124D9018B0003 Attachment 5

View the file

Other files for this federal contract opportunity

Other files attached to WRP ACEP Fence Construction Calhoun County, TX, newest first.
File Type Posted
BID_OPENING_RESULTS.pdf PDF
124D9018B0003_Amendment_0002.pdf PDF
124D9018B0003_Amendment_0001.pdf PDF
124D9018B0003_Attachment_3.pdf PDF
124D9018B0003_Attachment_1.pdf PDF
124D9018B0003.pdf PDF
124d9018B0003_Attachment_2.pdf PDF
124D9018B0003_Attachment_4.pdf PDF
124D9018B0003_Attachment_7.pdf PDF
124D9018B0003_Attachment_6.pdf PDF
124D9018B0003_Pre-Solicitation_Notice_WRP_ACEP_Fence.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Number :

I. WIRE : Installed

A. Barbed wire or Net wire Wire must meet ASTM--121 for barbed (Gaucho)

1. Size (gauge)

2. Strands

3. Height of top wire

4. Height of bottom wire

5. Wire attachments :

(T-post) a. wire clips

6. Splice used :

(* 8 wraps / side) or

Western Union Splice

II. LINE POST : Installed

A. T - Post (Galvanized)

1. Length

2. Weight per foot

3. Spacing

4. Depth in ground :

B. Galvanized Post (Must be driven and capped)

1. Length

2. Top diameter 2 3/8 in.(OD) +

3. Spacing

4. Depth in ground :

Required

6 ft.

1.33 lb/ft.

36 in.+

7 ft.+

24 in.+ 15 ft.

90 ft. +

42 in.

*Western Union

Loop Splice

18 in.

12 - 12 1/2 gauge

NON-ELECTRIC FENCE (382) SPECIFICATIONS

Quick Reference Checklist & Certification of Review

Required

15.5 (Gaucho)

Calhoun County WRP Fencing

124D9018B0003 Attachment 5

III. END / GATE BRACES : Installed A. Galvanized posts will be driven with ends capped and no-weld brace system used.

(1) Upright post (Must be driven and capped ) -

1. Length

2. Top diameter

3. Inside spacing

4. Depth in ground

(2) Cross member -

1. Length

2. Top diameter

3. Distance above ground

GATES:

Galvanized See maps for locations, number, and length of gate(s) 6 bar 16 gauge tubing 1 5/8 in (OD) Hinges will be all thread "J" Bolts with a nut and flat washer on each side of post for adjusting Latches or chains installed

GENERAL:

1. All material must be new

2. Wires at the ends and pull posts must be double wrapped around the post at the most distant end

3. End braces will be double H and a galvanized no-weld brace system used and shall meet or exceed the minimum of:

*Bands are 11 gauge mild steel, A36 and will meet or exceed ASTM F626 specs for

1.2 oz galvanizing.

*Bolt is grade 2, 3/8 X 3 inch hot dipped galvanized, with standard nuts hot dipped galvanized.

*Serrated flange nut may be zinc coated if hot dipped galvanized is unavailable.

*Tube material is 2 5/8 inch OD X .095 wall HR EWT - F.C. .010" - SAE1010 -

ASTM- A-513, hot dipped galvanized and meets ASTM F626 for 1.2 oz galvanizing.

(continued on next page)

8 ft.+

2 3/8 in.(OD) + 39 in.+

NO-WELD STEEL 3-POST (double H) END BRACE

8 ft.+ 60 in.+

Required

9 ft.+ 4 in.(OD) +

4. Wire spacing will be as follows:

Top - 42. in from ground 2nd - 30 in. from ground 3rd - 24 in. from ground Bottom - 18 in. from ground

IV. PULL ASSEMBLY BRACES : Installed

A. Galvanized posts will be driven with ends capped and no-weld brace system used.

(1) Upright post (Must be driven and capped ) -

1. Length

2. Top diameter

3. Inside spacing

4. Depth in ground

(2) Cross member -

1. Length

2. Top diameter

3. Distance above ground

(H - type brace)

2 3/8 in.(OD)+ 39 in.+

NO-WELD STEEL 2-POST PULL ASSEMBLY

8 ft.+ 60 in.+

8 ft.+

Required

9 ft.+ 4 in.(OD)+

NOTE : All pull assemblies will be placed at approximately 1,320 ft. (normal length of spool) and at points of extreme changes in slopes.

V. ANGLE BRACES :

NOTE : Angle braces required where the angle of the fence changes more than 20 degrees.

(To be placed on the inside of curves or angles)

Installed A. Galvanized posts will be driven with ends capped and no-weld brace system used.

(1) Upright post (Must be driven and capped ) -

1. Length

2. Top diameter

3. Upright post to anchor

4. Depth in ground

(2) Angle brace pipe -

1. Length

2. Top diameter

(3) Anchor pipe -

1. Length

2. Top diameter

3. Depth in ground

State law requires that you notify the One-Call Board of Texas at 1-800-545-6005 no more than 14 days, no less than 48 hours, excluding Saturdays, Sundays, and legal holidays, prior to starting construction/excavation activities.

I have reviewed all of the NRCS Fencing Specifications listed above and understand that I must comply with the planned fencing specification to be reimbersed.

Contractor Name: Date:

48 in.+

2 3/8 in.(OD) +

7 ft.+ 4 in.(OD) +

8 ft.

60 in.+

8 ft.+

Required

9 ft.+ 4 in.(OD) + xxxxxxx xxxxxxx