Final_Turnover-Drawings-Bldg_7_HVAC_Controls_Modifications_AG-32SC-D-17-0278.pdf
PDF 5 MB Posted
- Attached to
- Building 7 HVAC Control Mods
- Solicitation number
- 12619719B0003
About this file
drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QuestionsA0003.pdf | ||
| A0003SF30.pdf | ||
| A0002SF30.pdf | ||
| Question-3_(002).pdf | ||
| A0001SF30.pdf | ||
| SOW-Building_7_HVAC_Zone_Control_Modifications.docx | DOCX document | |
| Final_Turnover-Specifications-Bldg_7_HVAC_Controls_Modifications_AG-32SC-D-17-0278.pdf | ||
| SF1442.pdf | ||
| General_Decision_Number.docx | DOCX document | |
| 12619719B0003.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF AGRICULTURE
AGRICULTURAL RESEARCH SERVICE
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AMES, IOWA
FINAL TURNOVER
LSY PROJECT NO. 17060
USDA CONTRACT NO. AG-32SC-D-17-0278
ABBREVIATIONS, SYMBOLS & MATERIAL INDICATIONS LOCATION MAPINDEX OF DRAWINGS
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
VICINITY MAP
PROJECT AREAPROJECT AREA
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129 --
G-001
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
PROJECT COVER SHEET & INDEX
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
06/22/2018
(signature) (date)
Printed or typed name Robert T. Darnell
License number 23863
My license renewal date is December 31, 2018
Pages or sheets covered by this seal:
G-001, M-001, M-002, MD101, MD102, MD201, MD202, MH101, MH102,
MP101, MP102,M-501, M-601
GENERAL
MECHANICAL
G-001 PROJECT COVER SHEET & INDEX
M-001 MECHANICAL GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
M-002 HVAC HOT WATER HEATING ZONES - SUITES 2 THRU 5
MD101 MECHANICAL DEMOLITION PLAN - SUITES 4 & 5
MD102 MECHANICAL DEMOLITION PLAN - SUITES 2 & 3
MD201 HOT WATER HEATING PIPING DEMOLITION - MEZZANINE SUITES 4 & 5
MD202 HOT WATER HEATING PIPING DEMOLITION - MEZZANINE SUITES 2 & 3
MH101 MECHANICAL PLAN - MEZZANINE SUITES 4 & 5
MH102 MECHANICAL PLAN - MEZZANINE SUITES 2 & 3
MP101 HOT WATER HEATING PIPING PLAN - MEZZANINE SUITES 4 & 5
MP102 HOT WATER HEATING PIPING PLAN - MEZZANINE SUITES 2 & 3
M-501 MECHANICAL DETAILS, SCHEDULES, AND CONTROLS
M-601 HOT WATER HEATING PIPING DIAGRAM
GENERAL NOTES:
PIPE LINE ACCESSORIES
WITH EQUIPMENT
COMPONENTS TO BE FURNISHED
HVAC LEGEND
DETAIL/SECTION TITLE
NUMBER = DETAIL DESIGNATOR
LETTER = SECTION DESIGNATOR
DETAIL
SECTION CUT SYMBOL
SECTION
DESIGNATOR
INDICATES PERSPECTIVE
AND LIMITS OF SECTION
DETAIL/ENLARGED CALLOUT SYMBOL
INDICATES
LIMITS OF
DETAIL/SECTION
DETAIL/SECTION
DESIGNATOR
DRAWING WHERE
DETAIL/SECTION IS TAKEN
DRAWING WHERE
SECTION IS DRAWN
DRAWING WHERE
DETAIL/SECTION IS
DRAWN
CONSTRUCTION INTERFACE
EXISTING
NEW
DEMOLITION
MECHANICAL ABBREVIATIONS
GATE VALVE
OS&Y
OUTSIDE SCREW & YOKE
BUTTERFLY VALVE
CHECK VALVE
3-WAY VALVE
BALL VALVE
PDV
PUMP DISCHARGE VALVE
BALANCING VALVE
RELIEF, SAFETY OR THERMAL RELIEF VALVE
CONTROL VALVE
M
MOTORIZED CONTROL VALVE
SUCTION DIFFUSER
AV
AUTOMATIC AIR VENT ASSEMBLY
MV
MANUAL AIR VENT - SEE SPECIFICATIONS
FOR APPROPRIATE VALVE TYPE.
