Q_&_A_Support_Water_Purification_System.pdf

PDF 61 KB Posted

Attached to
Building and maintenance of Water Purification System
Solicitation number
12639519R0021
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Amendment_2_12639519R0021.pdf PDF
SF1449_12639519R0021.pdf PDF
Statement_of_Work_Water_Purification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12639519R0021

Support Water Purification System

Questions and Answers

1. Question: Please verify supply voltage for all pumps.

Answer: The voltage is 277/480 volts.

2. Question: Does the existing epoxy skid work get removed?

Answer: Yes, the epoxy skid work gets removed

3. Question: Will the hot and cold water continue to be blended?

Answer: Yes, the hot and cold water will continue to be blended.

4. Question: Please verify the new pumps to be installed Answer: In section E (A) the listed pump should read Webtrol H35B9 or equivalent.

5. Question: Does the drain work get removed?

Answer: No the existing drain work will remain.