This document outlines a scope of work for a federal contract to install a concrete ramp and pathway at a USDA research laboratory. The contractor will demolish and remove the existing concrete ramp and section of damaged pad adjacent to a building doorway. A new concrete pad and ADA-compliant ramp with handrail will be installed, connecting to the parking lot with appropriate slope and dimensions. Additionally, the contractor will raise the soil gradient near a greenhouse doorway, and pour an 8-foot by 22-foot concrete walkway connecting the greenhouse exit to the parking lot. The concrete must meet a minimum strength of 4,500 PSI, and ground compaction standards. All work must adhere to local, state and federal regulations and be completed within 60 days of award. Inspections will be conducted before final payment.

The related federal contract opportunity is solicitation number 12805B24Q0029 to install the concrete ramp and pathway at the USDA Agricultural Research Service facility in Fargo, North Dakota.

View the file

Other files for this federal contract opportunity

Other files attached to Install Concrete Ramp and Pathway, newest first.
File Type Posted
Questions and Answers Amendment 0002.pdf PDF
Sol_12805B24Q0029_Amd_0002.pdf PDF
Wage Determination ND20230013.pdf PDF
Sol_12805B24Q0029_Amd_0001.pdf PDF
Attachment 5 ARS-372.pdf PDF
Solicitation 12805B24Q0029.pdf PDF
Attachment 2 Wage Determination ND20230006.pdf PDF
Attachment 1 Scope of Work.pdf PDF
Attachment 3 Schedule of Pricing (MS Excel Interactive Document).xlsx XLSX spreadsheet
Attachment 4 ARS-371.pdf PDF
Site Visit Information.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Rev 1 – 11/20/2023

Project: Concrete Ramp and Walkway at USDA BRL

Location: Biosciences Research Laboratory, 1616 Albrecht Blvd N, Fargo, ND

58102

GENERAL INFORMATION

1.0 Performance Work Statement: USDA-ARS in Fargo, ND, has a requirement for two (2) concrete projects. The first is to install an ADA compliant ramp, pad, and handrail, and the second is to install an 8’ by 22’ walkway from roadway to greenhouse door with an inclined slope to minimize a trip hazard. Pictures are included.

2.0 Background: The existing concrete ramp, pad, and handrail have exceeded it’s lifespan and must be replaced. Additionally, the exit to a greenhouse poses a trip hazard due to the absence of a sloped walkway from door to roadway similar to those which extend from adjacent greenhouse doors.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

A. ADA Compliant Ramp

• Demolish and remove from premises the existing concrete ramp, section of damaged concrete pad adjacent to the doorway, and the existing handrail.

• Pour and install new concrete pad adjacent to doorway to replace damaged section, approximately 7 feet wide, 7 feet long, and 8 inches in height.

o *Concrete shall have a minimum strength of 4,500 PSI o *Ground under concrete shall be properly compacted.

• Pour and install new concrete ramp from pad into the parking lot. Ramp should be approximately 6 feet in width. Ramp should start at the same height as the concrete pad and then slope down into the parking lot resulting in approximately 10 feet in length.

o Ramp should have a 1:12 slope ratio o Ramp should have all edges protected to minimize risk of falling o Ramp should have bottom landing at least 60 inches in length o Ramp should contour with the existing curb and adjacence infrastructure.

o Ramp should merge seamlessly into the parking lot.

o *Concrete shall have a minimum strength of 4,500 PSI o *Ground under concrete shall be properly compacted.

• Replace the existing handrail with appropriate railing that is ADA compliant.

B. Concrete Walkway to Greenhouse

• Raise gradient of soil near the greenhouse doorway by approximately 10 inches by adding additional soil.

• Pour a concrete pad walkway connecting the greenhouse doorway to the nearby parking lot that is approximately 22 feet long and 8 feet wide.

o *Concrete shall have a minimum strength of 4,500 PSI o *Ground under concrete shall be properly compacted.

• Ensure all local, state, and federal regulations are adhered to during completion of this project.

4.0 Deliverable / Schedule: 60 days after award.

5.0 Government Furnished: Photographs of the existing concrete pad and ramp that needs to be demolished and removed is included in this request, as well as pictures of the existing walkways to greenhouses. A brief sketch of what we are requesting be installed to replace this demolished pad and ramp is also included.

6.0 Travel: Not Applicable.

7.0 Contractor’s Key Personnel: Point of contact’s name and phone number is required.

8.0 Security Requirements: Not Applicable.

9.0 Data Rights: Not Applicable.

10.0 Section 508 – Electronic and Information Technology Standards: Not Applicable.

11.0 Performance Requirement Measures: Items will be inspected before payment will be rendered.

Attachment

ADA Compliant Ramp (Photographs included below)

Front View

Side View 1

Rear View

Side View 2

Side of pad from Parking Lot

Side of pad from lawn

Concrete Walkway from roadway to Greenhouse Exit Door

Wide View

Close up of Door

Side View 1

Close up of Door

Side View 2

Existing ramp in area to match style

Sketches of requested work = ADA Compliant Ramp:

Project Progress and Completion

6.0 Travel: Not Applicable.