2020.09.03 - Questions and Answers.pdf
PDF 116 KB Posted
- Attached to
- Boiler Replacement Federal contract opportunity
- Solicitation number
- 12805B20Q0161
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pictures of Nod 1 Panel Schematics.pdf | ||
| 2020.09.04 - Questions and Answers.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| Attachment VIII - Mech Plan 1993.pdf | ||
| Attachment VII - Existing Boiler Room Plan 20200722.pdf | ||
| Attachment II - Replace Boiler SOW 20200806.pdf | ||
| Attachment III - ARS-371.pdf | ||
| RFQ - 12805B20Q0161.pdf | ||
| Attachment I - DBA Wage Rates.pdf | ||
| Attachment V - Bond Forms.pdf | ||
| Attachment VI - FAR Deviation Accelerated Payments to Small Business.pdf | ||
| Attachment IV - ARS-372.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09/03/20
Solicitation (RFQ) – 12805B20Q0161- Boiler Replacement
USDA ARS Akron, CO
Questions & Answers
Answers are in Red:
1. Would you like us to provide past performance (CPARS) in our proposal, or are you going to look at all CPARS reviews online? See section M. Evaluation Factors for Award, page 26 of the
Solicitation. I will be looking online.
2. Can the bid due date be extended due to the fact that the site visit was on 9/1 and once RFI’s are returned, we will likely only have 1-2 days to compile an accurate proposal? Yes it will be extended.
3. The SOW #3 states “See attached file “Mech Plan 1993.tif” and “Existing Boiler Room Plan
20200722.jpg” for additional information about the Boiler, Pump, and location of existing boiler. These files were not included on the SAM website. Please provide. These attachments added to Beta.Sam
4. Please provide the site visit list. Added to beta.sam
5. Please confirm if the boiler is condensing or non-condensing. Non-condensing
6. Please confirm if the existing pump is to be replaced. The three Temperature Zone circulating
Pumps will not be replaced. If the Boiler calls for an internal circulating pump That will need to be provided.
7. Please confirm if this is a glycol system. If so, what percentage is required? No