)-01E
RCB-E1-H2-0-1-01E
RCB-E1-H2-02-01E
RCB-E1-H3-0-1-01E
RCB-E1-H3-0-2-01E
RCB-CW1-D4-0
2019 OKLAHOMA STANDARD SPECIFICATION FOR HIGHWAY CONSTRUCTION
GOVERN, APPROVED BY THE U.S. DOT, FHWA, DEC 18, 2019
PHASE 1 - ENTRANCE AND RECONSTRUCTION
OF ENTRANCE ROAD
PHASE 2 - EAST CAMPUS ROAD AND
ENTRANCE ROAD OVERLAY
PHASE 3 - FORT ROADS
7/12/2023
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
2GENERAL NOTES
DEMOLITION NOTES
1. CONTRACTOR SHALL CONFORM WITH ALL APPLICABLE CODES (LOCAL, STATE AND FEDERAL)
FOR DEMOLITION, DUST CONTROL, EROSION CONTROL AND DISPOSAL OF DEMOLITION
MATERIAL AND DEBRIS.
2.
3. EXISTING UNDERGROUND LINES HAVE BEEN SHOWN TO THE EXTENT KNOWN AND LOCATIONS
HAVE BEEN VERIFIED BY THE OWNERS OF SAID LINES. THE EXACT LOCATIONS AND
NOTIFICATIONS OF THE PROPER AGENCY IS THE RESPONSIBILITY OF THE CONTRACTOR PRIOR
TO ANY EXCAVATION.
4. SURVEY INFORMATION PROVIDED BY AERIAL DATA COLLECTION. CONTRACTOR TO FIELD
VERIFY LOCATIONS PRIOR TO COMMENCING WORK
5. ALL WASTE OR SPOIL SHALL BE TAKEN TO A CITY APPROVED SITE OR SPREAD IN AREAS
OUTSIDE OF THE STREET RIGHTS-OF-WAY AS DIRECTED BY THE OWNER AND ENGINEER.
6. CONTRACTOR TO COORDINATE WITH OWNER ON ANY TEMPORARY FENCING REQUIRED.
7. THE CONTRACTOR SHALL REPAIR ANY DAMAGES DUE TO CONSTRUCTION TRAFFIC OR
OPERATIONS.
CONSTRUCTION NOTES
1. ALL DIMENSIONS ARE TO THE FACE OF CURB, AND ALL BUILDING DIMENSIONS ARE TO THE
OUTSIDE FACE OF WALL, UNLESS OTHERWISE NOTED.
2. THE CONTRACTOR SHALL KEEP THE SITE CLEAN DURING CONSTRUCTION AND SUPPLY
CONSTRUCTION CONTAINERS OR DUMPSTERS TO MAINTAIN ALL TRASH AND DEBRIS.
3. CURRENT OKLAHOMA DEPARTMENT OF TRANSPORTATION LATEST EDITION (O.D.O.T.)
STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION SHALL BE USED FOR TECHNICAL
SPECIFICATIONS AND STANDARDS
4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONFIRM THE ACCURACY AND
LOCATION OF SITE BOUNDARY AND DIMENSIONS. ANY DISCREPANCIES DISCOVERED BETWEEN
FIELD VERIFIED LOCATIONS AND PLAN LOCATIONS SHALL BE BROUGHT TO THE ATTENTION OF
THE ENGINEER OF RECORD FOR RESOLUTION PRIOR TO PROCEEDING.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY WORK ORDERS
AND PERMITS FROM THE CITY OF EL RENO AND O.D.O.T FOR WORK ALONG HWY 66
6. CORRECTIVE MEASURES DIRECTED BY THE ENGINEER MAY INCLUDE COMPLETE REMOVAL AND
REPLACEMENT AT NO COST TO OWNER IN CASES OF POOR WORKMANSHIP OR
UNSATISFACTORY IN-PLACE CONDITIONS.
GRADING NOTES
1. NEW CONTOURS DENOTE TOP OF FINISHED PAVING OR GRADED AREA AS INDICATED. ALL SPOT
ELEVATIONS ARE TO FINISHED GRADE, UNLESS NOTED OTHERWISE.
2. ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO LOCATE AND FIELD VERIFY LOCATION AND MAKE ADJUSTMENT AS NEEDED.
3. ADJUST ALL CLEAN OUT RIMS, MANHOLE COVERS, AND VALVE AND METER BOXES TO FINISHED
GRADE.
4. NOTIFY ENGINEER IF EXISTING GROUND CONDITIONS VARY FROM THOSE SHOWN ON PLANS.
5. THE CONTRACTOR SHALL GRADE ALL AREAS TO POSITIVELY DRAIN AWAY FROM BUILDINGS.
6. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES. ANY DAMAGED UTILITIES CAUSED BY
THE CONSTRUCTION OPERATIONS SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER AND STABILIZE ANY SOFT
SOILS AS NEEDED TO REACH OPTIMUM SOIL CONDITIONS.
8. ALL DISTURBED AREAS SHALL BE SODDED. CONTRACTOR SHALL BE RESPONSIBLE FOR
SODDED AREAS UNTIL GROWTH IS ESTABLISHED.
9. CIVIL ENGINEER WILL NOT INTERPRET SOILS REPORTS OR ACCEPT RESPONSIBILITY FOR
ALTERNATIVE METHODS PROPOSED BY THE CONTRACTOR.
EROSION CONTROL
ALL DISTURBED AREAS THAT ARE NOT PAVED, OR BUILDING PADS, SHALL BE LANDSCAPED OR
REVEGETATED WITH A TEMPORARY OR PERMANENT COVER, DEPENDING ON THE PLANTING
SEASON, AS OUTLINED BELOW.
TEMPORARY COVER
PLANT PER ACRE PER 1000 SQ.FT. PLANTING DATE DEPTH OF SEEDING
ANNUAL RYEGRASS 220 LBS. 5.0 LBS. 9/01-11/30 1/4 INCH
WHEAT 130 BU. 3.0 LBS. 8/15-11/30 2 INCH
PERMANENT COVER
PLANT PER ACRE PER 1000 SQ.FT. PLANTING DATE DEPTH OF SEEDING
BERMUDA GRASS 85 LBS. 2.0 LBS. 6/15-08/15 0 - 1/2 INCH
FESCUE 350 LBS. 8.0 LBS. 9/01-11/01 0 - 1/2 INCH
PERMANENT PRACTICES
1. ALL GRADING SHALL BE COMPLETE PRIOR TO PLACING SOD.
2. THE SUBGRADE SHALL BE LOOSENED EVENLY TO A DEPTH OF 2 TO 3 INCHES AND 10- 20-10
FERTILIZER (200 POUNDS PER 1,000 SQUARE YARDS) SHALL BE MIXED WITH THE LOOSENED
SURFACE SOIL BY DISCING OR OTHER SUITABLE MEANS.
3. SOILS KNOWN TO BE HIGHLY ACIDIC SHALL BE LIME TREATED.
4. THE AREA SHALL BE WATERED REGULARLY TO MAINTAIN ADEQUATE SOIL MOISTURE UNTIL
PROPER GROWTH IS ESTABLISHED.
SEDIMENTATION & EROSION CONTROL NOTES
1. ALL PERIMETER EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
THE EXECUTION OF ANY DEMOLITION OR GRADING WORK AND SHALL BE MAINTAINED BY THE
GRADING CONTRACTOR FOR THE DURATION OF THE PROJECT.
2. SEDIMENT COLLECTED BEHIND THE SEDIMENT FILTERS AND SILT FENCES SHALL BE REMOVED
WHEN SEDIMENT REACHES ONE THIRD THE HEIGHT OF THE BARRIER.
3. SEDIMENT FILTERS AND SEDIMENT FENCES SHALL BE INSPECTED AND MAINTAINED NO LESS
THAN WEEKLY OR WITHIN 24 HOURS OF A RAINFALL EVENT OF 0.5 INCHES OR MORE.
MAINTENANCE SHALL INCLUDE BUT NOT LIMITED TO SEDIMENT REMOVAL, BARRIER REPAIR
AND/OR REPLACEMENT.
4. CONSTRUCTION SITE EXIT: THE CONTRACTOR SHALL CONSTRUCT AS A MINIMUM ONE
STABILIZED CONSTRUCTION ENTRANCE. IF ADDITIONAL INGRESS OR EGRESS TO THE
CONSTRUCTION SITE IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE
CONSTRUCTION MANAGER THE LOCATION OF THESE ADDITIONAL STABILIZED CONSTRUCTION
EXITS. USAGE OF NON-STABILIZED POINTS FOR INGRESS AND EGRESS WILL NOT BE
PERMITTED. THE STABILIZED ENTRANCES SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY AND PAVED
DRIVING LANES. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS
CONDITIONS WARRANT. REPAIR OF THE ENTRANCE(S) OR CLEANING OF THE RIGHT-OF-WAY
AND PAVED DRIVING LANES THAT HAVE BEEN SOILED SHALL BE PERFORMED BY THE
CONTRACTOR AT HIS OWN EXPENSE, SATISFACTORY TO THE CONSTRUCTION MANAGER. WHEN
NECESSARY, VEHICLE WHEELS AND TIRES SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR
TO ENTERING ONTO PUBLIC RIGHT-OF-WAY AND PUBLIC STREETS. WHEN WASHING IS
REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE.
5. SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE REMOVED FOLLOWING
CONSTRUCTION OR UPON PERMANENT STABILIZATION OF THE DISTURBED AND GRADED
AREAS, WHICHEVER OCCURS LAST.
6. CONSTRUCTION EXIT SHALL BE THE FIRST CONSTRUCTION WORK ON THE PROJECT.
7. INSTALL SEDIMENT BARRIERS DOWN SLOPE FROM CONSTRUCTION ACTIVITIES THAT DISTURB
SITE SOIL.
8. COORDINATE WITH OWNER ON CONSTRUCTION PARKING. CONSTRUCT ROCK SURFACE FOR
TEMPORARY PARKING, IF NEEDED.
9. FINAL GRADING - SEDIMENT BARRIERS WILL BE MAINTAINED DOWN SLOPE FROM DISTURBED
SOIL DURING THIS OPERATION AND REMOVED UPON COMPLETION OF ON-SITE STABILIZATION.
10. THE ACTUAL SCHEDULE FOR IMPLEMENTING POLLUTANT CONTROL MEASURES WILL BE
DETERMINED BY PROJECT CONSTRUCTION PROGRESS. DOWN SLOPE PROTECTIVE MEASURES
MUST ALWAYS BE IN PLACE BEFORE SOIL IS DISTURBED.
GENERAL CONSTRUCTION NOTES
(G-1) IN ACCORDANCE WITH THE OKLAHOMA UNDERGROUND FACILITIES DAMAGE PREVENTION ACT
THE CONTRACTOR SHALL NOTIFY THE OKLAHOMA ONE-CALL SYSTEM, INC. 48 HOURS PRIOR
TO BEGINNING EXCAVATION. OKLAHOMA ONE-CALL SYSTEM, INC. "CALL OKIE" 1-800-522-6543
OR 811.
(G-3) MAINTENANCE OF THROUGH TRAFFIC INCLUDES THE MAINTENANCE OF THE EXISTING ROAD IN
CLOSE PROXIMITY TO THE NEW CONSTRUCTION AS SHOWN ON THE PLANS.
(G-5) FOR PROJECTS THAT INCLUDE WIDENING AND/OR RESURFACING, THE CONTRACTOR SHALL
SCHEDULE OPERATIONS TO MINIMIZE POTENTIAL DROP-OFF HAZARDS AND SHALL SUBMIT A
SEQUENCE OF CONSTRUCTION OPERATIONS TO THE RESIDENT ENGINEER FOR APPROVAL
BEFORE OPERATIONS BEGIN. ANY PORTION OF THE CONSTRUCTION OPERATIONS, SUCH AS
SUPERPAVE LAYING OPERATIONS, EXCAVATION FOR PAVEMENT WIDENING, OR EXTENSION OF
ROADWAY STRUCTURES, SHALL BE LIMITED TO ONE SIDE AT A TIME, AND THE PROCEDURES
OUTLINED IN THE PAVEMENT DROP-OFF TREATMENT STANDARD PDT-1 (LATEST REVISION)
SHALL BE IMPLEMENTED. ONLY THAT AMOUNT OF OPEN TRENCH WILL BE ALLOWED THAT CAN
BE SURFACED IN 1 (ONE) DAY'S TIME WITHOUT APPROVAL BY THE ENGINEER. LIGHTS, SIGNS
AND BARRICADES SHALL BE MOVED AS WORK PROGRESSES.
(G-6) ALL TREES, BRUSH, AND OTHER DEBRIS THAT MIGHT INTERFERE WITH THE FLOW OF WATER SHALL BE CLEANED OUT TO THE RIGHT-OR-WAY LINE, AT EACH STRUCTURE AND BRIDGE, IN A
MANNER APPROVED BY THE ENGINEER. ALL COST TO BE INCLUDED IN OTHER ITEMS OF
WORK.
