CombinedSynopsisSolicitationCommServices_Bldg_Demo.docx
DOCX document 99 KB Posted
- Attached to
- Building Demolition on the Midewin NTP
- Solicitation number
- 1256A118R0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pictures.pdf | ||
| Building_demolition_pre_bid_attendees.pdf | ||
| 1256A118R0004_Amendment_1.rtf | RTF text file | |
| Site_Visit_NotesGroup9Demol.docx | DOCX document | |
| Wage_Determination.pdf | ||
| Att_B_Soil_Stockpile_Location.jpg | JPG image | |
| Att_C_asbestos-form-combined.pdf | ||
| Att_A_Group_9_Location.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1256A118R0004 Combined Synopsis/Solicitation Solicitation Number1256A118R0004 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 and 13.5, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
This solicitation is issued as an RFP. The documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-98.
This procurement is set aside for Small Business. The NAICS code is 238910 and the Small Business Size Standard is $15 Million.
Description of Requirement:
| Item No./Title |
| Description |
| Qty |
| 1. Asbestos Analysis/Certification |
| Provide ACM inspection performed and signed by an Illinois Licenced ACM inspector to satisfy State of Illinois requirements prior to demolition. |
| 1 each |
2. Demolition Of former Administation Buildings numbered 12A, 12B, 12C, 12D, 12E, 12F
Remove and dispose/recycle off-site complete structures (including all doors, windows, frames, fixtures, and furnishings) and foundation two (2) feet below surrounding ground level; final grade the work area.
Include removal and disposal of ACM ROOFING, FLOOR TILE and other ACM identified by the inspection in line item 1 with total costs.
Footprint of buildings total approx. 43,000 square feet
| 3. Transport topsoil |
| Load, haul, and spread topsoil from Midewin stockpile located 5 miles from the site. |
| 1,730 tons |
| 4. Seed & Mulch work area (contractor shall supply seed and mulch |
| Apply pasture grass mix as designated by Midewin NTP at the minimal of 50 lbs./acre and mulch with straw or other Midewin NTP approved mulch |
| All disturbed areas |
GENERAL SPECIFICATIONS
SCOPE OF CONTRACT
Provide labor, materials, and equipment required to remove the following items on the Midewin National Tallgrass Prairie.
Mandatory Field Inspection: A Field Inspection date has been scheduled for the following date and place:
| Location: | Midewin National Tallgrass Prairie Office | |
| 30239 S. State Route 53 | ||
| Wilmington, Il 60481 | ||
| Date: | August 9, 2018 | |
| Time: | 9:00 AM CDT |
Task will include, but not be limited to, the following items:
Item 1. Asbestos Analysis/Certification
Provide ACM inspection performed and signed by an Illinois Licenced ACM inspector to satisfy State of Illinois EPA requirements prior to demolition. A copy of the EPA form is attached for reference as Attachment C.
This inspection is intended to identify all possible ACM associated with this project in order to determine the proper method of removal and disposal. At a minimum this will include the roofing and floor tile located in the buildings.
NOTE: In addition to the ACM, its should be noted that the peeling paint within the building should be considered to be lead based paint, based on the age of the buildings. It is the responsibility of the contractor to handle this material in accordance with all associated regulations where applicable.
ACM may include roofing, siding, floor tile, mastic, or other building materails.
Include only the cost for inspection, analysis, and reports in Item 1
Item 2 - Removal of misc. concrete, brick, steel, block frame buildings including slab/foundation removal:
Site Clearing and Preparation: All trees and shrubs around the perimeter of the buildings shall be removed and piled on the gravel pad east of the buildings.
