Attachment4.pdf
PDF 69 KB Posted
- Attached to
- ROAD MAINTENANCE SERVICES IDIQ
- Solicitation number
- 1255N918R0002
About this file
Attachment #4 Special Project Specifications for Construction and Maintenance of Roads
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2015-4365.pdf | ||
| OH180002.pdf | ||
| 1255N918R0002.pdf | ||
| 2015-4765.pdf | ||
| Attachment_8.pdf | ||
| 2015-4729.pdf | ||
| Attachment_11.pdf | ||
| Attachment_7.pdf | ||
| Attachment1.pdf | ||
| Attachment6.pdf | ||
| 2015-4771.pdf | ||
| 2015-5785.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 – Special Project Specifications for Construction and Maintenance of Roads
SPS-151 Mobilization
This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary preparatory to commencing work required in the Task Order.
Contractors shall mobilize from their business location. Mobilization is only chargeable once for each Task Order from the contractor’s location to the first job site; no additional miles shall be charged for movement between sites on the T.O. All construction equipment will be pre-washed to remove soil and seeds prior to being brought onto National Forest land. Any equipment with soil or seeds on it will be rejected until it is cleaned. Equipment will also be washed prior to leaving the site so as not to transport Non-Native Invasive Species (NNIS) to other locations from the project site. Equipment delivering supplies and products which do not leave the roadways is exempt from this requirement.
Method of measurement = Mile.
Unit of measure = distance in miles from the Contractor’s business location to the T.O. home base site.