(G-8) ALL FLOWLINES THAT ARE TO BE FILLED SHALL BE THOROUGHLY TAMPED BEFORE
CONSTRUCTION OR EXTENSION OF DRAINAGE STRUCTURES. ALL COST TO BE INCLUDED IN
OTHER ITEMS OF WORK.
(G-9) IN ORDER TO ALLEVIATE DUST CONDITIONS DURING GRADING OPERATIONS AND BEFORE
PAVEMENT WORK IS COMPLETED, THE CONTRACTOR SHALL SPRINKLE GRADING AT
INTERVALS APPROVED BY THE ENGINEER. ALL COST TO BE INCLUDED IN OTHER ITEMS OF
WORK.
(G-11) THE CONTRACTOR SHALL NOT WASTE ANY EXCESS EXCAVATION UNTIL ALL PLANNED
EMBANKMENTS AND BACKFILLS ARE COMPLETED. EXCESS UNCLASSIFIED EXCAVATION
MATERIAL DETERMINED BY THE ENGINEER TO BE SUITABLE FOR BACKFILL SHALL BE USED TO
REDUCE ANY UNCLASSIFIED BORROW NEEDED. COST OF SECOND HANDLING SHALL BE
INCLUDED IN OTHER ITEMS OF WORK. ANY REMAINING EXCESS EXCAVATION SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND BE DISPOSED OF IN A MANNER APPROVED BY THE
ENGINEER.
(G-12) PRIME COAT SHALL BE APPLIED TO THE SUBGRADE IMMEDIATELY AFTER FINAL COMPACTION
AND SHAPING TO RETAIN MOISTURE FOR PROPER CHEMICAL REACTION OF THE SOIL
ADDITIVE.
(G-13) THE CONTRACTOR SHALL KEEP THE OPEN TRENCH DRAINED. COST TO BE INCLUDED IN
OTHER ITEMS OF WORK. AREAS ON WHICH SALVAGED TOPSOIL IS TO BE REPLACED SHALL
HAVE 18-46-0 FERTILIZER APPLIED, AT THE RATE OF 150 POUNDS PER ACRE, JUST PRIOR TO
THE REPLACEMENT OF SALVAGED TOPSOIL.
(G-39) EXCESS ASPHALT AT JOINTS AND CRACKS IN EXISTING PAVEMENT SHALL BE REMOVED
FLUSH TO TOP OF PAVING IN A MANNER APPROVED BY THE ENGINEER.
(SP-1) CONTRACTOR AND ALL RELATED CONSTRUCTION ACTIVITIES ARE REQUIRED TO MAINTAIN
NORMAL NOISE LEVELS AND ALL EQUIPMENT AND VEHICLES ARE REQUIRED TO BE PROPERLY
MUFFLED.
(SP-2) THE CONTRACTOR SHALL COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) AND MAINTAIN VIABLE TRENCH SAFETY SYSTEM AT ALL TIMES.
(SP-3) COORDINATE WITH OWNER ON ANY ROAD CLOSURES REQUIRED DURING CONSTRUCTION.
CONTRACTOR TO DEVELOP AND SUBMIT A TRAFFIC CONTROL PLAN PRIOR TO
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
3QUANTITY TABLES
ROADWAY PAY QUANTITY NOTES
(R-2) ESTIMATED QUANTITY ONLY. TO BE USED IN A MANNER APPROVED BY THE ENGINEER, FOR MISCELLANEOUS
GRADING.
(R-4) AN ESTIMATED QUANTITY OF20 C.Y. TOPSOIL TO BE RESERVED FOR REPLACEMENT OF APPROXIMATELY 5” ON COMPLETED FORESLOPES, DITCHES, AND BACKSLOPES. THIS QUANTITY IS INCLUDED IN THE EARTHWORK BALANCE. ANY ADDITIONAL EXCAVATION REQUIRED IN CUT SECTIONS TO ALLOW FOR PLACEMENT OF TOPSOIL TO
FINAL GRADE, SHALL BE INCLUDED IN THE PRICE BID.
(R-6) FOR SOLID SLAB SODDING PRICE BID TO INCLUDE COST OF 10-20-10 FERTILIZER, ESTIMATED AT 200 POUNDS PER
1,000 SY .
(R-7) FOR SOLID SLAB SODDING PRICE BID TO INCLUDE COST OF WATERING, ESTIMATED AT 80 GALLONS PER SY .
(R-8) PRICE BID TO INCLUDE COST OF ALL NECESSARY MAINTENANCE, MAINTAINING DEVICE IN PROPER UPRIGHT POSITION, REMOVAL OF DEVICE, AND REMOVAL OF SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE
DEVICE.