Remove and dispose/recycle offsite concrete structures, steel trusses, concrete block wood structures, concrete floors, concrete foundation walls, concrete pipe trenches,and misc. concrete slabs and walks associated with the following buildings in Group 9, ADMINISTRATION BUILDINGS:
| ID |
| Name |
| FOOTPRINT SQFT |
| 9-12A |
| ADMINISTRATION BLDG |
| 9,604 |
| 9-12B |
| ADMINISTRATION BLDG |
| 9,604 |
| 9-12C |
| ADMINISTRATION BLDG |
| 9,604 |
| 9-12D |
| ADMINISTRATION BLDG |
| 4,525 |
| 9-12E |
| ADMINISTRATION BLDG |
| 5,400 |
| 9-12F |
| ADMINISTRATION BLDG |
| 4,525 |
| TOTAL 6 bldgs. |
| 43,262 |
Remove and dispose off-site all identified ACM materials for all of the above listed buildings and structures in Group 9 per appropriate federal, local and state regulations. Because there is not a final asbestos report available at this time, please include the following in your costs for ACM removal:
ACM Transite Roof - Entire roof covering all the buildings, contractor is responsible for field measurements taking into the slope of the roof, any overlap in panels, and including transite roof caps.
ACM Floor Tile – Include 90% of the total 43,262 square feet of building footprint as being covered with ACM floor tile. The majority of the tile is located in large open rooms that were former cafeterias, large meeting rooms, and offices. A field visit is mandatory in order to properly estimate the effort required to properly remove and dispose the tile. All vendors shall use a total of 38,000 square feet of ACM tile to be removed in their proposals.
Lead Paint – Due to the age of the structures all painted surfaces can be assumed to contain lead paint.
All contents of the building including but not limited to boilers, tanks, piping, ductwork, walkways and catwalks, windows, doors, frames, fixtures, furnishings, and debris are to be removed and disposed/recycled offsite.
Buildings are to be removed entirely, extending to an elevation equal to two feet below surrounding grade. If the structure extends deeper than two feet, any concrete the contractor chooses to leave in place must be sufficiently broken so as to allow water to percolate through it at a rate approximately equal to the rate of the surrounding soil. Vertical foundation walls as well as basement floors must be cracked and/or punctured to allow water to percolate through the concrete. Forest Service COR will determine if concrete is sufficiently broken. The contractor may elect to remove concrete below the two foot level at his own expense if so inclined to expedite the work.
In addition to any conrete in the ground the contractor must also remove all gravel or sand bedding found beneath the structures that is within two feet of the surface as compared to surrounding final grade. The top two feet of fill over the demolished structures shall be topsoil free of excessive gravel, rock, debris, etc. See Item 3 below for more details about topsoil.
It the responsibility of the contractor to divert as much waste as possible away from the landfill. This shall be accomplished by adhering to the methods descrobed in the Demolition Material Reuse/Recycle and Disposal matrix included below.
The following is offered to clarify the issue of free tipping fees at the Prairie View Landfill (PVL) located immediately south of the MNTP: (This is provided for information only and is subject to change and is not within the control of the USDA Forest Service it only represents the current situation at the Prairie View Landfill.
· PVL is accepting ACM. It is handled differently than other wastes. PVL can't handle huge amounts per day due to the way they are required to bury ACM. There are also placarding, handling, and paperwork differences. Contractor should contact PVL scale house for details.
· Miscellaneous debris such as hard to handle utility poles, RR ties, etc. need to be cut into 3 foot lengths.
· Concrete is a recyclable material and is generally not accepted at the PVL. Contractor will need to find a concrete recycle facility and haul material to the facility as well as pay for any processing fees unless otherwise agreed upon with PVL.
· When PVL goes into a new cell (first layer over plastic liner), they will not be able to accept certain materials, it it up to the contractor to coordinate with PVL.
Item 3 – Transporting Topsoil
It is anticipated that not enough topsoil can re-used and recountoured on site to cover all of the removed structures. A secondary source of topsoil is available on Midewin’s west side. The source is located 5 miles from the demolition site across local highway and internal Midewin roads as shown on the attached drawing labelled Attachment B, “Soil Stockpile Location”. The contractor would be required to provide a loader at the stockpile and use street legal trucks to transport the soil back to the demolition site. Due to the fact that Midewin is closed to all public motorized use, the haul route will pass through 3 gates that must remain closed or manned with a gate keeper during any hauling operations.
