ATTACHMENT 3 - Planset Drawings_ OCA ERFO NFSR 29-0.0 (1).pdf
PDF 4 MB Posted
- Solicitation number
- 12467020R0064
About this file
This document package includes construction drawings and specifications for a road construction project on National Forest System Road 29 in Florida. Work includes installing culverts, spreading aggregate base, reconditioning the roadbed, excavating ditches and slopes, building lead-off ditches, clearing and grubbing, and seeding and mulching. The project is located near Salt Springs, Florida between mile posts 0.0 and 7.17. The period of performance is 120 days from notice to proceed. The estimated value is between $500,000 and $1 million. Payment and performance bonds are required. The pre-solicitation for Solicitation Number 12467020R0064 from the US Department of Agriculture Forest Service Southern Region is for a 100% small business set-aside contract to be awarded as a firm fixed-price contract. The solicitation is planned for release on or around June 3, 2020.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture
Forest Service
USDA FOREST SERVICE
REGION 8
PROJECT NAME
ABBREVIATIONS
ADA - AMERICANS WITH DISABILITIES ACT
AGG - AGGREGATE
BP - BEGINNING OF PROJECT
BVC - BEGIN OF VERTICAL CURVE
℄ - CENTER LINE
CMP - CORRUGATED METAL PIPE
COR - CONTRACTING OFFICER'S REPRESENTATIVE
DWG - DRAWING
EG - EXISTING GRADE
EOP - END OF PROJECT
EOS - EDGE OF SHOULDER
EP - ENDING OF PROJECT
ETW - EDGE OF TRAVELED WAY
EVC - END VERTICAL CURVE
EXT - EXISTING
FRD - FOREST ROAD DESIGNATION
I.E. - INVERT ELEVATION
NTS - NOT TO SCALE
NFSR - NATIONAL FOREST SYSTEM ROAD
OVERALL HP - OVERALL HIGH POINT
OVERALL LP - OVERALL LOW POINT
PC - POINT OF CURVATURE
PCC - POINT OF COMPOUND CURVATURE
PRC - POINT OF REVERSE CURVATURE
PT - POINT OF TANGENCY
PVI - POINT OF VERTICAL INTERSECTION
TW - TRAVELED WAY
TYP - TYPICAL
USFS - UNITED STATES FOREST SERVICE
VC - VERTICAL CURVE
SCALED TO A 11x17
OCALA NF MAP
NO SCALE
STATE MAP
NO SCALE
INDEX
SHEET SUB SHEET SHEET TITLE
1 G1 TITLE SHEET
2 G2 ESTIMATE OF QUANTITIES
3 G3 NFSR 29 ROAD REPAIR SCHEDULE
4 D1 CULVERT AND DITCHING BLOCK DETAIL
5 D2 TYPICAL ROADWAY SECTIONS
6 D3 SILT FENCING DETAIL
7 D4 SEDIMENT WATTLE DETAIL
LEGEND
COMMON TO ALL
SHEETS
DETAIL
SEE DETAIL
SHEET NUMBER
CONTROL POINT
DRAWING TITLE
DESIGNER
DRAWN
CHECKED
PROJECT NO.
DWG SHEET NO.
SHEET
TITLE SHEET
G1
DATE
REVIEWED BY ARCHEOLOGIST DATE
DATE
APPROVED BY DISTRICT RANGER
E. WHATLEY
E. WHATLEY
SUBMITTED BY DESIGNER DATE
RECOMMENDED BY FOREST ENGINEER
OCALA NATIONAL
FOREST
NFSR 29 ROAD
REHABILITATION
CONSTRUCTION
PROJECT
NFSR 29 (BP)
NFSR 29 PROJECT LOCATION
BP COORDINATES: 29.359788, -81.735011
NFSR 29 (EP)
NFSR 29
E. WHATLEY 12-21-18
12467020R0064
ATTACHMENT 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text
U.S. ROUTE
AutoCAD SHX Text
STATE ROUTE
AutoCAD SHX Text
RAIL ROAD TRACK
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text A
AutoCAD SHX Text B A1
* DENOTES CONTRACT QUANTITIES
PER FSSS SECTION 109.02 (b)
ROAD NUMBER:
MILE POST:
ITEM NO. DESCRIPTION
15101 Mobilization
ESTIMATE OF QUANTITIES
M.P. 0.00 - 7.17
PAY UNIT
QUANTITIES
Lump Sum ALL
NOTES
Includes equipment, equipment cleaning requirements, and fire protection. Conform to FP-14.