FLEX CONNECTION
THERMOMETER
BP
BACKFLOW PREVENTION ASSEMBLY
SELF CONTAINED PRESSURE
REDUCING (REGULATING) VALVE
PRESSURE GAUGE
Y-TYPE STRAINER
REMOVABLE CAP
REDUCER (CONCENTRIC)
REDUCER (ECCENTRIC)
UNION
BLIND FLANGE
TEST CONNECTION
M
METER
PUMP
A
M-001
A
M-001
A
M-003
HOSE GATE VALVE DRAIN
GLOBE VALVE
ANGLE VALVE
PLUG VALVE
DBB
DOUBLE BLOCK &
BLEED PLUG VALVE
IF
INSULATING FLANGE
REMOVABLE PLUG
PIPE WITH HEAT TRACE
S
STRAINER
M
CONTROL DAMPER, MOTOR
OPERATED
MANUAL BALANCE DAMPER
BD
BACKDRAFT DAMPER
AD
AD
ACCESS DOOR (AD)
ACCESS PANEL (AP)
S
AD
S
DAMPERS:
SMOKE (SD) -
FIRE SMOKE (F/SD) -
SECURITY BARS
FLEXIBLE DUCT CONNECTION
RECTANGLUAR ELBOW WITH
TURNING VANES
RECTANGULAR TEE WITH
TURNING VANES
RECTANGULAR RADIUS ELBOW
R
RISE IN RESPECT TO AIR-FLOW
D
DROP IN RESPECT TO AIR-FLOW
SQUARE OR RECTANGULAR TO
ROUND TRANSITION
SUPPLY AIR OR OUTSIDE AIR
DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST AIR DUCT SECTION
ROUND FLEXIBLE DUCT
(5'-0" MAX LENGTH)
SQUARE OR RECTANGULAR
SUPPLY DIFFUSER
RETURN AIR DIFFUSER
EXHAUST AIR DIFFUSER
T
THERMOSTAT
CO2
CARBON DIOXIDE MONITOR
H
HUMIDISTAT
LINEAR SLOT DIFFUSER
VAV-
VARIABLE AIR VOLUME
TERMINAL BOX
(3'-0")
FINNED TUBE RADIATION.
LENGTH OF ELEMENT SHOWN IN
PARENTHESIS
ESS
EMERGENCY SHUT-OFF SWITCH
M
MOTOR
CF
CEILING FAN CONTROL PANEL
NEW
EXISTING
1. LEGEND IS GENERAL IN NATURE AND MAY INDICATE MORE INFORMATION THAN IS APPLICABLE TO PROJECT. SEE PLANS FOR
SPECIFIC SYMBOLS AND ABBREVIATIONS.
2. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY
CODE.
3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
4.
5.
MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN
MECHANICAL ROOMS.
6.
LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
7.
VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.
8.
ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF DUCT, PIPE, OR PIPE INSULATION UNLESS NOTED OTHERWISE.
DUCT DIMENSIONS INDICATED REFER TO SHEET METAL DIMENSIONS. SHEET METAL SIZE SHALL BE AIR OPENING DIMENSION
PLUS THE THICKNESS OF ACOUSTICAL LINER WHERE LINER IS INSTALLED. WHERE LINER IS NOT INSTALLED, AIR OPENING SIZE
AND SHEET METAL SIZE SHALL BE THE SAME.