Using the gross footprint of the buildings and assuming a maximum of two feet of additional soil would be required to cover the footprint, the amount of soil to be transported would be 1,730 tons. Please include the cost to transport 1,730 tons of Midewin supplied topsoil to be spread at the demolition site.
Item 4 - Seed & Mulch work area:
The entire work are area shall be seeded with the following seed mixture:
spring oats - 25 lbs/acre perennial ryegrass - 10 lbs acre redtop - 5 lbs acre bluegrass - 5 lbs acre Hungarian (smooth) brome grass - 5 lbs acre No fertilizer.
Seeded area shall be covered with straw or other approved mulch.
LOCATION AND DESCRIPTION
Location – Group 9 is located ¼ mile east of Route 53, just north of Prairie Creek, on the Midewin National Tallgrass Prairie, in Wilmington, IL. A map depicting the area is included as Attachment A.
TECHNICAL REQUIREMENTS
A. Equipment Requirements
Equipment shall be furnished on a fully operated basis, of modern design, and in good operating condition, with a competent qualified operator. Exhaust stacks on all engines, except those with exhaust-driven turbo-chargers, shall be equipped with spark arresters that will prevent the expulsion of sparks from the engine into the atmosphere. All fuel, supplies, repairs, and incidentals shall be furnished by the Contractor.
1. Inspection of Equipment
Equipment will be inspected at the time it is delivered to the job. Equipment shall be clean, such as equipment that has been through a truck wash and not carrying invasive plants or seeds. Equipment that does not meet contract specifications may be rejected. Rejected equipment will be replaced or the deficiencies corrected within four (4) calendar days after notice of rejection. If the equipment cannot perform on site it may also be removed or replaced.
2. Operator
The Contractor shall furnish a qualified, experienced and competent operator, capable of operating the equipment in terrain similar to that where the work is to be performed. The Government may require the replacement of an operator who is considered incompetent, careless, or otherwise objectionable. Operator shall wear OSHA approved safety gear while operating equipment and comply with the Occupational Safety and Health Act of 1970 (as amended).
B. Safety
The contractor and its employees and subcontractors shall comply with all State and local safety requirements and will be thoroughly familiar with the Forest Service Safety Code for work of this type. This code is available for review at the closest Forest Service office. Protective devices, including but not restricted to hard hats, shall be worn. All efforts shall be made to protect traffic and the contractor vehicles shall stay within the appropriate speed in the areas but not to exceed thirty miles per hour (30 mph). When working, the contractor shall make readily available spill cleanup materials and any spill greater than one (1) pint shall be immediately reported to the Contracting Officer’s Representative (COR).
Contractors must avoid remaining contaminated Army land in or near the work area, and must be aware of the potential for discovery of CERCLA wastes, TSCA (PCB) equipment, or remnant ordnance materials (Munitions and Explosives of Concern (MEC)). Contractors shall notify the Midewin Safety Officer and COR or Inspector of any discovered suspicious material, equipment or items encountered during work.
PERFORMANCE REQUIREMENTS
Contractor is responsible for any notifications, licenses or permits required to perform this work.
All material disposals shall be in accordance with all applicable federal, state and local laws/regulations. Reuse/Recycle opportunities are to be maximized. Contractor shall provide all weigh tickets or other evidence of proper disposal in a timely manner but no later than with invoice(s).
B. Performance Schedule
The overall performance period for completion of the task is 120 days. Work may begin on or after September 1, 2018.