30103
Aggregate base, grading C (Base), compaction method C
Cubic Yard
12045
Includes furnishing, placement and compaction of 4-inch depth aggregate base compacted-in-place. Refer to Road Repair Schedule and FP-14 Section 703 Table 703-2
20423 Drainage Excavation, type Lead Off Ditch *Cubic Yard
Refer to Road Repair Schedule, FSSS Section 203 & 204 and Drawing sheet D1 and D2.
Dispose of material as approved by C.O. to FSSS Subection 203.05 (f) Scattering.
62504
Seeding, dry method
Acre 10.10
62507
Mulching, dry method Acre
10.10
Mulch all ditch, cut slopes, and lead-off ditches disturbed areas with weed free mulch per
FP-14 Section 625 Turf Establishment.
Seed all ditch, cut slopes, and lead-off ditches disturbed areas with approved seed mix per
FSSS Section 625 Turf Establishment.
30307
Roadbed reconditioning, compaction method C
Mile 7.17
Refer to Road Repair Schedule and FSSS Section 303
15713
Soil Erosion & Pollution Control
Includes all soil erosion control measures. Submit Erosion Control Plan in accordance to FSSS
Section 157.04
20427
Excavation, type Ditch With 1V:2H Cut Slope until
Daylight
Foot 17023
Refer to Road Repair Schedule, FSSS Section 203 & 204 and Drawing sheet D2. Dispose of material as approved by C.O.. Disposal shall conform to FSSS Subection 203.05 (f)
Scattering. Scatter excessive excavated material outside roadway prism in a layer of uniform thickness as approved by the C.O.. Ditch back cut slope catchpoints may vary.
20102
Clearing and grubbing, disposal method, (f)
Scattering
Acre 10.10
Refer to Road Repair Schedule, FP-14 and FSSS Section 201 & 203 Dispose of material as approved by C.O. to FSSS Subection 203.05 (f) Scattering.
Lump Sum
60201
24, inch diameter pipe culvert, Metallic-Coated
Corrugated Steel, 16 Gauge
Foot
Includes furnishing and placement of 4" of un-compacted bedding material and furnishing and installation of culverts with backfillingg and compaction. Refer to Road Repair Schedule and FSSS Section 602. Bedding material shall be incidental to this pay item.
DESIGNER
DRAWN
CHECKED
PROJECT NO.
DWG SHEET NO.
SHEET
E.WHATLEY
G2
DRAWING TITLE
ARCHIVE NO.
ESTIMATE OF
QUANTITIES
DATE SIGNED
United States Department of Agriculture
Forest Service
USDA FOREST SERVICE
REGION 8
PROJECT NAME
OCALA NATIONAL
FOREST
NFSR 29 ROAD
REHABILITATION
CONSTRUCTION
PROJECT
12467020R0064
ATTACHMENT 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
W
W
W
W
W
W
W
10' WIDE
EXISTING ROADWAY
ABANDON EXISTING
LEAD OFF DITCH
30'
CONSTRUCT 50' RADIUS
CURB ONTO EXISTING
ROADWAY
ABANDON
EXISTING LEAD
OFF DITCH
W
W
W
W
W
W
CONSTRUCT LEAD
OFF DITCH
DOWNHILL
INSTALL 24"Ø X 40'
LENGTH CULVERT
W/ SKEW
CONSTRUCT DITCH
TO INLET OF CULVERT
INSTALL 24"Ø X 36'
LENGTH CULVERT
W/ SKEW
United States Department of Agriculture
Forest Service
USDA FOREST SERVICE
REGION 8
PROJECT NAME
OCALA NATIONAL
FOREST
DRAWING TITLE
ARCHIVE NO.
DESIGNER
DRAWN
CHECKED
PROJECT NO.
DWG SHEET NO.
SHEET
NFSR 29 ROAD
REPAIR SCHEDULE
G3
DATE SIGNED
NFSR 29 ROADWAY REPAIR SCHEDULE
NFSR 29 ROAD
REHABILITATION
CONSTRUCTION
PROJECT
NFSR 29 ROADWAY INTERSECTION @ M.P. 3.917
12467020R0064
ATTACHMENT 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AS STAKED OR
20' MIN.