ALL EXISTING DUCTWORK SHOWN ON DRAWINGS IS SCHEMATIC AND ARE BASED ON EXISTING RECORD DRAWINGS PROVIDED
BY THE OWNER AND DO NOT REFLECT EXACT EXISTING CONDITIONS. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS
ON JOB SITE. CONTRACTOR SHALL REROUTE NEW WORK TO ACCOMMODATE EXACT LOCATIONS OF EXISTING UTILITIES, STUB-OUTS, AND/OR CONNECTIONS.
IA INSTRUMENT AIR
INVT EL INVERT ELEVATION
L LOUVER
LR LONG RADIUS
MA MIXED AIR
MJ MECHANICAL JOINT
MW MAKE-UP WATER (AFTER BACKFLOW
PREVENTER)
MW MAKE-UP WATER (AFTER BACKFLOW
PREVENTER)
NC NORMALLY CLOSED (FAIL POSITION)
NG NATURAL GAS
NO NORMALLY OPEN (FAIL POSITION)
OA OUTSIDE AIR
OB OPPOSED BLADE
OD OVERFLOW DRAIN
PB PARALLEL BLADE
PCR PUMP CONDENSATE RETURN
PCW PROCESS COLD WATER
PFX PLATE AND FRAME HEAT EXCHANGER
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
R RELIEF LINE
RA RETURN AIR
RED REDUCER-REDUCING
RG REFRIGERANT HOT GAS DISCHARGE
RL EFRIGERANT LIQUID
RMJ RESTRAINED MECHANICAL JOINT
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SCH SCHEDULE
SCR SPRING RETURN CLOSED
SHR SHORT RADIUS
SO SLIP ON
SP STATIC PRESSURE SENSOR
SR SUPPLY REGISTER
ST STEAM TRAP
STM STEAM
SW SOCKET WELD
TA TRANSFER AIR
TOD TOP OF DUCT
TOS TOP OF STEEL
UH UNIT HEATER
V VENT
12"Ø ROUND DUCT DIMENSION
24x1 RECTANGULAR DUCT DIMENSION (INCHES)
24x12 RECTANGULAR DUCT DIMENSION (INCHES)
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ARF ABOVE RAISED FLOOR
ARV AIR RELEASE VALVE
BBO BOILER BLOW-OFF
BLWDN BLOWDOWN
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BP BOOSTER PUMP
BPP BOILER PRIMARY PUMP
BW BUTT WELD
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CL CENTER LINE OF PIPE ELEVATION
CONC CONCENTRIC
COND COOLING COIL CONDENSATE DRAIN
CR CONDENSATE RETURN
CT CHEMICAL TREATMENT
CTB COOLING TOWER BLOWDOWN
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
D DRAIN
DN DOWN
DRG DIFFUSER, REGISTER, GRILLE
EA EXHAUST AIR
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELL ELBOW
ER EXHAUST REGISTER
ET EXPANSION TANK
EXIST EXISTING
F FAN
FCU FAN COIL UNIT
FD FEEDWATER
FF FLAT FACED
FO FLAT OVAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
HVAC HEATING, VENTILATION, AIR CONDITIONING
HWP HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129 --
M-001
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
MECHANICAL GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
CONSTRUCTION ACTIVITIES SHALL WORK AROUND THE USDA ANIMAL PROJECT SCHEDULE FOR ANY WORK ASSOCIATED WITH THIS PROJECT.
ONLY ONE SUITE IS ALLOWED TO BE TAKEN DOWN AT ANY GIVEN TIME FOR EXTENDED SHUT DOWNS. SYSTEMS WILL BE SHUT DOWN FOR DUCTWORK
TIE- INS. CONTRACTOR SHALL COORDINATE ALL WORK WITH USDA, AND PROVIDE A PROPOSED SCHEDULE TO USDA FOR REVIEW PRIOR TO ANY
WORK BEGINNING ON SITE.
BEFORE ANY CONSTRUCTION, MEASURE AND RECORD THE EXISTING AIRFLOW RATE OF EACH SUPPLY AIR OUTLET AND EACH EXHAUST AIR INTAKE.