C. Protection of Resources & Reparation of Any Damages
Contractor shall confine operations to the designated work area, follow designated travel lanes and use existing roads, railbeds, and parking areas unless approved by a FS representative. Contractor shall avoid entering any areas enclosed by orange construction fencing, or bamboo stakes and flagging. Any soil or other resource damage (e.g. rutting deeper than six inches, tracking, etc.) shall be mitigated by the contractor prior to completion of the work.
The Contractor will ensure spill cleanup materials will be available on each project at all times on the Prairie. Any spill greater than one (1) pint must be immediately reported to the COR or Inspector. Contractor personnel must have training to ensure they are qualified to identify such releases and are competent to provide proper cleanup and reporting. All spilled materials and impacted soils will be removed and properly disposed as necessary.
D. Performance Measures for Completion of Contract
The following table describes how the FS will evaluate the completion of the demolition tasks:
| REQUIREMENT |
| TASKS/CRITICAL |
SUB-TASKS
QUALITY
STDS
| AQL |
| METHOD OF MONITORING |
1.
Demolition
1.a. Superstructure
| Take down superstructure in a safe, environmentally compliant, and efficient manner. |
| Superstructure is completely dismantled or disconnected from any foundation in accordance w/CSI and any other applicable State, local or industry standards. |
| 100% |
| Visual 100% |
1.b. Foundation (no basement)
| Break up top 2 feet of foundation materials and remove as needed. Use native fill materials from site surrounding the work site as approved by the FS. |
| All foundation materials will be removed to a level of 2’ below finished grade and covered with fill. No foundation material, including broken pieces, shall remain within the top two feet of finish grade. |
| 100% |
| Visual 100% |
1.c. Foundation (with basement)
| Puncture, crack, break, etc. basement floors sufficiently to allow water to drain through the slab. Break up top 2 feet of any foundation and push into basement. Fill remaining basement with broken concrete, rock, gravel, soil, or other FS approved materials (no general demolition debris ). |
| All foundation materials will be removed to a level of 2’ below finished grade and covered with fill. No foundation material, including broken pieces, shall remain within the top two feet of finish grade. |
| 100% |
| Visual 100% |
Removal:
Gather Segregate Load/haul Staging/stockpiling
Gather all materials from demolition unless otherwise noted; properly segregate waste; load and haul materials to the staging/stockpiling area (if necessary)
Demolition materials are completely removed from the demo site and properly staged in an orderly manner at the designated staging areas only. Materials shall not exist outside their staging areas.
100%
Visual 100%
Disposal On-site Off-site Special treatment Documentation
| Demolition materials designated by the USFS to be disposed on-site shall be disposed at their designated location in a timely, safe and compliant manner. Demo materials designated by the USFS for off-site disposition shall be completely removed from the USFS property and disposed in compliance with all local, state, and federal regulations. The contractor shall acquire all necessary documentation and any special waste treatments. |
| Materials to be disposed shall be completely vacant from the demolition and staging areas. |
On-site disposal areas shall be safe and in compliance with all applicable local, state and federal rules.
Demo materials to be disposed off-site shall be disposed in a manner that complies with all local, state, and federal regulations regarding the material and will be accompanied with all necessary documents and treatments.
| 100% |
| Visual 100% |
Document Review 100%
Reuse/Recycling Segregate Load/haul Documentation
| Demo material designated to be reused or recycled shall be segregated from material to be disposed. Recycled material shall be loaded and hauled to designated staging or recycling area. The contractor shall obtain applicable documentation. |
| Recyclable or reusable material is completely removed from the demolition site, staged in the designated area and in the best condition possible from the demolition. |
All applicable local, state, and federal documents are acquired.