AS STAKED OR
20' MIN.
ROADBED
CLEARING &
SEEDING
12"
LEAD OFF DITCH
SEE SHEET D2 FOR PLAN VIEW
WING DITCH
DITCH BLOCK
NOTES:
1. THE SLOPE OF LEAD-OFF DITCHES SHALL BE CONSTRUCTED TO A MINIMUM
OF -2% FOR A MINIMUM OF 25' OR SHOWN IN REPAIR SCHEDULE. LEAD OFF
DITCHES SHALL BE APPROVED BY C.O. BEFORE CONSTRUCTION CAN
COMMENCE.
2. DITCH BLOCK WILL NOT BE REQUIRED WHEN INLET BASIN IS IN A SAG.
3. DITCH BLOCK ELEVATION SHALL BE 4" LOWER THAN THE ADJACENT
SUBGRADE ELEVATION.
4. DITCHES SHALL BE CONSTRUCTED AT LOCATIONS SHOWN.
5. ROADWAY DITCH AS SHOWN ON TYPICAL SECTIONS.
B L O
C K
D I T
C H
NOTES:
1. WHEN NECESSARY, ALL CULVERTS SHALL HAVE A LEAD OFF DITCH (LOD) OF SUFFICIENT LENGTH AS APPROVED BY THE C.O. TO ASSURE AN ADEQUATE
DRAINAGE OUTLET.
2. CULVERTS SHALL BE SKEWED AS NOTED IN REPAIR SCHEDULE.
3. IN MULTIPLE PIPE INSTALLATIONS, THE ADJACENT SIDES OF PIPE SHALL BE AT LEAST ONE-HALF THE NOMINAL PIPE DIAMETER APART OR 3', WHICHEVER
IS LESS.
4. ALL PIPES SHALL HAVE A MINIMUM OF 12" OF COVER BETWEEN THE TOP OF PIPE AND FINISHED GRADE, MEASURED VERTICALLY.
5. EMBANKMENT & COMPACTION OF SUBGRADE MATERIAL BETWEEN 12" ABOVE PIPE AND SUBGRADE SHALL BE IN ACCORDANCE WITH FP-14 SECTION 208.
6. TOPSOIL OR OTHER MATERIAL CAPABLE OF SUSTAINING VEGETATION SHALL BE UNIFORMLY SPREAD OVER THE COMPLETED SURFACE TO FILL VOIDS
AND PROMOTE VEGETATIVE GROWTH. THE INSTALLATION SHALL THEN BE SEEDED, FERTILIZED, & MULCHED IN ACCORDANCE WITH PAY ITEMS.
7. SKEW ANGLE IS ALWAYS FROM RIGHT OF ℄
EXCAVATED
MATERIAL
CLEARING & SEEDING
8', TYP.
6'
1.0'
V
H
V
H
NATURAL
GROUND
NATURAL
GROUND
24" MIN.
COMPACTED
TO 95%±
24" MIN
OR 6"+*D
EDGE OF ROADBED
TOE OF FILL
F L
O W
T
O
F
I
L
L
CULVERT
GRADE GRADE GRADE
EDGE OF SHOULDER,
TYP
2*D OR
4' MIN.
BACKSLOPE IN
TAPER SECTION
TO BE SAME AS
SLOPE ON EACH
SIDE
NORMAL BACKSLOPE
OR EXISTING GROUND
12" MIN.
COVER
DISCHARGE ONTO NATURAL
GROUND UNLESS SPECIFIED
OTHERWISE
FILL SLOPES AS
SHOWN ON TYPICAL
OR STAKED
DITCH SLOPE TO FLOW LINE
OF CULVERT TO BE SAME AS
NORMAL DITCH SLOPE
NEW INSTALLED CULVERT
EXISTING
GROUND
FINISH GROUND
DISCHARGE ONTO NATURAL
GROUND UNLESS SPECIFIED
OTHERWISE
FILL SLOPES AS
SHOWN ON TYPICAL
OR STAKED
NEW INSTALLED CULVERT
T
D
T
C
H
D R
A I N
T
L
L
W
I
N
G
D
I
T
C
H
T
P
C
U
T
4' MIN.