ALSO MEASURE AND RECORD THE COINCIDENT ROOM PRESSURE. RECORD BOTH THE ACTUAL VALUES AND THE SETPOINTS. THE INTENT IS TO
RETURN THE FACILITY POST-CONSTRUCTION TO THE ORIGINAL BALANCED AIRFLOW SETPOINT AND ROOM PRESSURE SETPOINT.
NEW PIPING TIE-INS SHALL BE HOT-TAPPED INTO MAINS WITH SHUT-OFF VALVES TO MINIMIZE SYSTEM SHUT DOWNS.
DEMOLITION OF EXISTING PIPING TO COILS THAT WILL BE REMOVED WILL REQUIRE A SYSTEM SHUT DOWN AND DRAINING. CONTRACTOR SHALL
COORDINATE THIS WORK TO BE COMPLETED AT ONCE, AND DURING A TIME WHEN REHEAT IS NOT REQUIRED. CONTRACTOR SHALL COORDINATE ALL
WORK WITH USDA, AND PROVIDE A PROPOSED SCHEDULE TO USDA FOR REVIEW PRIOR TO ANY WORK BEGINNING ON SITE.
UPON COMPLETION OF PIPING AND COIL INSTALLATION, CONTRACTOR SHALL FLUSH NEW PIPING AND COILS. CONTRACTOR SHALL PROVIDE MEANS
TO DRAIN PIPING TO THE EXTERIOR, OR OTHER SUITABLE LOCATION, AS APPROVED BY OWNER. THIS WORK SHALL BE COORDINATED WITH OWNER
TO DETERMINE AN ACCEPTABLE LOCATION FOR DRAINAGE.
CONSTRUCTION PHASING:
1.
2.
3.
4.
5.
SUITE 5
ZONE DC-5-5A
70°F (ADJ)
SUITE 5
ZONE DC-5-5B
70°F (ADJ)
SUITE 5
ZONE DC-5-1A
70°F (ADJ)
SUITE 5
ZONE DC-5-1B
70°F (ADJ)
SUITE 5
ZONE DC-5-1C
70°F (ADJ)
SUITE 5
ZONE DC-5-1D
70°F (ADJ)
SUITE 4
ZONE DC-4-9A
70°F (ADJ)
SUITE 4
ZONE DC-4-5A
90°F (ADJ)
SUITE 3
ZONE DC-3-1A
90°F (ADJ)
SUITE 3
ZONE DC-3-5A
70°F (ADJ)
SUITE 2
ZONE DC-2-2A
70°F (ADJ)
SUITE 2
ZONE DC-2-2E
70°F (ADJ)
SUITE 4
ZONE DC-4-2
90°F (ADJ)
SUITE 4
ZONE DC-4-9B
70°F (ADJ)
SUITE 4
ZONE DC-4-9C
70°F (ADJ)
SUITE 4
ZONE DC-4-9D
70°F (ADJ)
SUITE 4
ZONE DC-4-5B
90°F (ADJ)
SUITE 4
ZONE DC-4-5C
90°F (ADJ)
SUITE 4
ZONE DC-4-5D
90°F (ADJ)
SUITE 3
ZONE DC-3-1B
90°F (ADJ)
SUITE 3
ZONE DC-3-1C
90°F (ADJ)
SUITE 3
ZONE DC-3-1D
90°F (ADJ)
SUITE 3
ZONE DC-3-5B
70°F (ADJ)
SUITE 2
ZONE DC-2-2B
70°F (ADJ)
SUITE 2
ZONE DC-2-2C
70°F (ADJ)
SUITE 2
ZONE DC-2-2D
70°F (ADJ)
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
M002
HOT WATER HEATING ZONES
24'
SCALE IN FEET
0 8' 16'
N O
R T
H
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
KEYED NOTES:
EXISTING TEMPERATURE SENSOR IN EXHAUST
AIR DUCT SHALL REMAIN AND SERVE NEW
ZONE DUCT COIL.
PROVIDE NEW TEMPERATURE SENSOR IN
EXHAUST AIR DUCT ABOVE TO SERVE NEW
ZONE DUCT COIL. TYPICAL UNLESS NOTED
OTHERWISE.
(TYP)
(TYP)
M-002
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
HVAC HOT WATER HEATING ZONES - SUITES 2 THRU 5
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MD101
MECHANICAL DEMOLITION PLAN
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. FOR PIPING DEMOLITION AT DUCT COILS, SEE
MD201.
KEYED NOTES:
DEMOLISH EXISTING HOT WATER DUCT COIL
(DC-X) AND DUCTWORK TRANSITIONS TO COIL.
PREPARE DUCTS FOR NEW WORK. SEE MH101.
DEMOLISH EXISTING DUCT AND CAP.
EXISTING DUCTS & FITTINGS TO BE RELOCATED
FOR NEW WORK. SEE MH101.
EXISTING TEMPERATURE SENSOR IN EXHAUST
AIR DUCT TO REMAIN TO SERVE NEW DUCT
COIL.
EXISTING SA VERTICAL DUCTWORK DOWN THRU
FLOOR TO REMAIN. TEMPORARILY CAP FOR
CONNECTION TO NEW WORK. SEE MH101.
DEMOLISH EXISTING COIL AND REPLACE WITH
NEW IN SAME LOCATION.
EXISTING DUCT IN THIS LOCATION SHALL BE
REMOVED TO ALLOW FOR INSTALLATION OF
NEW DUCT COIL. SEE MH101.
DEMOLISH TO ALLOW FOR RELOCATION OF
EXISTING SA DUCT. SEE MH101.
5 5 5
5 5 5
5 5 5
MD101
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
MECHANICAL DEMOLITION, MEZZANINE - SUITES 4 & 5
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MD102
MECHANICAL DEMOLITION PLAN
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. FOR PIPING DEMOLITION AT DUCT COILS, SEE
MD202.
KEYED NOTES:
DEMOLISH EXISTING HOT WATER DUCT COIL
(DC-X) AND DUCTWORK TRANSITIONS TO COIL.
PREPARE DUCTS FOR NEW WORK. SEE MH102.
DEMOLISH EXISTING DUCT AND CAP.
EXISTING DUCT TO BE RELOCATED FOR NEW
WORK. SEE MH102.
EXISTING TEMPERATURE SENSOR IN
EXHAUST AIR DUCT TO REMAIN AND SERVE
NEW DUCT COIL.
EXISTING SA VERTICAL DUCTWORK DOWN
THRU FLOOR TO REMAIN. TEMPORARILY CAP
FOR CONNECTION TO NEW WORK. SEE MH102.
EXISTING DUCT IN THIS LOCATION SHALL BE
REMOVED TO ALLOW FOR INSTALLATION OF
NEW DUCT COIL. SEE MH102.
3 3
5 5 5
MD102
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
MECHANICAL DEMOLITION, MEZZANINE - SUITES 2 & 3
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MD201
HOT WATER HEATING
PIPING DEMOLITION PLAN
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. FOR DUCT DEMOLITION AT DUCT COILS, SEE
MD101.
4. COILS BEING REMOVED SHALL BE ISOLATED
AND DRAINED. SEE M-001, AND SPECIFICATION
23 21 13 FOR REQUIREMENTS.
KEYED NOTES:
DEMOLISH EXISTING HOT WATER DUCT COIL
(DC-X), ASSOCIATED PIPING, AND CONTROL
VALVES. VALVE AND CAP FOR CONNECTION
TO NEW WORK. SEE MP101 FOR NEW WORK.
DEMOLISH EXISTING HOT WATER DUCT COIL
(DC-X), ASSOCIATED PIPING, AND CONTROL
VALVES. CAP AT EXISTING PIPING MAIN.
SALVAGE EXISTING CONTROL VALVES FOR
OWNER. SEE MP101 FOR NEW WORK.
COIL WILL BE REPLACED IN SAME LOCATION
WITH NEW PIPING CONNECTIONS TO MAIN.
MD201
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
HVAC HOT WATER HEATING PIPING DEMOLITION, MEZZANINE - SUITES 4 & 5
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MD202
HOT WATER HEATING
PIPING DEMOLITION PLAN
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
KEYED NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. FOR DUCT DEMOLITION AT DUCT COILS, SEE
MD102.
4. COILS BEING REMOVED SHALL BE ISOLATED
AND DRAINED. SEE M-001, AND SPECIFICATION
23 21 13 FOR REQUIREMENTS.
5.
DEMOLISH EXISTING HOT WATER DUCT COIL
(DC-X), ASSOCIATED PIPING, AND CONTROL
VALVES. VALVE AND CAP FOR CONNECTION
TO NEW WORK. SEE MP102 FOR NEW WORK.
DEMOLISH EXISTING HOT WATER DUCT COIL
(DC-X), ASSOCIATED PIPING, AND CONTROL
VALVES. CAP AT EXISTING PIPING MAIN.
SALVAGE EXISTING CONTROL VALVES FOR
OWNER. SEE MP102 FOR NEW WORK.
MD202
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
HVAC HOT WATER HEATING PIPING DEMOLITION, MEZZANINE - SUITES 2 & 3
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
T
TTT
T T T
T T
T
T T T
36x18
36x18
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MH101
MECHANICAL PLAN - MEZZANINE
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. FOR PIPING CONNECTIONS TO DUCT COIL, SEE
MP101 AND DETAIL ON M-501.
4. VERIFY DUCTWORK LAYOUT WITH EXISTING
CONDITIONS PRIOR TO FABRICATION TO AVOID
CONFLICT WITH EXISTING UTILITIES.
5. SEE M-002 FOR DUCT COIL ZONES AND SPACE
TEMPERATURE SETPOINTS.
KEYED NOTES:
PROVIDE DUCT TRANSITION AT INLET AND
OUTLET OF NEW DUCT COIL. SEE M-501 FOR
COIL SIZES AND INSTALLATION DETAIL.
RELOCATED EXISTING SA DUCT. PROVIDE
NEW DUCT TO RECONNECT TO EXISTING
VERTICAL SA DOWN THROUGH FLOOR.
PROVIDE NEW TEMPERATURE SENSOR IN
EXISTING EA DUCT. SEE M-002.
EXISTING TEMPERATURE SENSOR IN DUCT
TO REMAIN. RE-LABEL SENSOR TO MATCH
NEW DUCT COIL EQUIPMENT TAG.
CONNECT THE RELOCATED SA DUCT TO THE
EXISTING DUCT MAIN HERE.
DC-5-5A
DC-5-5A
DC-5-1A
DC-5-1B
DC-5-1D
DC-4-9B
DC-4-9A
DC-4-9C
DC-4-9D
DC-4-2
DC-4-5A
DC-4-5B DC-4-5C
DC-4-5D
DC-5-1C
1 1
2 2
2 2
3 3 3
18x8 SA
(TYP)
18x8 SA
(TYP)
20x8 SA
(TYP)
30x18 x
MH101
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
MECHANICAL PLAN, MEZZANINE - SUITES 4 & 5
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
T T
T
T T T
T
T
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MH102
MECHANICAL PLAN - MEZZANINE
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
KEYED NOTES:
DC-3-1B
DC-3-1A
DC-3-1C
DC-3-1D
DC-3-5A
DC-3-5B
DC-2-2A
DC-2-2E
DC-2-2B
DC-2-2C
DC-2-2D
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. FOR PIPING CONNECTIONS TO DUCT COIL, SEE
MP102 AND DETAIL ON M-501.
4. VERIFY DUCTWORK LAYOUT WITH EXISTING
CONDITIONS PRIOR TO FABRICATION TO AVOID
CONFLICT WITH EXISTING UTILITIES.
5. SEE M-002 FOR DUCT COIL ZONES AND SPACE
TEMPERATURE SETPOINTS.