| 90 – 100% |
| Visual 90 – 100% |
Document Review 100%
Site Restoration Backfill compaction contouring seed/mulch erosion control
| Area to be restored shall be backfilled and compacted (Contractor shall supply additional, approved fill material as needed). Final grading shall blend in the demo site with the surrounding topography with allowance for further settling. The area shall be seeded and mulched with the designated seed mix by the USFS (contractor shall supply seed and mulch). Any addition erosion control measures shall be taken as needed. |
| The demo site shall blend in with the surrounding topography and absent of any erosion. No signs of soil migration into waterways shall be present. |
| 100% |
| Visual 100% |
| Mitigation/Restoration of any environmental damage |
| Repair all rutting, erosion or other environmental damage |
| Final area will be free of any ruts, erosion or any other signs of obtrusions |
| 100% |
| Visual 100% |
FS FURNISHED PROPERTY, MATERIALS AND SERVICES
General: The FS shall provide, without cost, the facilities, equipment, materials, and/or services listed below.
FS Furnished Materials:
1. Key for contractor gate access (cost of replacement for key not returned after work is completed will be paid by the contractor at the actual cost for changing the effected locks)
FS Furnished Facilities:
1. Overnight/weekend parking for Contractor equipment (unsecured)
2. Storage areas for materials (unsecured)
CONTRACTOR FURNISHED ITEMS AND SERVICES
General: Except for those items or services specifically stated to be furnished by the FS, the contractor shall furnish everything required to perform the work of this contract, task order, and/or attachment(s) to the Acceptable Quality Level indicated in said contract, task order, and/or attachment(s).
Demolition Material Reuse/Recycle and Disposal Matrix The contractor shall recycle all applicable demolition waste including but not limited to brick, steel and concrete, unless otherwise approved by the USDA Forest Service Contracting Officer’s Representative (C.O.R.). The contractor shall submit in a timely manner to a designated representative of the USDA Forest Service all available weight tickets for the removed materials, recycled and landfilled.
| Material Type |
| Material Examples |
| Example Reuse/Recycle |
| Comments |
1. Land clearing debris
| Landscape material |
| Shredded/chipped, |
Stockpiled on Midewin Landfill roads, other landscape use. May be tailored by Midewin to specific project needs
2. Ferrous Metal
| Structural steel |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Piping/conduit/culverts and appurtenances |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Sheet metal, decking and piling |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Recovered concrete reinforcing |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Non-structural framing |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Doors window and hardware |
| Reuse or recycle as scrap |
| Removed from Midewin |
| HVAC |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Light poles or mounts |
| Reuse or recycle as scrap |
| Removed from Midewin |
3. Non-ferrous Metal
| Structural aluminum |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Other aluminum |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Copper, brass, bronze |
| Reuse or recycle as scrap |
| Removed from Midewin |
| HVAC |
| Reuse or recycle as scrap |
| Removed from Midewin |
| Other |
| Reuse or recycle as scrap |
| Removed from Midewin |
4. Asbestos
| Friable |
| Properly remove, handle and landfill |
| No other option |
| Transite, non-friable |
| Properly remove, handle and landfill |
| No other option |
| Asbestos-containing items such as doors, boilers, window glazing, ceiling tiles |
| Properly remove, handle and landfill |
| No other option |
Asbestos-containing Floor tile
| Properly remove, handle and landfill |
| No other option |
Asbestos-containing siding
| Properly remove, handle and landfill |
| No other option |
Asbestos-containing Refractory/fire brick
| Properly remove, handle and landfill |
| No other option |
5. concrete
| Paving/masonry |
| Reuse, recycle as aggregate |
| Removed from Midewin |
| Drainage structures |
| Reuse, recycle as aggregate |
| Removed from Midewin |
| Structural |
| Reuse, recycle as aggregate |
| Removed from Midewin |
| Other reinforced |
| Reuse, recycle as aggregate |
| Removed from Midewin |
6. Asphalt
| Bituminous paving |
| Recycle at asphalt plant. Prairie View |
Landfill may accept as road material.