1V:2H
SLOPE
*DITCH *DITCH
25' TRANSITION
24" (SEE PROFILE
ALONG DITCH)
SHOULDER
*DITCH
TOP OF CUT
G
R
A
T
R
A
I N
L
E
A
D
O
T
C
H
F
L
O
W
W
I
N
G
T
C
H
A
A
M
I
N
DITCH BLOCK
SECTION
PROFILE ALONG
DITCH
PLAN
M
I
N
EVENLY GRADE
NORMAL DITCHLINE
SLOPE FROM "A" TO
"B" TO MATCH
CULVERT INVERT
ELEVATION AT "B"
"A""B"
DITCH BLOCK
NORMAL SECTION
OR EXISTING SLOPE
2*D OR
4' MIN.
ROAD
SUBGRADE
TOP DITCH
BLOCK
24"
CULVERT
DITCH F/L
ROAD SUBGRADE
6"
DITCH BLOCK
CUT SLOPE
DITCH BOTTOM
6"
DIA.
8"
GRADE OF THE DITCH
TO EQUAL OR EXCEED
THE CULVERT GRADE
MIN. COMPACTED WIDTH = "D"
PLACE AND COMPACT BACKFILL
MATERIAL IN EVENLY BALANCED
LAYERS ON EACH SIDE OF THE PIPE
TO A HEIGHT OF 12" IN COMPACTED
LAYERS NOT EXCEEDING 6" PER
FP-14
SECTION 209.09(B)
GROUND
LINE
*D
1-1/2 *D OR
AS STAKED
NOTES:
1. *D = DIMATER OF CULVERT
2. CONSTRUCT LEAD OFF DITCHES AS
SHOWN IN LEAD OFF DITCH DETAIL
BELOW PER SUBSHEET D1 AND
SUBSHEET D2. ALL WORK IN
COVERED IN PAY ITEM 20423.
EXISTING GROUND
FINISHED GROUND
PLACE 4" OF UN-COMPACTED BEDDING
MATERIAL IN A LAYER OF UNIFORM
THICKNESS PER FP-14 SECTION 209.08(b)
NOT STEEPER THAN
DEPTH
REQUIRED BY OSHA
12" MIN.
COVER
NOTES:
1. PIPE BEDDING MATERIAL SHALL CONFORM
TO FP-14 SECTION 704.02.
2. EXCAVATION LIMIT AS REQUIRED BY
OSHA.
3. COMPACT BACKFILL PER FP-14 SECTION
209.09
4. ℄ OF PIPE IS SHOWN IN TRENCH
B
D3
B
D3
B
D3
B
D3
B
D3
B
D3
TYPICAL INSTALLATION IN SIDEHILL SECTION
WITH INLET BASIN
United States Department of Agriculture
Forest Service
USDA FOREST SERVICE
REGION 8
DESIGNER
DRAWN
CHECKED
PROJECT NO.
DWG SHEET NO.
SHEET
D1
TYPICAL INSTALLATION IN FILL SECTION
TYPICAL INSTALLATION WITH OUTLET DITCH
SECTION A-A
TYP. BACKFILL DETAIL
PLAN VIEW
NTS
DITCHING DETAILS
NTS
DRAWING TITLE
ARCHIVE NO.
CULVERT AND
DITCHING BLOCK
DETAILS
DATE SIGNED
PROJECT NAME
OCALA NATIONAL
FOREST
NFSR 29 ROAD
REHABILITATION
CONSTRUCTION
PROJECT
12467020R0064
ATTACHMENT 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
10" - 12"
UNDISTURBED
MATERIAL
EDGE OF ROAD
BACKSLOPE SHALL BE 1V:2H OR
FLATTER, TYP. SEE "CUT AND FILL
SLOPE TRANSITION DETAIL" (ALL
WORK COVERED IN PAY ITEM
20427)
SEEDING AND MULCHING
COVERED IN PAY ITEM, TYP
FORESLOPE,
TYP
DAYLIGHT CUT/
BACKSLOPE, TYP
EXISTING
ROADWAY ℄
UNDISTURBED SOIL
BOTTOM OF DITCH
NOTES:
1. AN OUTLET LEAD-OFF DITCH
CARRIES WATER AWAY FROM A
ROAD TO PREVENT THE ROAD
SUBGRADE FROM BEING
SATURATED OR ERODED.
2. LOCATE AN OUTLET DITCH AT
THE LOWER END OF A CULVERT
OR DRAIN DIP OR AT THE POINT
WHERE A ROADSIDE DITCH
DAYLIGHTS ONTO NATURAL
GROUND.
3. CONSIDER USE OF ENERGY
DISSIPATION MEASURES AS
NEEDED.
4. REPAIR TO REPAIR SCHEDULE
LEAD-OFF DITCH
BACKSLOPE
CONSTRUCT LEAD-OFF
DITCH UNTIL DAYLIGHT
(-2% MINIMUM)
24" ID
OD
TRENCH WIDTH
ROADWAY FINISHED GRADE
EXCAVATION LIMIT AS
REQUIRED BY OSHA
PLACE 4" OF UN-COMPACTED
BEDDING MATERIAL IN A LAYER
OF UNIFORM THICKNESS PER
FP-14 SECTION 209.08(b)
SMOOTH BOTTOM,
FREE OF LOOSE SOIL
OR DEBRIS
M
A
X
S
L
O
P
E
STRUCTURAL
BACKFILL
SPRINGLINE
HAUNCH AREA SHALL BE
SHOVEL COMPACTED
APPROX
45°
VERTICAL LINE
FROM EDGE OF
PIPE
COMPACT BACKFILL PER
FP-14 SECTION 209.09
GENERAL NOTES:
1. EXCAVATE TRENCH TO A
WIDTH THAT ALLOWS ROOM
FOR WORK
2. CULVERT SHALL BE A
METALLIC-COATED
CORRUGATED STEEL PIPE.
FURNISH PIPE, SPECIAL
SECTIONS (SUCH AS ELBOWS,
BRANCH CONNECTIONS ETC)
& COUPLING BANDS
CONFORMING TO AASHTO M
36 AND EITHER AASHTO M 218,
AASHTO M 274, OR AASHTO M
289 FOR THE DIMENSIONS &
THICKNESSES SPECIFIED.
3. PIPE BEDDING MATERIAL
SHALL CONFORM TO FP-14
SECTION 704.02.
4. ℄ OF PIPE IN TRENCH
5. INSTALL AT A MIN OF -2.5%
GRADIENT. IF EXISTING
GROUND IS STEEPER, MATCH
EXISTING.
ROUND CORRUGATED
METAL PIPE
PIPE
12" MIN.
COVER
4"
NOT STEEPER THAN DEPTH
REQUIRED BY OSHA
20' FULL WIDTH OF ROADWAY
1' SHOULDER
TYP.
FINISHED COMPACTED
SURFACE
18' TRAVELED WAY
GRUBBING LIMITS
CLEARING LIMITS
SEEDING
(VARIES)
SEEDING
(VARIES)
1' MIN. NOMINAL
DITCH BOTTOM DEPTH
TYP. TO BOTH SIDES
ROADWAY
-2% M
IN.-2
M
IN
C O
N S
T
L I M
I T
S
V
H
V
H
D
A
Y
L
I
G
H
Y
P
D
A
Y
L
I
G
L
P
D
A
Y
L
I
G
P
D
A
Y
L
I
G
L
P
C O
N S
T
L I M
I T
S
1'
MIN.
EXISTING GROUNDLINE
NOTES:
1. DOUBLE-LANE ROADS SHALL HAVE
A -2% CROWN SURFACE AS SHOWN.
V
H
V
H
CONSTRUCT CUTSLOPE/
BACKSLOPE UNTIL DAYLIGHT
CATCHPOINT, TYP. CATCHPOINTS
VARIES. (COVERED IN PAY ITEM
20427)
"L"
SEE NOTE 1
℄ OF NFSR 29
DITCH ℄
FILL SLOPE DAYLIGHT
CATCHPOINT, TYP
1V:2H CUTSLOPE/
BACKSLOPE
DESIGNER
DRAWN
CHECKED
PROJECT NO.
DWG SHEET NO.
