Sol_12805B24Q0033_Amd_0001.pdf
PDF 89 KB Posted
- Attached to
- Electronic Controls & Mechanical Repairs to NCSL HVAC System Federal contract opportunity
- Solicitation number
- 12805B24Q0033
About this file
This amendment modifies a solicitation for repairs and upgrades to the HVAC mechanical equipment at the National Center for Supercomputing Applications Laboratory. The work includes replacing leaking steam coils and valves in multiple air handlers, upgrading pneumatic controls to direct digital controls, replacing additional leaking components, and installing check valves and variable frequency drives. The Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area is the contracting agency. The response due date is unchanged from the original solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Statement of Work 12805B24Q0033 Rev1.pdf | ||
| Attachment 1 Statement of Work 12805B24Q0033.pdf | ||
| Attachment 2 Service Contract Act WD _ 2015-4969 Rev 23 Date 2023.06.30 Fargo ND.pdf | ||
| Sol_12805B24Q0033 (Combined).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12805B24Q0033 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12805B
FORT COLLINS CO 80526
BLDG D, SUITE 300
2150 CENTRE AVENUE
USDA ARS PA AAO ACQ/PER PROP
11/20/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/20/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to re-define the scope of work as revealed during the recent site visit including an adjustment to required work.
LIST OF CHANGES:
Solicitation due time : No Change
Update Attachment 1 Statement of Work 12805B24Q0033 to Rev1
CHANGES FOR LINE ITEM NUMBER: 1
Description changed from Repairs & Upgrades to HVAC Mechanical Equipment
- Replace all four steam coils leaking in Air Handler #3 in the West Penthouse.
- Replace all four steam gate valves and two pneumatic controlled steam valves currently
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KELLY D. WRIGHT
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12805B24Q0033/0001 leaking.
- Replace the existing controls on Unit #3 which are Pneumatic and in need of upgrade.
- Replace pneumatic controllers with DDC actuators on Air Handler #6.
- Replace leaking steam coil in air handler
#BP-AH-1.
- Replace original team traps, strainers, isolation valves, check valves, and vacuum breakers.
- Install check valves on discharge side of two
(2) glycol pumps for refrigeration equipment and install two (2) VFD drives. to Repairs & Upgrades to HVAC Mechanical Equipment
- Replace all four steam coils leaking in Air
Handler #3 in the West Penthouse.
- Replace all four steam gate valves and two pneumatic controlled steam valves currently leaking.
- Replace the existing controls on Unit #3 which are Pneumatic and in need of upgrade.
- Replace pneumatic controllers with DDC actuators on Air Handler #6.
- Replace leaking steam coil in air handler
#BP-AH-1.
- Remove and replace (4) steam traps and (4) strainers located in the ceiling on the 2nd floor in front of room 248.
- Replace original team traps, strainers, isolation valves, check valves, and vacuum breakers.
- Install check valves on discharge side of two
(2) glycol pumps for refrigeration equipment and install two (2) VFD drives.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .