QuestionsA0003.pdf

PDF 679 KB Posted

Attached to
Building 7 HVAC Control Mods Federal contract opportunity
Solicitation number
12619719B0003
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Veterinary Services

About this file

Q&As

View the file

Other files for this federal contract opportunity

Other files attached to Building 7 HVAC Control Mods, newest first.
File Type Posted
A0003SF30.pdf PDF
A0002SF30.pdf PDF
Question-3_(002).pdf PDF
A0001SF30.pdf PDF
Final_Turnover-Specifications-Bldg_7_HVAC_Controls_Modifications_AG-32SC-D-17-0278.pdf PDF
SF1442.pdf PDF
General_Decision_Number.docx DOCX document
SOW-Building_7_HVAC_Zone_Control_Modifications.docx DOCX document
Final_Turnover-Drawings-Bldg_7_HVAC_Controls_Modifications_AG-32SC-D-17-0278.pdf PDF
12619719B0003.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 12619719B0003; Building 7 HVAC Control Mods.

Question 1:

Issue: Detail 2 on M-501 Duct Heating Coil Piping with 2-way Control Valve Detail This detail shows Temperature and Pressure Gauges for each coil connection. This isn't typical for all the coils. Often these gauges are on mains or branch lines, but not duct mounted reheat coils. Can the gauges be omitted and can valve packages be used for this installation?

The valve package (attached) have test plugs for taking temperature and pressure readings. Please advise.

Question 2:

Section 232113 Hydronic Piping – Part 2 Products says copper and Part 3 Execution says Schedule 40 steel, which is correct?

No

Copper with dielectric fitting if transition to existing steel.