SHEET
E.WHATLEY
D2
DITCH ESTABLISHMENT AND CLEANING DETAIL
TYPICAL TO BOTH SIDES (NTS)
LEAD-OFF DITCH DETAIL (MITRE DRAIN)
TYPICAL TO BOTH SIDES (NTS)
STANDARD TRENCH PIPE INSTALLATION B-B
NTS
MINIMUM HAUCH AREA DETAIL
NTS
DRAWING TITLE
ARCHIVE NO.
TYPICAL ROADWAY
SECTIONS
DATE SIGNED
United States Department of Agriculture
Forest Service
USDA FOREST SERVICE
REGION 8
PROJECT NAME
OCALA NATIONAL
FOREST
NFSR 29 ROAD
REHABILITATION
CONSTRUCTION
PROJECT
CROWNED ROADWAY SECTION DETAIL
TYP. TO BOTH SIDES (NTS)
CUT AND FILL SLOPE TRANSITIONS DETAIL
PICTORIAL VIEW
GENERAL NOTE:
1. DISTANCE "L" MAY VARY TO ESTABLISH THE
BLEND OF CUT AND FILL SLOPES INTO THE
ORIGINAL GROUND.
12467020R0064
ATTACHMENT 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
GENERAL NOTES:
1. SILT FENCE MAY BE INSTALLED
USING MACHINE SLICING AS
APPROVED BY THE CO. INSTALL
MACHINE-SLICED SILT FENCE
ACCORDING TO THE
MANUFACTURER'S
RECOMMENDATIONS.
2. INSTALL SILT FENCE TO FOLLOW THE
GROUND CONTOURS AS CLOSELY AS
POSSIBLE.
3. AS THE SLOPE IS CONSTRUCTED,
CURVE THE SILT FENCE UP THE
SLOPE TO PREVENT WATER FROM
RUNNING AROUND THE ENDS.
4. POST SPACING WITH FENCE
SUPPORT MESH = 10 FT. (MAX.)
POST SPACING WITHOUT FENCE
SUPPORT MESH = 6 FT. (MAX.)
5. ALL SOIL EROSION CONTROL
MEASURES ARE COVERED IN PAY
ITEM 15713.
6" MIN. TRENCH
GEOTEXTILE
FENCE SUPPORT MESH (OPTIONAL)
STEEL OR WOOD POST
24" MIN.
30" MIN.
18"
6" MIN.
BACKFILLED AND COMPACTED SOIL
END POSTS
SEE END POSTS DETAIL
SEE NOTE 3
SEE NOTE 3
END POSTS
SEE END POSTS DETAIL
T O
E
O
F
S
L O
P E
F
I
O
P
E
ELEVATION PLAN
STEEL OR WOOD POST
STAPLE OR TIE
GEOTEXTILE FABRIC
PLAN
LIMITS OF CLEARING
EXISTING GROUND
UNDISTURBED
VARIES
FLOW
F
I
O
P
E
ELEVATION
VARIES
FLOW
PLAN
SEE NOTE 4
FOR SPACING
T O
E
O
F
S
L O
P E
TOE OF SLOPE
EDGE OF SHOULDER
EDGE OF SHOULDER
SILT FENCE
ROADWAY
TOE OF SLOPE
PLAN
EXISTING RGOUND
S
H
E
O
W
FILL
SILT FENCE
SECTION A-A
FLOW
STAPLE OR TIE
GEOTEXTILE FABRIC
SECTION B
STEEL OR WOOD POSTS
POST DRIVEN TIGHTLY TOGETHER.
TOP OF POSTS TIED TOGETHER
GEOTEXTILE FABRIC
SECTION A
FOLD GEOTEXTILE FABRIC
AROUND EACH POST ONE FULL TURN.
FASTEN FABRIC TO POSTS.
PLAN
United States Department of Agriculture
Forest Service
USDA FOREST SERVICE
REGION 8
DESIGNER
DRAWN
CHECKED
PROJECT NO.
DWG SHEET NO.
SHEET
D3
DRAWING TITLE
ARCHIVE NO.
SILT FENCING
DETAIL
DATE SIGNED
PROJECT NAME
OCALA NATIONAL
FOREST
NFSR 29 ROAD
REHABILITATION
CONSTRUCTION
PROJECT
SILT FENCE AS PERIMETER CONTROLEND POSTS DETAIL
END DETAIL
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
POSTS AT JOINTS
12467020R0064
ATTACHMENT 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
ELEVATION
PLAN
BACKFILLED AND COMPACTED
SOIL TO MATCH GROUND LEVEL
D
IR
E C
T
IO
N O
F R
U N
O F
F
F R
O M
D
IS
T U
R B
E D
A R
E A
S
EXCAVATE TRENCH 2"
LARGER THAN WATTLE
EXISTING GROUND (TYP.)