Removed from Midewin
7. Brick
| Pavers/flooring |
| Reuse, recycle as aggregate |
| Removed from Midewin or stockpiled as specified |
| Masonry |
| Reuse, recycle as aggregate. Prairie View Landfill may accept for roads. |
| Removed from Midewin |
| Clay, ceramic, concrete, slate roofing |
| Reuse, recycle as aggregate |
| Removed from Midewin |
| Brick/refractory |
| Reuse, recycle as aggregate |
Removed from Midewin
8. Stone
| Pavers/flooring |
| Reuse, recycle as aggregate |
| Removed from Midewin or stockpiled as specified |
| masonry |
| Reuse, recycle as aggregate |
| Removed from Midewin or stockpiled as specified |
| aggregate |
| Reuse, recycle as aggregate |
| Removed from Midewin or stockpiled as specified |
9. Wood
| Poles - any |
| Reuse or recycle, shredded/chipped (Wilmington Park District may accept for reuse) |
| Landfill may accept shredded/chipped for roads use |
| Structural members |
| Reuse or recycle, shredded/chipped |
| Landfill may accept shredded/chipped for roads use |
| Sheathing, flooring |
| Reuse or recycle, shredded/chipped |
| Landfill may accept shredded/chipped for roads use |
| windows |
| Reuse or recycle, shredded/chipped |
| Landfill may accept shredded/chipped for roads use |
10. Light fixtures
| Lighting fixtures |
| Reuse or recycle |
| Removed from Midewin |
| PCB ballast in fluorescent lights |
| See “Capacitors” in “Other” below |
| Lamps |
| Reuse or recycle |
| Removed from Midewin |
11. Other
| Capacitors – PCB or other |
| Recycle, if PCB then dispose |
| Removed from Midewin |
| Motor/hydraulic Oil |
| Recycle |
| Removed from Midewin |
| Mercury Switches |
| Recycle |
| Removed from Midewin |
| Glass, including reinforced glass |
| Recycle |
| Removed from Midewin |
| Vinyl siding |
| Recycle |
| Removed from Midewin |
| Rigid insulation board |
| Landfill or other arrangement |
| There may be ways to recycle these materials, but the quantity and condition of these materials may render it that not worth it. |
| Insulation batting |
| Landfill or arrange for recycle |
| Asphalt roofing |
| Landfill or arrange for recycle |
| Specialty doors |
| Landfill or arrange for recycle |
| Carpet and padding |
| Landfill or arrange for recycle |
| Non-ACM ceiling tile |
| Landfill or arrange for recycle |
| Equipment and furnishings |
| Recycle/scrap |
| Removed from Midewin |
END
COMMERCIAL FAR CLAUSES AND PROVISIONS:
The following Federal Acquisition Regulation (FAR) clauses and provisions, the Department of Agriculture Acquisition Regulation (AGAR) clauses and provisions, and supplemental terms and conditions apply to this solicitation and are incorporated by reference (IBR) or by full text into the solicitation and final awarded contract. Items IBR can be viewed in full text at http://www.acquisition.gov/far/ 52.212-1 Instructions to Offerors – Commercial Items (JAN 2017)
52.212-2 Evaluation – Commercial Items (OCT 2014) (FAR Provision)
(a) The Government will award a contract resulting from this solicitation to the responsive vendor identified as the lowest priced, technically acceptable offer. The following factors shall be used to evaluate for technical acceptability:
Past Performance on Similar Projects Safety Plan/Record Technical Approach
(b) A Contractor must be rated technically acceptable for all factors to be considered technically acceptable.
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.212-3 Offeror Representations and Certifications – Commercial Items (NOV 2017) 52.212-4 Contract Terms and Conditions – Commercial Items (Deviation 2017-1) (JAN 2017) Deviation 2017-1 modifies paragraph r to remove reference to 41 U.S.C. 4712. The inspection, changes, termination, and default paragraphs in this clause are replaced with the applicable clauses contained in this solicitation.
