Attachment_03_-_Schedule,_DOW,_Maps.pdf
PDF 627 KB Posted
- Attached to
- Mark Twain - ERFO Work Federal contract opportunity
- Solicitation number
- 1264R419R0004
About this file
Attachment 03 - Schedule, DOW, Maps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1264R419R0004_-_Amendment_02.pdf | ||
| REVISED_16July_-_Attachment_04.pdf | ||
| 1264R419R0004_-_Amendment_01.pdf | ||
| Attachment_8_-_Technical_Proposal_Guide.docx | DOCX document | |
| 1264R419R0004.pdf | ||
| Attachment_01_-_Schedule,_DOW,_Maps.pdf | ||
| 1264R419R0004_-_BID_COPY.pdf | ||
| Attachment_06_-_2019_FP-14_Supplemental_Specs.pdf | ||
| Attachment_05_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_04_-_Schedule,_DOW,_Maps.pdf | ||
| Attachment_07_-_MO_20190001.pdf | ||
| Attachment_02_-_Schedule,_DOW,_Maps.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
FR 3104 Oak Tower
Poplar Bluff Ranger District Mark Twain National Forest
Butler County, Missouri
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
PRICE
TOTAL
15101
Mobilization
Lump Sum 1
15705 Soil Erosion Control, Sediment Log Ft 400
20404 Unclassified borrow, Compaction method A
Cubic Yard 123
25102 Placed Riprap, class 3 Ton 75
25306-1 Articulating concrete mat, 56’x16’x5.5” with barrier, CC45 or equivalent
Lump Sum 1
25306-1 Articulating concrete mat, 88’x16’x5.5” with barrier, CC45 or equivalent
Lump Sum 1
25306-1 Articulating concrete mat, 104’x16’x5.5” with barrier, CC45 or equivalent
Lump Sum 1
30202-1 Crushed aggregate grading 2” minus, Compaction method 1
Ton 150
30301-6 Roadway Reconditioning, compaction method A LS 1
Total
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
Mowing and limbing will be considered incidental to roadway excavation pay item 30301-6, roadway reconditioning.
Any necessary excavation or clearing and grubbing per the Description of Work will be incidental to pay item 30301-6, roadway reconditioning.
All items are design quantities; no payment will be made for variations within +/-15% of the design quantity, without a CO approved modification.
FR 3104 Oak Tower
MILEPOST DESCRIPTION OF WORK
0.90 Remove vegetation to open outlet ditches with appropriate construction equipment.
Begin re-establishing double ditch section maintaining the current road prism.
Clean and recondition all outlets and cut ditches no less than 1 foot deep.
Begin spreading 2” base crushed aggregate a depth of 2” and a width of 12’.
Aggregate is not to be spread over the ACM sections but will be spread in sections built back to grade in between the ACM sections.
0.94 Clean AA type outlet ditches left and right.
0.99 Clean AA type outlet ditches left and right.
Discontinue double ditch section and begin outsloped section according to road prism.
1.06 Begin pulling ditch right.
1.11 Reshape AA type outlet ditch right.
Discontinue ditch right.
1.14 Begin placement of three articulating concrete mat sections according to drawing.
Mats shall be placed in existing 20 foot corridor.
Sub-excavate rock and native material to place articulated concrete mat.
Sub-excavated grade will equal depth of concrete mat.
Two upstream rows of concrete mat will be anchored by entrenching leaving a 12-14’ driving surface.
COR will be on site to approve subgrade prior to mat placement.
Clearing to accommodate equipment will be marked on the ground with flags, stakes, etc. and approved by the COR prior to beginning.
Native material and/or fill material brought from approved outside sources will be used to build up areas to natural grade in two areas marked on the drawing.
Material will be placed according to the specifications.
Place erosion control sediment log downstream of mat location and out of the clearing area.
1.23 Clean AA type outlet ditch left.
End placement of 2” base crushed aggregate a depth of 2” and width of 12’.
End all work on FR 3104.
AutoCAD SHX Text
ACM
AutoCAD SHX Text 56' x 16'
AutoCAD SHX Text 88' x 16'
AutoCAD SHX Text 104' x 16'
AutoCAD SHX Text
ACM
AutoCAD SHX Text
ACM
AutoCAD SHX Text
MP 1.14
AutoCAD SHX Text
MP 1.18
AutoCAD SHX Text
MP 1.20
AutoCAD SHX Text
MP 1.22
AutoCAD SHX Text
MP 1.16
AutoCAD SHX Text MP are Approx.