EXISTING GROUND
SEDIMENT WATTLE
F
I
O
P
E
STEP 1: EXCAVATE TRENCH AND
INSTALL SEDIMENT WATTLES
STEP 2: BACKFILL SOIL AGAINST
SEDIMENT WATTLES
FLOW DIRECTION
T O
E
O
F
F
I L
L
S
L O
P E
GENERAL NOTES:
1. DRIVE STAKES AT EACH END AND AT 4-FOOT
SPACING UNTIL WATTLE IS SECURE TO SLOPE. LIVE
STAKES MAY BE USED FOR PERMANENT
INSTALLATIONS. DO NOT CRUSH WATTLE WHILE
STAKING.
2. OVERLAP WATTLES 12-INCH MINIMUM. DRIVE
STAKES AT 6-INCHES FROM WATTLES END ANGLES
TOWARDS THE ADJACENT WATTLES AND SPACE
STAKES AT 4-FOOT MAX.
3. ALL SOIL EROSION CONTROL MEASURES ARE
COVERED IN PAY ITEM 15713.
SLOPE
SEDIMENT WATTLE
1"X1" OR 1"Ø WOOD STAKES. SEE NOTE 2
PLACE EXCAVATED MATERIAL ON
UPHILL SIDE OF SEDIMENT WATTLE
STAGGER JOINT (TYP.)
SLOPE
1"x1" WOOD STAKE
12"
24"
2" TO 3"
2"
SLOPE SPACING (FT)
1:4 OR FLATTER
1:3
1:2
1:1
STAKES REQUIRED
FOR EACH WATTLE
WATTLE LENGTH
(FT.)
STAKES REQUIRED
WATTLE SPACING
F
L
O
W
S
T
T
L
E
S
P
A
C
I
G
A
R
T
F
L
O
W
INSTALL WATTLES
ALONG CONTOURS
3" MIN. OR AS
SPECIFIED IN PLANS
RUNOFF FROM
DISTURBED AREAS
3" MIN.
DIRECTION OF RUNOFF
INSTALLATION BEYOND TOE OF SLOPE
PROPERLY STAKED AND ENTRENCHED SEDIMENT WATTLE
SEDIMENT WATTLE STAKING DETAIL
SEDIMENT WATTLE LAPPING DETAIL
INSTALLATION ALONG SLOPES
ALTERNATE SEDIMENT WATTLE JOINT DETAIL
SLOPE PROTECTION INSTALLATION
SEDIMENT WATTLE
12" MIN.
OVERLAP
D
I
R
E
C
T
I
R
N
O
F
F
United States Department of Agriculture
Forest Service
USDA FOREST SERVICE
REGION 8
DESIGNER
DRAWN
CHECKED
PROJECT NO.
DWG SHEET NO.
SHEET
D4
DRAWING TITLE
ARCHIVE NO.
SEDIMENT WATTLE
DETAIL
DATE SIGNED
PROJECT NAME
OCALA NATIONAL
FOREST
NFSR 29 ROAD
REHABILITATION
CONSTRUCTION
PROJECT
12467020R0064
ATTACHMENT 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| 1 TITLE SHEET_FSR 29-1 TITLE SHEET |
| Sheets and Views |
| 1 TITLE SHEET |
| 2 estimate of quantities |
| Sheets and Views |
| 2 |
| 3 Repair Schedule_FSR 29-NFSR 29 REPAIR SCHEDULE |
| Sheets and Views |
| NFSR 29 REPAIR SCHEDULE |
| 4 CULVERT AND DITCHING Block Detail |
| Sheets and Views |
| 4 culvert & ditching |
| 5 ROADWAY DETAILS |
| Sheets and Views |
| 5 |
| 6 Silt fencing detail |
| Sheets and Views |
| 6 Silt Fencing Detail |
| 7 WATTLES |
| Sheets and Views |
| 7 wattle |
File details come from the government source that posted it. Updated .