MDEQ_Permit_Ottawa_NF_Newholm_Creek.pdf
PDF 81 KB Posted
- Attached to
- OTT - Newholm Creek Culvert Replacement
- Solicitation number
- 12569R18Q0014
About this file
MDEQ Project Permit
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid_Meeting_Attendees_and_Q&A's.docx | DOCX document | |
| J1_-_Specifications.doc | DOC document | |
| J3_-_Wage_Determination_MI1.txt | TXT text file | |
| J2_-_Plans,_Drawings,_&_Maps.pdf | ||
| J4_-_Experience_Questionnaire_-_Technical_Proposal.docx | DOCX document | |
| 12569R18Q0014_Newholm_Creek_Culvert_Replacement.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY
WATER RESOURCES DIVISION
PERMIT
Issued To:
Ottawa National Forest
E6248 US HWY 2
Ironwood, MI 49938
Permit No: WRP011198 Submission No.: HNC-9TVA-Z6TYP Site Name: 31-FR1100 Newholm Creek culvert-Laird Twp Issued: April 17, 2018 Expires: April 17, 2023
This permit is being issued by the Michigan Department of Environmental Quality (MDEQ), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:
Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands Part 315, Dam Safety Part 353, Sand Dunes Protection and Management Part 31, Water Resources Protection (Floodplain Regulatory Authority)
Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:
Authorized Activity:
Remove existing 50-foot long, 12-foot wide corrugated metal culvert and install a new 40.5-foot long, 16-foot wide aluminum arch culvert on Newholm Creek.
All work shall be completed in accordance with the attached plans and specifications of this permit.
Waterbody Affected: Newholm Creek Property Location: Houghton County, Laird Township, Town/Range/Section 49N37W07
Authority granted by this permit is subject to the following limitations:
A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.
B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.
C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.
D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.
E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.
F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with
2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.
DEQ-WRD
WRP011198 v1.0 Approved
Issued On:04/17/2018 Expires On:04/17/2023
Ottawa National Forest WRP11198
G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.
H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.
I. Permittee shall notify the MDEQ within one week after the completion of the activity authorized by this permit by completing and forwarding the attached preaddressed postcard to the office addressed thereon.
J. This permit shall not be assigned or transferred without the written approval of the MDEQ.
K. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.
L. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).
M. In issuing this permit, the MDEQ has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, the MDEQ may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.
N. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee’s obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee’s participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.
O. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, the MDEQ may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.
P. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from the MDEQ. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification.
Proposed modifications must be approved, in writing, by the MDEQ prior to being implemented.
Q. This permit may be transferred to another person upon written approval of the MDEQ. The permittee must submit a written request to the MDEQ to transfer the permit to the new owner. The new owner must also submit a written request to the MDEQ to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all of the above information may be provided to the MDEQ. The MDEQ will review the request and, if approved, will provide written notification to the new owner.
R. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.
S. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.
T. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).
U. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.
DEQ-WRD
WRP011198 v1.0
Approved
V. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.
W. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.
X. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.
Y. Work to be done under authority of this permit is further subject to the following special instructions and specifications:
1. Authority granted by this permit does not waive permit or program requirements under Part 91 of the
NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit www.mi.gov/deqstormwater and select "Soil Erosion and Sedimentation Control Program" under “Related Links.”
2. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.
3. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.
4. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.
5. The permit placard shall be kept posted at the work site, in a prominent location at all times for the duration of the project, or until permit expiration.
6. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee’s acceptance of this condition. The permit, when signed by the MDEQ, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.
7. The placement of the new culvert and the initial placement of fill in the stream shall be done in the dry or in such a manner that all flow is immediately passed through the culvert. The major placement of fill shall be done in the dry or in still water where erosion and siltation will be minimized. The fill material used in this initial placement shall be washed gravel, coarse aggregate, or rock and shall be placed at both ends of the culvert above normal water level before backfill material is placed.
8. The culvert shall be installed to align with the center line of the existing stream at both the inlet and outlet ends, and must be buried below the stream bed to provide a natural channel substrate through the structure as shown on the approved plans.
9. Road fill side slopes shall not be steeper than 1-on-2 (1 vertical to 2 horizontal) except where headwalls of reinforced concrete, mortar masonry, dry masonry, or other acceptable methods are used.
10. Road fill side slopes terminating in the stream and any raw streambanks resulting from the construction shall be stabilized with temporary measures in accordance with appropriate Best Management Practices based on site conditions, and if necessary, may be riprapped extending above the ordinary high water mark, before or upon commencement of the permitted activity. Temporary stabilization measures shall be maintained until permanent measures are in place.
11. All other road fill slopes, ditches, and other raw areas draining directly to the stream may be protected with riprap, sod and/or seed and mulch as may be necessary to provide effective erosion protection.
The placement of riprap shall be limited to the minimum necessary to ensure proper stabilization of the side slopes and fill in the immediate vicinity of the structure.
12. If the project, or any portion of the project, is stopped and lies incomplete for any length of time (other than that encountered in a normal work week) every precaution shall be taken to protect the incomplete work from erosion, including the placement of temporary gravel bag riprap, temporary seed and mulch, or other acceptable temporary protection. DEQ-WRD
WRP011198 v1.0 Approved
Issued On:04/17/2018 http://www.mi.gov/deqstormwater
13. No work shall be done in the stream during periods of above-normal flows except as necessary to prevent erosion.
14. The permittee is responsible for acquiring all necessary easements or rights-of-way before commencing any work authorized by this permit. All construction operations relating to or part of this project shall be confined to the existing right-of-way limits or other acquired easements.
15. The 100-year flood elevation of Newholm Creek at the bridge is 1133.7 ft, local datum, or 8.7 feet below the finished ground surface over the center of the new culvert.
16. Any materials remaining upon completion of the project should be relocated to outside of the 100 year floodplain.
17. The new culvert/bridge should be anchored to prevent flotation during flood flows.
18. Riprap should be installed such that it does not narrow up the stream or interfere with flows into and out of the culvert/bridge.
19. No raise in road grade elevation other than that shown in the plans is authorized by this permit.
20. Any temporary dam constructed as part of this project shall have the dam crest placed at such an elevation that the dam will not cause upstream flooding in the event of high flow conditions. In no case shall the crest be set at an elevation greater than two feet above the ordinary high water mark of the stream. The dam shall be removed within 14 days of placement.
21. Prior to the removal of the existing structures, cofferdams of steel sheet piling, gravel bags, clean stone, coarse aggregate, concrete, or other acceptable barriers shall be installed to isolate all construction activity from the water. The barriers shall be maintained in good working order throughout the duration of the project. Upon project completion, the accumulated materials shall be removed and disposed of at an upland site. All cofferdam and temporary steel sheet pile shall then be removed in its entirety.
Issued By:
Helana Nelson Upper Peninsula District Office Water Resources Division 906-202-1507 cc: Laird Township Clerk Houghton County Drain Commissioner/CEA
DEQ-WRD
WRP011198 v1.0
Approved
File details come from the government source that posted it.