(R-16) PAYMENT FOR THIS ITEM WILL BE THE THEORETICAL CROSS SECTION MULTIPLIED BY THE INSTALLED LENGTH.
(R-19) PRICE BID TO INCLUDE THE CHEMICAL ADDITIVE(S) TO ACHIEVE THE RATE SPECIFIED FOR THE APPROPRIATE SOIL CLASSIFICATION AS SPECIFIED IN THE MOST CURRENT ODOT MATERIALS DIVISION OHD L-50. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLASSIFY THE SOIL AND DETERMINE THE APPROPRIATE ADDITIVE(S).
(R-25) ESTIMATED AT 0.075 GALLONS PER SQUARE YARD OF ORIGINAL EMULSION OF TACK COAT (BEFORE DILUTION FOR
APPLICATION) IN ACCORDANCE WITH SECTION 407 OF THE STANDARD SPECIFICATIONS..
(R-26) ESTIMATED AT 112 LBS. PER SQ. YD. PER 1” THICK.
(R-29) PRICE BID TO INCLUDE COST OF FOG SEAL, MEETING THE REQUIREMENTS OF SECTION 407 OF THE STANDARD
SPECIFICATIONS.
(R-39) INCLUDES REMOVAL OF ALL EXISTING ROADWAY DRAINAGE STRUCTURES, HEADWALLS (UNLESS OTHERWISE
SPECIFIED), INLETS, FENCES, AND OTHER STRUCTURES WITHIN THE RIGHT OF WAY.
(R-40) TO BECOME THE PROPERTY OF AND BE DISPOSED OF BY THE CONTRACTOR IN A MANNER APPROVED BY THE
ENGINEER.
(R-41) MATERIALS REMOVED SHALL NOT BE MEASURED FOR PAYMENT UNDER SECTION 202.06 UNCLASSIFIED
EXCAVATION.
FABRIC REINFORCEMENT EXISTING
ASPHALT
PAVING
EXISTING
GROUND
TYPICAL SECTION 1
ASPHALT OVERLAY
SCALE 1"= 2'
2" ASPHALT CONCRETE OVERLAY
TYPE S4 (PG 64-22)
1" NOMINAL
ASPHALT CONCRETE
FOR LEVELING TYPE
S5 (PG 70-28)
10' ± 10' ±
20' ± MATCH EXISTING WIDTH
℄ ROAD
1' 1'
TACK COAT
MATCH
EX SLOPE
MATCH
EX SLOPE
10' ± 10' ±
20' ± MATCH EXISTING WIDTH
℄ ROAD
6" ODOT AGG BASE
W/ FABRIC SEPARATOR
2-2" LIFTS OF ASPHALT CONCRETE
TYPE S3 (PG 64-22)
EXISTING
GROUND
TYPICAL SECTION 2
ASPHALT RECONSTRUCTION
SCALE 1" = 2'
8" COMPACTED SUBGRADE
2" ASPHALT CONCRETE OVERLAY
TYPE S4 (PG 64-22)
MATCH
EX SLOPE
MATCH
EX SLOPE
10' ± 10' ±
20' ± MATCH EXISTING WIDTH
TACK COAT AND FABRIC
REINFORCEMENT
2" COLD MILL AC PAVEMENT
2" ASPHALT CONCRETE OVERLAY
TYPE S4 (PG 64-22)
EXISTING
GROUND
TYPICAL SECTION 3
ASPHALT MILL AND OVERLAY
SCALE 1" = 2'
EX. CURB TO
REMAIN
IF NO CURB IS PRESENT WITH CURB PRESENT
EXISTING ASPHALT
PAVEMENT
MATCH
EX SLOPE
MATCH
EX SLOPE
EXISTING
GROUND
2" ASPHALT CONCRETE OVERLAY
TYPE S4 (PG 64-22)
10' ±
TYPICAL SECTION 4
OVERLAY AT ASPHALT DRIVES
SCALE 1" = 2'
4'
5% MAX SLOPE
2" TAPER MILL
EXISTING
GROUND
2" ASPHALT CONCRETE OVERLAY
TYPE S4 (PG 64-22)
10' ±
TYPICAL SECTION 5
OVERLAY AT FIELD ENTRANCES
SCALE 1" = 2'
2'
10% MAX SLOPE
2" TAPER MILL
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
4TYPICAL SECTIONS &
DETAILS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
EX BUILDING
EX BUILDING
EX SIDEWALK
EX CONCRETE
PAD
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX SIDEWALK
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
CUSTER ST
W CHEYENNE ST
2N D
ST
PHASE 3ARAPAHO ST
JE
SS
E
RE
N O
S T
