Q_&_A_Support_Water_Purification_System.pdf
PDF 61 KB Posted
- Solicitation number
- 12639519R0021
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_2_12639519R0021.pdf | ||
| SF1449_12639519R0021.pdf | ||
| Statement_of_Work_Water_Purification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12639519R0021
Support Water Purification System
Questions and Answers
1. Question: Please verify supply voltage for all pumps.
Answer: The voltage is 277/480 volts.
2. Question: Does the existing epoxy skid work get removed?
Answer: Yes, the epoxy skid work gets removed
3. Question: Will the hot and cold water continue to be blended?
Answer: Yes, the hot and cold water will continue to be blended.
4. Question: Please verify the new pumps to be installed Answer: In section E (A) the listed pump should read Webtrol H35B9 or equivalent.
5. Question: Does the drain work get removed?
Answer: No the existing drain work will remain.