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items (Deviation 2017-1) (JAN 2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
_x_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_x_(3a) 52.203-17, Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (April 2014) (41 USC 4712) (Deviation 2017-1) _x_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) [Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
_x_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
__ (10) [Reserved].
__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
__ (ii) Alternate I (Nov 2011) of 52.219-3.
__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (ii) Alternate I (JAN 2011) of 52.219-4.
__ (13) [Reserved] _x_ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
__ (ii) Alternate I (Nov 2011).
__ (iii) Alternate II (Nov 2011).
__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
_x_ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III Nov 2016) of 52.219-9.
__ (v) Alternate IV (Nov 2016) of 52.219-9.
__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
_x_ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).
__ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f).
_x_ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
_x_ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
__ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).
_x_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_x_ (28) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
_x_ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).
_x_ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
_x_ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
_x_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
_x_ (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
_x_ (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__(36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
__ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693) __ (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Oct 2015) of 52.223-13.
__ (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-14.
__ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
__ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
_x_ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).
__ (43) 52.223-20, Aerosols (JUN 2016) (E.O. 13693) __ (44) 52.223-21, Foams (JUN 2016) (E.O. 13693) __ (45)(i)52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
__ (ii) Alternate I (JAN 2017) of 52.224-3.
_x_ (46) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).
__ (47)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (May 2014) of 52.225-3.
__ (iii) Alternate II (May 2014) of 52.225-3.
__ (iv) Alternate III (May 2014) of 52.225-3.
__ (48) 52.225-5, Trade Agreements (OCT 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_x_ (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
__ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
_x_ (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013) (31 U.S.C. 3332).
__ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).
__ (57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).
__ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.] __ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014)(E.O. 13495).
x__ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).
This contract is subject to Service Contract Wage Determination #2005-5019, dated 07/03/2018. Wage Determinations can be obtained from http://www.wdol.gov/ . A copy is attached.
_x_ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
This Statement is for Information Only:
| Employee Class |
| Monetary Wage—Fringe Benefits |
| GS-5 Laborer |
| $17.07 per hour plus fringes |
| GS-4 Laborer, Grounds Mtce |
| $15.25 per hour plus fringes |
| WG-10 Heavy Equip Operator |
| $25.98 per hour plus fringes |
| WG-10 Truck Driver |
| $25.98 per hour plus fringes |
__ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_x_ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).
__ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014) (41 U.S.C. chapter 67).
_x_ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
_x_ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
__ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).
__ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iv) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015)
(vi) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(vii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(viii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(ix) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212)
(x) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xi) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).
(xii) _x_(A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627).
__(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).
(xiii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xiv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xv) 52.222-54, Employment Eligibility Verification (OCT 2015) (E.O. 12989).
(xvi) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xvii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
(xviii)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xix) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xx) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
OTHER CONTRACTUAL REQUIREMENTS AND TERMS AND CONDITIONS:
FAR & AGAR CLAUSES:
52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016)
52.228-5 Insurance – Work on a Government Installation (JAN 1997)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991)
52.246-13 Inspection – Dismantling, Demolition, or Removal of Improvements (AUG 1996)
52.243-4 Changes (JUN 2007)
52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) (Apr 2012)
52.249-10 Default (Fixed-Price Construction) (APR 1984) Alternate 1 (APR 1984) AGAR 452.211-74 Period of Performance. (Feb 1988) The period of performance of this contract is from 9/1/2018 through 12/31/2018.
The Contractor shall maintain progress at a rate which shall assure completion and acceptance of work within the specified contract time.
AGAR 452.228-71 Insurance Coverage (NOV 1996)
Pursuant to the clause "Insurance - Work on a Government Installation (52.228-5)," the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
(d) Air craft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
PROVISIONS:
52.204-16 Commercial and Government Entity Code Reporting (JUL 2016)
AGAR 452.237-71 Pre-Bid/Pre-Proposal Conference (FEB 1988) (Provision)
(a) The Government is planning a pre-bid/pre-proposal conference, during which potential offerors may obtain a better understanding of the work required.
