Attachment_04_-_Schedule,_DOW,_Maps.pdf
PDF 917 KB Posted
- Attached to
- Mark Twain - ERFO Work Federal contract opportunity
- Solicitation number
- 1264R419R0004
About this file
Attachment 04 - Schedule, DOW, Maps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REVISED_16July_-_Attachment_04.pdf | ||
| 1264R419R0004_-_Amendment_02.pdf | ||
| 1264R419R0004_-_Amendment_01.pdf | ||
| Attachment_01_-_Schedule,_DOW,_Maps.pdf | ||
| 1264R419R0004_-_BID_COPY.pdf | ||
| Attachment_06_-_2019_FP-14_Supplemental_Specs.pdf | ||
| Attachment_8_-_Technical_Proposal_Guide.docx | DOCX document | |
| 1264R419R0004.pdf | ||
| Attachment_03_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_02_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_05_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_07_-_MO_20190001.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE - REGION NINE
MARK TWAIN NATIONAL FOREST
Salem Ranger District
Forest Road 3906 Bunker AF
REYNOLDS COUNTY
Salem 2017 ERFO Project
Salem 2017 ERFO Project 2
SCHEDULE OF ITEMS
BID ITEM – Forest Road 3906 Bunker AF
ITEM
NUMBER DESCRIPTION
METHOD
OF
MEASURE
PAY
UNIT
ESTIMATED
QUANTITY
UNIT
COST
SUBTOTAL
15101-
Mobilization CQ LPSM 1
50101-
#4 Rebar, Reinforced 2”X 2” grid pattern 10’ X 10’ X 6” poured 4000Psi concrete slab on grade
CQ LPSM 1
25102-
Placed Riprap , Class II Method A
% of Rock Equal or Smaller by Count, Dx
Range of Intermedi ate Dimension s, inches
Range of Rock Mass, pounds
100 9-15 59-270 85 7-11 28-110 50 5-8 10-42 15 3-6 2-18
CQ TON 10
30101-
Aggregate surface base course Grading Sieve Size Percent Passing 2” 100 (1) 1” 80-100(6) 3/4” 64-94 (6) 3/8” 40-69 (6) No. 4 31-54 (6) No. 200 4-7 (3)
Compaction method A
CQ TON 32
63501-
Temporary Traffic Control CQ LPSM 1
ITEM TOTAL: $
Salem 2017 ERFO Project 3
Notes
* Incidental to Item 50101 will include temporary channel diversion and soil and water protection. Dewatering plan needs to be submitted to COR 15 days prior to implementation to be approved.
* All work will be within the road prism from MP 0.59 – 0.61 and be approved by the COR.
* Contractor is responsible for actual measurements for quantities.
* Contractor shall contact 1-800-DIG-RITE and obtain any applicable State or Federal permits needed.
* Contractor is responsible for all traffic control according with MUTCD regulations.
• Governing specifications: FP-14 (available https://flh.fhwa.dot.gov/resources/specs/), Forest Service Supplement Specifications 2017.
• Quantities for Pay Items 25120 and 30101 are contract quantities. Weight tickets for each load of aggregate will be provided to the COR or Inspector prior to final inspection.
https://flh.fhwa.dot.gov/resources/specs/
Salem 2017 ERFO Project 4
DESCRIPTION OF WORK
FR3906 Bunker AF
Milepost Description of Work
0.59 – 0.61 Saw cut existing concrete to accommodate a 10’ X 10’ X 6” poured slab. Drill and Epoxy #4 rebar to existing concrete structure on each side of the proposed slab at minimum of 2’ to adjoin existing structure to new one. Begin subgrade prep to pour a 10’ X 10’ X 6” concrete slab, reinforced with #4 rebar with a 2’ X 2’ grid Pattern. COR will be on site to approve subgrade and reinforcement placement Prior to pouring concrete.
After slab is poured the approach and exit will have 16 tons each spread at 2” deep 12’ wide on road, Also 5 tons of riprap will be added to upstream and downstream side of crossing.
| SCHEDULE OF ITEMS |
| DESCRIPTION OF WORK |