PHASE 3TRUCK ST 1ST ST
AR
AP
AH
O
S T
4TH ST
5TH ST
5T H
ST
SH
ER
ID
AN
S T
1ST ST
SO
AP
S U
DS
R
D
SEE DETAIL C
SHEET 7
FO
RT
R
EN
O R
D
PH
EAST CAM
PUS ROAD - PH 2
138913 89 13
93 13
PHASE 2
PHASE 3
PHASE 2
PHASE 3
PHASE 1
X
X X
X
X X
X X
X
26'
82.6'
'21'
PHASE 1
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
5PAVING PLAN FORT ROADS -
PHASE 3
TYPICAL SECTION 3
ASPHALT MILL AND OVERLAY
TYPICAL SECTION 2
ASPHALT RECONSTRUCTION
TYPICAL SECTION 1
ASPHALT OVERLAY
LEGEND
PHASE 1
DETAIL C
SCALE 1" = 20'
XXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X
X
X X
FORT RENO RD - PH 2
SEE DETAIL B
SHEET 7
SEE DETAIL A
SHEET 8
.0
2'
TR
AS
H
W
M E
/ G
AT
E
KE
YP
AD
FO T
T
FO
LP
M E
/ G
AT
E
BO
X
SE
E
PI
C M
E / 5
X5 B
O X
W / 2
/2
IN
C
O N
D U
IT
S
TO
G
R O
U N
D M
E / G
AT
E
SE
N
SO
R
W / 1
/2
IN
C O
N D
U
IT
T O
B O
X M E
/ G
AT
E
SE
N
SO
R M
E / G
AT
E
BO
X
SE
E
PI
C
M E
/ 2
X1
IN
W / 1
/2
IN
C O
N D
U
IT
T O
G R
O U
N D
EM
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E 40' Right-of-W ay per FAP-164(9) 40' Right-of-W ay per FAP-164(9)
AT&T
FENCE, 5BW
GRAZINGLANDS
RESEARCH LABORATORY
AT&TPIONEER
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW FENCE, 6BW
EXPOSED RCB
18" RCP
CONCRETE SILTED FL = 1400.68
18" RCP
FL = 1399.38
4'X2' RCB
FL = 1394.02
4'X2' RCB
FL = 1394.12
PHASE 1 PHASE 2
FORT RENO RD - PH 1
X X
X
XXXXXXXXXXXXXXXXXXX
XXXXXXXXX
X X X X X X X X X X
X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X
X X
X
FORT RENO RD -PH 2
FLOWLINE (TYP)
FLOWLINE (TYP)
EX STORM PIPEFIELD ENTRANCE
EX STORM PIPE
PHASE 1
SEE DETAIL C
SHEET 7
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW
FENCE, 6BW
FENCE, 4BW
6.8'X2.5' RCB
FL = 1364.69
6.8'X2.5' RCB
FL = 1364.63
61 1361
63 136313
M
AT
CH
LI
N E
M
AT
CH
LI
N E
M
AT
CH
LI
N E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
6PAVING PLAN
FORT RENO RD (1)
TYPICAL SECTION 3
ASPHALT MILL AND OVERLAY
TYPICAL SECTION 2
ASPHALT RECONSTRUCTION
TYPICAL SECTION 1
ASPHALT OVERLAY
LEGEND
X
X
X
X
X X
X
X
X
X
X
X
XXXXXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
EX STORM PIPE
EX STORM PIPE
EX BUILDING
FLOWLINE (TYP)
FIELD ENTRANCE
EX STORM PIPE
EX BUILDING
530'
PHASE 1 FORT RENO RD - PH 2
EAST CAMPUS ROAD - PH 2
PHASE 3
PHASE 2
PHASE 1
X
X
1402.30'
CLR1
ME / GATE KEYPAD
FO T
1402.12'
CLR1
1401.79'
CLR1
1401.53'
CLR1
1401.13'
CLR1
1400.57'
CLR1 PC 1400.44'
CLR1
LP
ME / GATE BOX SEE PICME / 5X5 BOX W/ 2 1/2IN CONDUITS TO GROUNDME / GATE SENSOR W/ 1/2IN CONDUIT TO BOX
ME / GATE SENSORME / GATE BOX SEE PICME / 2 2X1IN W/ 1/2IN CONDUIT TO GROUND
EM
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
FO FO FO FO FO FO
FO FO FO FO FO FO
RESEARCH LABORATORY
AT&T
PIONEER
R35' R25'
297.8'
XXXXXXXXX
X X X X X X X X X
EXPOSED RCB
4'X2' RCB
FL = 1394.12
120'
XXX
X
X
XXXXX
X X X X X X X X
X