AutoCAD SHX Text Minor shifts in position
AutoCAD SHX Text may be required at the
AutoCAD SHX Text direction of the COR
AutoCAD SHX Text 126' x 4' ditch armored
AutoCAD SHX Text w/ Class 3 riprap
AutoCAD SHX Text Length is approx.
AutoCAD SHX Text Finish grade equal to ACM grade
AutoCAD SHX Text N
AutoCAD SHX Text Not to Scale/JB
AutoCAD SHX Text
AutoCAD SHX Text Fill to Natural Grade
AutoCAD SHX Text Fill to N.
AutoCAD SHX Text Grade
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text FR 3104 Stream Crossing
AutoCAD SHX Text %%UCross Section
AutoCAD SHX Text %%UProfile
FR 3104 OAK TOWER LOCATION – POPLAR BLUFF DISTRICT
BUTLER COUNTY
From Poplar Bluff, MO: Proceed north on SH W approx. 7.7 miles to entrance of FR 3104 on left
Schedule of Items
FR 3119 Flatwoods School
Poplar Bluff Ranger District Mark Twain National Forest
Butler County, Missouri
ITEM
NO.
DESCRIPTION
PAY
EST.
QTY.
TOTAL
15101
Mobilization
Lump Sum 1
15705 Soil Erosion Control, Sediment Log Ft 250 _________ _________
25102 Placed Riprap, class 2 Ton 100 _________ _________
25306-1 Articulating concrete mat, 216’x16’x5.5” with barrier, CC45 or equivalent
Lump Sum 1 _________ _________
30202-1 Crushed aggregate grading 4” – 6” clean, Compaction method 1
Ton 10 _________ _________
30202-1 Crushed aggregate grading 2” minus, Compaction method 1
Ton 280 _________ _________
30301-6 Roadway Reconditioning, compaction method A LS 1 _________ _________
Total _________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
Mowing and limbing will be considered incidental to roadway excavation pay item 30301-6, roadway reconditioning.
Any necessary excavation or clearing and grubbing per the Description of Work will be incidental to pay item 30301-6, roadway reconditioning.
All items are design quantities; no payment will be made for variations within +/-15% of the design quantity, without a CO approved modification.
FR 3119 Flatwoods School
MILEPOST DESCRIPTION OF WORK
0.05 Begin by reshaping natural dip for positive drainage.
Place 10 tons 4-6” oversize in dip to harden surface.
Cap with 10-15 tons of 2” base to cover oversize to create a smooth surface.
Remove vegetation to open outlet ditches with appropriate construction equipment.
Begin re-establishing double ditch section having a 12’ subgrade width.
0.30 Remove vegetation to open outlet ditches with appropriate construction epuipment.
Begin re-establishing double ditch section having a 12’ subgrade width.
Clean and recondition all outlets and cut ditches no less than 1 foot deep.
Begin spreading 2” base crushed aggregate a depth of 2” and a width of 10’.
Clean inlet/outlets of all culverts to allow for proper drainage.
0.60 Begin placement of articulating concrete mat.
Mat shall be placed in existing 20 foot corridor.
Sub-excavate rock and native material to place articulated concrete mat.
Sub-excavated grade will equal depth of concrete mat.
Two upstream rows of concrete mat will be anchored by entrenching with rip rap leaving a 12-14’ driving surface.
COR will be on site to approve subgrade prior to mat placement.
Clearing to accommodate equipment will be marked on the ground with flags, stakes, etc. and approved by the COR prior to beginning.
Place erosion control sediment log downstream of mat location and out of the clearing area.
Do not place aggregate on ACM.
0.95 End all reconditioning of FR 3119.
End placement of 2” base crushed aggregate a depth of 2” and width of 10’.
FR 3119 FLATWOODS SCHOOL – POPLAR BLUFF DISTRICT
BUTLER COUNTY
From Poplar Bluff, MO: Proceed north on SH 67 approx. 10.7 miles then proceed west on CR 402 approx.
4.6 miles then proceed south on CR 408 approx. 0.45 miles to entrance of FR 3119 on left
| 3104 Schedule of Items |
| Schedule of Items |
| FR 3104 Oak Tower |
| 3104 Description of Work |
| 3104 crossing |
| Sheets and Views |
| 3104 crossing-Layout1 |
| 3104 Location Map |
| 3119 Schedule of Items |
| Schedule of Items |
| FR 3119 Flatwoods School |
| 3119 Description of Work |
| 3119 Location Map |
File details come from the government source that posted it.