ATTACHMENT 1 - Schedule of Items.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- NFSR 29-0. 0 Road Construction Project (Amendment 2) Federal contract opportunity
- Solicitation number
- 12467020R0064
About this file
This document contains a schedule of items and related federal contract opportunity for a road rehabilitation construction project. The US Forest Service is seeking a contractor to perform work including erosion control, installation of new culverts, aggregate base spreading and compacting, roadbed reconditioning, ditch and cut slope excavation, lead off ditch construction, clearing and grubbing, and seeding and mulching. The project is located on National Forest System Road 29-0.0 near Salt Springs, Florida with a performance period of 120 days from notice to proceed. The estimated value of the contract is between $500,000 and $1,000,000, and payment and performance bonds will be required. This is a 100% total small business set-aside opportunity, with one firm fixed price contract to be awarded. The solicitation will be available on or around June 3, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2 to 12467020R0064 Site Visit Minutes.pdf | ||
| Amendment 2 to 12467020R0064 SF-30.pdf | ||
| Amendment 2 to 12467020R0064 Sign In Sheet.PDF | ||
| Amendment 1 to 12467020R0064 SF1442.pdf | ||
| Amendment 1 to 12467020R0064 SF-30.pdf | ||
| ATTACHMENT 4 - Specifications FSSS.pdf | ||
| 12467020R0064 SF1442.pdf | ||
| 12467020R0064 Solicitation Body.doc | DOC document | |
| ATTACHMENT 5 - DOL Wage Determination Marion Co FL20200176.pdf | ||
| ATTACHMENT 6 - Relevant Experience Questionaire.doc | DOC document | |
| ATTACHMENT 2 - Statement of Work_ OCA NFSR 29-0.0 (1).docx | DOCX document | |
| ATTACHMENT 3 - Planset Drawings_ OCA ERFO NFSR 29-0.0 (1).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor's Proposal
| 12467020R0064 | |||||||
| ATTACHMENT 1: SCHEDULE OF ITEMS | |||||||
| ERFO: NFSR 29-0.0 ROAD REHABILATION CONSTRUCTION PROJECT | |||||||
| CLIN | DESCRIPTION | METHOD OF MEASURE | PAY UNIT | QUANTITY | UNIT PRICE | TOTAL PRICE | |
| 0001 | Mobilization (Item: 15101) | ||||||
| Per ATTACHMENT 3 - Drawings | AQ | Lump Sum | 1.0 | $ - 0 | $ - 0 | ||
| 0002 | Soil Erosion & Pollution Control (Item: 15713) | ||||||
| Per ATTACHMENT 3 - Drawings | AQ | Lump Sum | 1.0 | $ - 0 | $ - 0 | ||
| 0003 | Clearing and grubbing, disposal method, (f) Scattering (Item 20102) | ||||||
| Per ATTACHMENT 3 - Drawings | CQ | *Acre | 10.10 | $ - 0 | $ - 0 | ||
| 0004 | Drainage Excavation, type Lead Off Ditch (Item 20423) | ||||||
| Per ATTACHMENT 3 - Drawings | CQ | *Cubic Yard | 144 | $ - 0 | $ - 0 | ||
| 0005 | Excavation, type Ditch With 1V:2H Cut Slope until Daylight (Item 20427) | ||||||
| Per ATTACHMENT 3 - Drawings | CQ | *Foot | 17023 | $ - 0 | $ - 0 | ||
| 0006 | Aggregate base, grading C (Base), compaction method C (Compacted in-place) (Item 30103) | ||||||
| Per ATTACHMENT 3 - Drawings | CQ | *Cubic Yard | 12045 | $ - 0 | $ - 0 | ||
| 0007 | Roadbed reconditioning, compaction method C (Item 30307) | ||||||
| Per ATTACHMENT 3 - Drawings | AQ | Mile | 7.17 | $ - 0 | $ - 0 | ||
| 0008 | 24, inch diameter pipe culvert, Metallic-Coated Corrugated Steel, 16 Gauge (Item 60201) | ||||||
| Per ATTACHMENT 3 - Drawings | AQ | Foot | 428 | $ - 0 | $ - 0 | ||
| 0009 | Seeding, Dry method (Item 62504) | ||||||
| Per ATTACHMENT 3 - Drawings | CQ | *Acre | 10.10 | $ - 0 | $ - 0 | ||
| 0010 | Mulching, Dry method (Item 62507) | ||||||
| Per ATTACHMENT 3 - Drawings | CQ | *Acre | 10.10 | $ - 0 | $ - 0 | ||
| TOTAL PROPOSAL | $ - 0 | ||||||
| Notes: | |||||||
| **AQ - DENOTES ACTUAL QUANTITIES PER FSSS SECTION 109.02 (q) These quantities are determined from measurements of completed work. | |||||||
| **CQ - DENOTES CONTRACT QUANTITIES PER FSSS SECTION 109.02 (b) Contract quantities will be adjusted only when there are errors in the original design of 15% or more. | |||||||
| NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. |