PROVIDE DUCT TRANSITION AT INLET AND
OUTLET OF NEW DUCT COIL. SEE M-501 FOR
COIL SIZES AND INSTALLATION DETAIL.
RELOCATED EXISTING SA DUCT. PROVIDE
NEW DUCT TO RECONNECT TO EXISTING
VERTICAL SA DOWN THROUGH FLOOR.
PROVIDE NEW TEMPERATURE SENSOR IN
EXISTING EA DUCT. SEE M-002.
EXISTING TEMPERATURE SENSOR IN DUCT
TO REMAIN. RE-LABEL SENSOR TO MATCH
NEW DUCT COIL EQUIPMENT TAG.
CONNECT THE RELOCATED SA DUCT TO THE
EXISTING DUCT MAIN HERE.
CONTRACTOR SHALL INSTALL DC-2-2A IN
LOCATION THAT IS NOT IN CONFLICT WITH
EXISTING CABLE TRAY AND SHALL PROVIDE
EASY ACCESS FOR MAINTENANCE TO COIL
AND HYDRONIC ACCESSORIES.
20x8 SA
(TYP)
18x8 SA
(TYP)
42x24 x
MH102
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
MECHANICAL PLAN, MEZZANINE - SUITES 2 & 3
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
1 1/2" HWS/R
1" HWS/R
1" HWS/R
1 1/2" HWS/R
1"
1 1/2"
3/4"
3/4" 3/4"
3/4"1"
3/4"
1"
3/4" 3/4"
1" 3/4"
3/4"
3/4"
3/4"
3/4"
1 1/2" 1"
1 1/2"
HWS/R
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MP101
PIPING PLAN - MEZZANINE
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. ROUTE NEW HWS & HWR PIPING AS HIGH AS
POSSIBLE TO MAINTAIN SERVICE
ACCESS/CLEARANCE FOR SERVICE CORRIDORS
THROUGHOUT SPACE.
4. SEE M-501 FOR DUCT COIL PIPING DETAIL.
5. NEW COILS AND PIPING SHALL BE CLEANED AND
FLUSHED TO THE OUTDOORS. SEE M-001, AND
SPECIFICATION SECTION 23 21 13 FOR
REQUIREMENTS.
6. SEE M-601 FOR VALVES LOCATIONS.
DC-5-5A
DC-5-5A
DC-5-1A
DC-5-1B
DC-5-1D
DC-4-9BDC-4-9A
DC-4-9C DC-4-9D
DC-4-2
DC-4-5A
DC-4-5B
DC-4-5C
DC-4-5D
DC-5-1C
MP101
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
HOT WATER HEATING PIPING PLAN, MEZZANINE - SUITES 4 & 5
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
COORDINATE WITH EXISTING
PIPING TO MAINTAIN
REQUIRED CLEARANCES
AND ACCESS (TYP)
KEYED NOTES:
INSTALL NEW 3-WAY CONTROL VALVE
UPSTREAM OF DC-5-1 DUCT COILS.
1 1/2" HWS/R
1 1/2"
3/4"
3/4" 3/4"
3/4"1"
1"
1 1/2" HWS/R
1"
1"
1" 3/4"
3/4" 3/4"
1 1/2"
1 1/2"
3/4"
U
S
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
MP102
PIPING PLAN - MEZZANINE
N O
R T
H
16'8'4'0
SCALE IN FEET
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. ROUTE NEW HWS & HWR PIPING AS HIGH AS
POSSIBLE TO MAINTAIN SERVICE
ACCESS/CLEARANCE FOR SERVICE CORRIDORS
THROUGHOUT SPACE.
4. SEE M-501 FOR DUCT COIL PIPING DETAILS.
5. NEW COILS AND PIPING SHALL BE CLEANED
AND FLUSHED TO THE OUTDOORS. SEE M-001,
AND SPECIFICATION SECTION 23 21 13 FOR
REQUIREMENTS.