X
X
X
6.8'X2.5' RCB
FL = 1364.69
6.8'X2.5' RCB
FL = 1364.63
18'
200'
PHASE 1
M
AT
CH
LI
N E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
7PAVING PLAN
FORT RENO RD (2)
TYPICAL SECTION 3
ASPHALT MILL AND OVERLAY
TYPICAL SECTION 2
ASPHALT RECONSTRUCTION
TYPICAL SECTION 1
ASPHALT OVERLAY
LEGEND
DETAIL A
SCALE 1" = 20'
DETAIL B
SCALE 1" = 20'
DETAIL C
SCALE 1" = 20'
TP 1397.73
RCB - 1
38 LF 4' X 2' RCB W/O WINGWALLS
FL IN = 1393.3
FL OUT = 1393.0
TP 1397.9
TP 1397.9
FL 1425.465 LF 18" RCP WITH PRECAST END
SECTIONS
FL 1419.9
PROP DITCH
EX. R/WEX. R/W
RCB - 3
35 LF 8' X 3' RCB W/O WINGWALLS
FL IN = 1363.1
FL OUT = 1362.75
TP 1369TP 1369.167
TP 1369.167
XXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
TREELINE (TYP)
EX BUILDING
EX CONCRETE
PAD
EX SIDEWALK
FIELD ENTRANCE
FIELD ENTRANCE EX STORM PIPE
EAST CAMPUS ROAD - PH 2
13631365
671369
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
XX
XXX
X
X
X
X
X
FLOWLINE (TYP)
TREELINE (TYP)
TREELINE (TYP)
TREELINE (TYP)
FLOWLINE (TYP)
TREELINE (TYP)
EX BRIDGE D
EX GUARDRAIL
EX GUARDRAIL
FIELD ENTRANCE
BEGIN 100'
TRANSITION TO
MATCH EXISTING
BEGIN 100'
TRANSITION TO
MATCH EXISITNG
END OVERLAY AT
BRIDGE D
RECONSTRUCTION
BEGIN OVERLAY AT
BRIDGE D
RECONSTRUCTION
EAST CAMPUS ROAD - PH 2
M
AT
CH
LI
N E
M
AT
CH
LI
N E
M
AT
CH
LIN
E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
8PAVING PLAN
ROAD 1 (1)
TYPICAL SECTION 3
ASPHALT MILL AND OVERLAY
TYPICAL SECTION 2
ASPHALT RECONSTRUCTION
TYPICAL SECTION 1
ASPHALT OVERLAY
X X
X
X X X X X X
X X X X X X X X
X
X
X
X
XXXXXXXXXXXX
X
X
XXXXXXX
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FLOWLINE (TYP)
FLOWLINE (TYP)
CATTLE PENS
FIELD ENTRANCE
EX
STORM
PIPE
EX BUILDING
EX BUILDING
EX STORM PIPE
BEGIN 100'
TRANSITION TO
MATCH EXISTING
END OVERLAY AT
EXISTING GATE
EAST CAMPUS ROAD - PH 2
77 13
77 13
1375 13
M
AT
CH
LI
N E
M
AT
CH
LI
N E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
9PAVING PLAN
ROAD 1 (2)
TYPICAL SECTION 3
ASPHALT MILL AND OVERLAY
TYPICAL SECTION 2
ASPHALT RECONSTRUCTION
TYPICAL SECTION 1
ASPHALT OVERLAY
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
FO
RT
R
EN
O R
D
EX BUILDING
EX BUILDING
EX SIDEWALK
EX CONCRETE
PAD
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX SIDEWALK
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
EX BUILDING
PLACE SILT FENCE
PERPENDICULAR TO
DITCH FLOW EVERY 100'
PLACE SILT FENCE
PERPENDICULAR TO
DITCH FLOW EVERY 100'
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
10EROSION CONTROL PLAN (1)
LEGEND
EX CONTOURS
PROP CONTOURS
SILT FENCE
CONSTRUCTION ENTRANCE
INLET SEDIMENT FILTER
CURB OPEN SEDIMENT FILTER
FLOW DIRECTION
SILT DIKE
XXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X
X
X X
FORT RENO RD
PLACE SILT FENCE
PERPENDICULAR TO
DITCH FLOW EVERY 100'
138713