(b) Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference. Questions will be considered at any time prior to or during the conference; however, offerors will be asked to confirm verbal questions in writing. Subsequent to the conference, an amendment to the solicitation containing an abstract of the questions and answers, and a list of attendees, will be disseminated.
(c) In order to facilitate conference preparations, it is requested that the person named on the announcement of this solicitation be contacted and advised of the number of persons who will attend.
(d) The Government assumes no responsibility for any expense incurred by an offeror prior to contract award.
(e) Offerors are cautioned that, notwithstanding any remarks or clarifications given at the conference, all terms and conditions of the solicitation remain unchanged unless they are changed by amendment to the solicitation. If the answers to conference questions, or any solicitation amendment, create ambiguities, it is the responsibility of the offeror to seek clarification prior to submitting an offer.
(f) The conference will be held:
Date: August 9, 2018 Time: 9 AM CST Location: Meet at 30239 South State Route 53, Wilmington, IL 60481 Main Office
AGAR 452.215-71 Instructions for the Preparation of Technical & Business Proposals.
Contractors will be evaluated for technical acceptability based on the factors contained in FAR Clause 52.212-2:
Past Performance on Similar Projects Safety Plan/Record Technical Approach Contractors shall submit a list of references with contact information for similar projects completed within the last three years. Past Performance will be evaluated in terms of similarity of the work to this requirement, quality of work, timeliness, cost control, and customer satisfaction on past demolition type projects. The Forest Service may use sources of information other than what is provided to evaluate past performance. A contractor with no record of past performance will be evaluated neutrally in this factor.
Contractors shall submit their company safety plan. The Forest Service will also access the OSHA website for contractor safety inspection results as part of the Safety Plan/Record evaluation factor. https://www.osha.gov/oshstats/index.html
Contractors shall submit narrative on the way they plan to approach this project, including personnel and equipment to be used. All aspects of the work, including disposal, shall be addressed in this document. Include information on any subcontractors to be used.
A technically acceptable rating is given to submissions where the contractor and all subcontractors have acceptable past performance on similar projects, an acceptable safety plan and safety record, and a sound technical approach indicating that they can perform this contract successfully.
A technically unacceptable rating is given to those submissions that 1) fail to meet minimum evaluation standards, 2) have a low probability of satisfying the requirement, and/or 3) have significant deficiencies, even though they may be correctable. An unacceptable rating for any of the evaluation factors will result in an overall unacceptable rating.
Only the lowest priced offeror will be evaluated for technical acceptability. If lowest priced offeror is found technically unacceptable, the next lowest priced offeror will be evaluated, and so on until a technically acceptable contractor is found.
The entire offer package shall be contained in one PDF file (Exception: the safety plan may be a separate PDF or Word document).
Offers shall be submitted to: melissaajohnson@fs.fed.us. When an email is received by the Contracting Officer, you will receive a confirmation reply. If confirmation is not received, it is your responsibility to follow up with the Contracting Officer prior to the solicitation closing date and time. Questions may be addressed to the Contracting Officer at the above email address.
Offers are due no later than August 17, 2018 at 2 PM CT.
Contact Melissa Johnson at 814-728-6241 for more information or with questions concerning this solicitation.
All offerors must be registered in www.sam.gov in order to receive award. Obtaining a DUNS number and registering in SAM are free. See next page for what should be submitted with your offer.
OFFER SUBMISSION PACKAGE
(please complete and submit the following with your offer)
By submitting the offer, the Contractor agrees to all terms, conditions, clauses, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule. The offer is valid for 30 after the closing date of the solicitation unless a formal extension is granted by the contractor.
OFFEROR NAME __________________________________________________________
OFFEROR DUNS NUMBER _________________________________________________
OFFEROR EMAIL ADDRESS ________________________________________________
OFFEROR POINT OF CONTACT (NAME AND PHONE)_________________________________