6. SEE M-601 FOR VALVE LOCATIONS.
DC-3-1B
DC-3-1A
DC-3-1D
DC-3-5A
DC-3-5B
DC-2-2A
DC-2-2E
DC-2-2B
DC-2-2C
DC-2-2D
DC-3-1C
MP102
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
HOT WATER HEATING PIPING PLAN, MEZZANINE - SUITES 2 & 3
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
COORDINATE WITH EXISTING
PIPING TO MAINTAIN
REQUIRED CLEARANCES
AND ACCESS (TYP)
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
M501
DUCT HEATING COIL DETAIL
M501
DUCT HEATING COIL PIPING
WITH 2-WAY VALVE DETAIL
M-501
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
MECHANICAL DETAILS, SCHEDULES, AND CONTROLS
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
M501
TYPICAL CLEVIS HANGER DETAIL
D
A
A-E FIRM USDA
NO. DATE BY DESCRIPTION
REVISIONS
Agricultural
Research
Service
DWG. NO.
SHEET OF
PROJECT MANAGER EPM
DESIGNER
CHECKED BY
DRAWN BY REAL PROPERTY
SAFETY & HEALTH
PPM
SPECIFICATION NO.
DATE
8201 NORMAN CENTER DRIVE
SUITE #300
BLOOMINGTON, MN 55437
952-656-6003
PROJECT #103129
M601
HOT WATER HEATING DIAGRAM
ISOLATION
VALVE (TYP)
CAP EXISTING
PIPE (TYP)
M-601
12/08/17
R. PEARSON
R. DARNELL
-R. PEARSON
B. A'HEARNJ. LOUVIERE
HOT WATER HEATING PIPING DIAGRAM
NCAH BUILDING 7
HVAC ZONE CONTROL MODIFICATIONS
AG-32SC-D-17-0278
FINAL TURNOVERRLP06/22/18
GENERAL NOTES:
1. FOR MECHANICAL GENERAL NOTES, LEGENDS,
AND ABBREVIATIONS, SEE M-001.
2. FOR CONSTRUCTION PHASING REQUIREMENTS,
SEE M-001.
3. SEE M-501 FOR DUCT COIL PIPING DETAIL.
4. NEW COILS AND PIPING SHALL BE CLEANED AND
FLUSHED TO THE OUTDOORS. SEE M-001, AND
SPECIFICATION SECTION 23 21 13 FOR
REQUIREMENTS.
KEYED NOTES:
INSTALL NEW 1" 3-WAY CONTROL VALVE IN
PIPING UPSTREAM OF DC-5-1 DUCT COILS
(8.8 GPM)
| 103129M001-M001 |
| Sheets and Views |
| 103129M001-M001 |
| 103129M002-Layout1 |
| Sheets and Views |
| 103129M002-Layout1 |
| 103129MD101-Layout1 |
| Sheets and Views |
| 103129MD101-Layout1 |
| 103129MD102-Layout1 |
| Sheets and Views |
| 103129MD102-Layout1 |
| 103129MD201-Layout1 |
| Sheets and Views |
| 103129MD201-Layout1 |
| 103129MD202-Layout1 |
| Sheets and Views |
| 103129MD202-Layout1 |
| 103129MH101-Layout1 |
| Sheets and Views |
| 103129MH101-Layout1 |
| 103129MH102-Layout1 |
| Sheets and Views |
| 103129MH102-Layout1 |
| 103129MP101-Layout1 |
| Sheets and Views |
| 103129MP101-Layout1 |
| 103129MP102-Layout1 |
| Sheets and Views |
| 103129MP102-Layout1 |
| 103129M501-Layout1 |
| Sheets and Views |
| 103129M501-Layout1 |
| 103129M601-Layout1 |
| Sheets and Views |
| 103129M601-Layout1 |
| 2018-06-27T14:48:26-0500 | |
| Darnell, Rober |
| 2018-06-27T14:48:52-0500 | |
| Darnell, Rober |
File details come from the government source that posted it.