971399
X X
X
XXXXXXXXXXXXXXXXXXX
XXXXXXXXX
X X X X X X X X X X
X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X
X X
X
FORT RENO RD
FLOWLINE (TYP)
FLOWLINE (TYP)
EX STORM PIPEFIELD ENTRANCE
EX STORM PIPEPLACE SILT FENCE
PERPENDICULAR TO
DITCH FLOW EVERY 100'
71 13
M
AT
CH
LI
N E
M
AT
CH
LI
N E
M
AT
CH
LI
N E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
11EROSION CONTROL PLAN (2)
LEGEND
EX CONTOURS
PROP CONTOURS
SILT FENCE
CONSTRUCTION ENTRANCE
INLET SEDIMENT FILTER
CURB OPEN SEDIMENT FILTER
FLOW DIRECTION
SILT DIKE
X
X
X
X
X X
X
X
X
X
X
X
XXXXXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
FORT RENO RD
EX STORM PIPE
EX BUILDING
FLOWLINE (TYP)
FIELD ENTRANCE
EX STORM PIPE
EX BUILDING
PLACE SILT FENCE
PERPENDICULAR
TO DITCH FLOW
EVERY 100'
M
AT
CH
LI
N E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
12EROSION CONTROL PLAN (3)
LEGEND
EX CONTOURS
PROP CONTOURS
SILT FENCE
CONSTRUCTION ENTRANCE
INLET SEDIMENT FILTER
CURB OPEN SEDIMENT FILTER
FLOW DIRECTION
SILT DIKE
XXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
FORT RENO RD
TREELINE (TYP)
ROAD 1
EX BUILDING
EX CONCRETE
PAD
EX SIDEWALK
FIELD ENTRANCE
FIELD ENTRANCE EX STORM PIPE
13611371
136313
135113 511361
137113 81 13
135513 571359
136313
PLACE SILT FENCE
PERPENDICULAR TO
DITCH FLOW EVERY 100'
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
XX
XXX
X
X
X
X
X
FLOWLINE (TYP)
TREELINE (TYP)
TREELINE (TYP)
TREELINE (TYP)
FLOWLINE (TYP)
ROAD 1
TREELINE (TYP)
EX BRIDGE
EX GUARDRAIL
EX GUARDRAIL
FIELD ENTRANCE
PLACE SILT FENCE
PERPENDICULAR TO
DITCH FLOW EVERY 100'
M
AT
CH
LI
N E
M
AT
CH
LI
N E
M
AT
CH
LIN
E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
13EROSION CONTROL PLAN (4)
LEGEND
EX CONTOURS
PROP CONTOURS
SILT FENCE
CONSTRUCTION ENTRANCE
INLET SEDIMENT FILTER
CURB OPEN SEDIMENT FILTER
FLOW DIRECTION
SILT DIKE
X
X X X X X X
X X X X X X X X
X
X
X
X
XXXXXXXXXXXX
X
X
XXXXXXX
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FLOWLINE (TYP)
FLOWLINE (TYP)
CATTLE PENS
FIELD ENTRANCE
EX
STORM
PIPE
EX BUILDING
EX BUILDING
ROAD 1
EX STORM PIPE
PLACE SILT FENCE
PERPENDICULAR TO
DITCH FLOW EVERY 100'
138113831385
75 13
77 13
77 13
71 13
71 13 73 13
75 13
M
AT
CH
LI
N E
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
14EROSION CONTROL PLAN (5)
LEGEND
EX CONTOURS
PROP CONTOURS
SILT FENCE
CONSTRUCTION ENTRANCE
INLET SEDIMENT FILTER
CURB OPEN SEDIMENT FILTER
FLOW DIRECTION
SILT DIKE
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
FO
RT
R
EN
O R
D
001400
13701370
1390 13
1410141014
US RT 66
US 40 BUSINESS
Walter P. Moore and Associates, Inc.
7666 E 61st St., Suite 251 Tulsa, Oklahoma 74133
918.806.7200
15DRAINAGE AREA MAP
LEGEND
EXISTING CONTOUR
PROPERTY LINE
DRAINAGE AREA BOUNDARY
725 725
DRAINAGE AREA LABEL
ACRES
DRAINAGE AREA 100YR RUNOFF (CFS)