Attachment_01_-_Schedule,_DOW,_Maps.pdf
PDF 3 MB Posted
- Attached to
- Mark Twain - ERFO Work Federal contract opportunity
- Solicitation number
- 1264R419R0004
About this file
Attachment 01 - Schedule, DOW, Maps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1264R419R0004_-_Amendment_02.pdf | ||
| REVISED_16July_-_Attachment_04.pdf | ||
| 1264R419R0004_-_Amendment_01.pdf | ||
| 1264R419R0004_-_BID_COPY.pdf | ||
| Attachment_06_-_2019_FP-14_Supplemental_Specs.pdf | ||
| Attachment_05_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_04_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_07_-_MO_20190001.pdf | ||
| Attachment_8_-_Technical_Proposal_Guide.docx | DOCX document | |
| 1264R419R0004.pdf | ||
| Attachment_03_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_02_-_Schedule,_DOW,_Maps.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
FR 4349 – Deer Leap
Eleven Point Ranger District Mark Twain National Forest
Ripley County, Missouri
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
LUMP SUM 1
30202-1 Crushed aggregate: grading 1” minus, Compaction method 1
Ton 703 $_______ $________
30301-6 Roadway Reconditioning, Compaction Method A Lump Sum 1 $_______ $________
Total $__________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
All items are design quantities; no payment will be made for variations within +/-15% of the design quantity, without a CO approved modification.
Any necessary excavation or clearing and grubbing per the Description of Work will be incidental to pay item 30301-6, roadway reconditioning.
FR 4349 Deer Leap – Parking Loop
MILEPOST DESCRIPTION OF WORK
N/A Replenish aggregate surface on existing parking area with 1” clean crushed aggregate a depth of 2”.
Approximate overall dimensions are 250’ x 151’; all areas will not be covered.
Place in areas directed by the COR.
Contractor should verify designated placement area at prebid meeting.
Ensure a smooth even surface.
FR 4349 Deer Leap – Road/Camping Loop
MILEPOST DESCRIPTION OF WORK
0.00 Begin where asphalt ends.
Clean and recondition surface and all outlets; cut ditches no less than 1 foot deep.
Begin spreading 1” clean crushed aggregate a depth of 2” and a width of 20’.
Clean inlet/outlets of all culverts to allow for proper drainage.
0.29 Turn right through gate into camping area.
Continue reconditioning of surface and outlets as well as spreading 1” clean crushed aggregate.
Reduce aggregate spread width to 14’.
0.48 End reconditioning of FR 4349.
End placement of 1” clean crushed aggregate a depth of 2” and width of 14’.
FR 4349 DEER LEAP LOCATION MAP – ELEVEN POINT DISTRICT
RIPLEY COUNTY
From Doniphan, MO: Proceed north on SH Y approx. 4.6 miles to entrance of FR 4349 left
Schedule of Items
FR 4282 - Watercress Recreation Area Eleven Point Ranger District Mark Twain National Forest
Oregon County, Missouri
ITEM
NO. DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum 1
20101 Clearing and Grubbing Lump Sum 1
20308 Removal of Pavement, Asphalt Square Yard 1875
30103 Aggregate Base Ton 550
40314 Asphalt Concrete Pavement (3” depth) Ton 320
43004 Full depth pavement repair (saw cut, 6” base rock, 3” asphalt) Square Yard 50
60910 Wheel-stop, Concrete Each 15
63413 Permanent Pavement Markings Lineal Foot 650
63501 Temporary Traffic Control Lump Sum 1
B-2 - NOTE:
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
Compaction Method 1 shall be for aggregate placement compaction according to FP-14 302.05(a).
Asphalt compaction shall be in accordance with FP-14 403.09.
All items are design quantities; no payment will be made for variations within +/-15% of the design quantity, without a CO approved modification.
FR 4282 - Watercress Recreation Area
Scope of Work
Reconstruct parking area that was damaged during flooding.
Description of Work
Layout parking area and establish construction limits as per COR directions Place temporary traffic control measures prior to commencement of work Mobilize equipment Remove 6 trees to include stumps and root balls Remove 600 tons of existing asphalt and topsoil with organic material Grade construction limits for 75’ x 225’ x 6” parking area Place and compact base aggregate for 75’ x 225’ x 6” parking area Saw-cut 250’ asphalt along road that parking area will adjoin to Clean and prepare 1875 square yards of site for asphalt placement Place and compact 1875 square yards of asphalt at 3 depth Paint 23 standard parking lines, each 25 feet long and 4 inches wide for parking areas, as shown on plan view Paint 3 handicap accessible parking lines, each 25 feet long and 4 inches wide for parking areas, as shown on plan view Install 15 wheel stops Demobilize equipment Remove temporary traffic control measures upon completion of work
Notes:
• Where applicable parking areas shall comply ADA Design Standards
Mark Twain National Forest – Eleven Point Ranger District – Carter County, MO
Location Map – FR 4282 -Watercress Recreation Area (From intersection of Business 60 (Van Buren) and US 60 site location is approximately 1.06 miles Northwest on Bus. 60, FR 4282 & 4282A)
Site Location
Intersection
| Schedule of Items - FR 4349 Deer Leap |
| Schedule of Items |
| FR 4349 – Deer Leap |
| Description of Work - Deer Leap |
| Deer Leap Location Map |
| Schedule of Items Watercress |
| Schedule of Items |
| FR 4282 - Watercress Recreation Area |
| Description of Work - Watercress |
| Location Map - Watercress |
| Plan View - Watercress |
| Project Orientation - Watercress |