124D9018B0003_Attachment_4.pdf

PDF 576 KB Posted

Attached to
WRP ACEP Fence Construction Calhoun County, TX Federal contract opportunity
Solicitation number
124D9018B0003
Issued by
Department of Agriculture National Resources Conservation Service Headquarters

About this file

124D9018B0003 attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to WRP ACEP Fence Construction Calhoun County, TX, newest first.
File Type Posted
BID_OPENING_RESULTS.pdf PDF
124D9018B0003_Amendment_0002.pdf PDF
124D9018B0003_Amendment_0001.pdf PDF
124D9018B0003_Attachment_5.pdf PDF
124d9018B0003_Attachment_2.pdf PDF
124D9018B0003_Attachment_3.pdf PDF
124D9018B0003_Attachment_1.pdf PDF
124D9018B0003.pdf PDF
124D9018B0003_Attachment_7.pdf PDF
124D9018B0003_Attachment_6.pdf PDF
124D9018B0003_Pre-Solicitation_Notice_WRP_ACEP_Fence.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Natural Resources Conservation Service

STATEMENT OF WORK

Obstruction Removal (500)

Texas

July 24, 2009 1

These deliverables apply to this individual practice. For other planned practice deliverables refer to those specific Statements of Work.

DESIGN

Deliverables:

1. Design documents that demonstrate criteria in practice standard have been met and are compatible with planned and applied practices

a. Practice purpose(s) as identified in the conservation plan.

b. List of required permits to be obtained by the client

c. Compliance with NRCS national and state utility safety policy (NEM part 503-Safety, Section 503.00 through 503.22)

2. Written plans and specifications including sketches and drawings shall be provided to the client that adequately describes the requirements to install the practice and obtain necessary permits.

3. Certification that the design meets practice standard criteria and comply with applicable laws and regulations

(NEM Subpart A, 505.03(b)(2)).

4. Design modifications during installation as required

INSTALLATION

Deliverables

1. Pre-installation conference with client and contractor

2. Verification that client has obtained required permits

3. Staking and layout according to plans and specifications including applicable layout notes

4. Installation inspection

a. Actual materials used

b. Inspection records

5. Facilitate and implement required design modifications with client and original designer

6. Advise client/NRCS on compliance issues with all federal, state, tribal, and local laws, regulations and NRCS policies during installation

7. Certification that the installation process and materials meets design and permit requirements (NEM Subpart A, 505.03(c)(1)).

CHECK OUT

Deliverables

1. As-built documentation

a. Extent of practice units applied

b. Final quantities

2. Certification that the installation meets NRCS standards and specifications and is in compliance with permits

REFERENCES

• Field Office Technical Guide (eFOTG), Section IV, Conservation Practice Standard – Obstruction Removal, 500.

• National Engineering Manual

• NRCS National Environmental Compliance Handbook

• NRCS Cultural Resources Handbook