Atch_3_Drawings.pdf
PDF 3 MB Posted
- Attached to
- Construct Cane Gully Trail Bridge Federal contract opportunity
- Solicitation number
- 12467018R0110
About this file
Atch 3 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| scan0007.pdf | ||
| SF30.pdf | ||
| Attachment_4_Experience_Questionnaire.docx | DOCX document | |
| ATTACHMENT_5_DOL.pdf | ||
| Atch_2__Scope.doc | DOC document | |
| Atch_1_Schedule_of_Items.docx | DOCX document | |
| R0110.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
PROJECT SITE
VICINITY MAP:
SHEET OF
United States Department of Agriculture Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVER SHEET 6/27/2018
G-02 NOTES & SCHEDULE OF ITEMS 6/28/2018
C-01
EXISTING CONDITIONS AND SURVEY
CONTROL
6/XX/2018
C-02 PLAN & PROFILE 6/XX/2018
C-03
GEOSYNTHETIC REINFORCED SOIL
ABUTMENT STA 0+46.65
6/28/2018
C-04
GEOSYNTHETIC REINFORCED SOIL
ABUTMENT, STA 1+46.65
6/28/2018
C-05 TREATED TIMBER STAIR DETAILS 7/06/2018
C-06
TREATED TIMBER BACKWALL AND
BRACKET DETAILS
6/29/2018
C-07 TREATED TIMBER FACING DETAILS 6/28/2018
C-08
PRECAST CONCRETE SILL, EARTH
ANCHOR, AND TIMBER DETAILS
6/23/2018
C-09 STRAP & BEARING PAD DETAILS 6/23/2018
S-01
GENERAL NOTES FOR PREABRICATED
FRP TRAIL BRIDGE
6/23/2018
S-02 PREFABRICATED FRP TRAIL BRIDGE 6/23/2018
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
RHE STAFF OFFICER DATE
DATE
DIRECTOR OF ENGINEERING
DATE
DISTRICT RANGER DATE
7/1 0/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
CO
VE
R.
DW
G;
R8 - SOUTHERN REGION
FRANCIS MARION & SUMTER NATIONAL FOREST
CHARLESTON COUNTY
SOUTH CAROLINA
CANE GULLY TRAIL BRIDGE
FROM THE FRANCIS MARION RANGER DISTRICT
OFFICE, TRAVEL NORTHWEST 3.0 MILES ON STEED
CREEK ROAD. CONTINUE STRAIGHT ONTO SC-402 W
FOR AN ADDITIONAL 12.7 MILES. TURN RIGHT ONTO
CANE GULLY ROAD FOR 3.0 MILES. TURN RIGHT
ONTO CALLUM ROAD FOR 1.0 MILES TO THE NORTH
TRAIL HEAD OF THE PALMETTO TRAIL - SWAMP FOX
PASSAGE. PROCEED SOUTH ON THE TRAIL FOR 0.18
MILES TO THE BRIDGE SITE.
FRANCIS MARION DISTRICT OFFICE
2967 STEED CREEK ROAD
HUGER, SC 29450
CANE GULLY TRAIL BRIDGE
COORDINATES:
33° 12' 51" N, 79° 53' 39" W
FOREST SUPERVISOR DATE
ITEM 91104: TIE THE APPROACHES TO EXISTING GRADES ON BOTH SIDES OF THE BRIDGE AS SHOWN ON THE PLANS. ADJUST THE MOISTURE
CONTENT OF THE MATERIAL TO A MOISTURE CONTENT SUITABLE FOR COMPACTION. COMPACT EACH LAYER TO A MAXIMUM THICKNESS OF
6" WITH A MINIMUM OF THREE PASSES OR UNTIL VISUAL DISPLACEMENT CEASES USING A MECHANICAL TAMPER (WACKER-PACKER OR
APPROVED EQUAL). PLACEMENT OF THE IMPORTED BORROW IS INCLUDED IN THE PAY ITEM.
ALL BORROW IS TO BE IMPORTED FROM COMMERCIAL SOURCES. THE BORROW PAY ITEM DOES NOT INCLUDE MATERIAL USED TO BACKFILL
THE GEOSYNTHETIC REINFORCED SOIL ABUTMENT IN ITEM 96701.
ITEM 91124: WORK INCLUDES EXCAVATION AND EMBANKMENT CONSTRUCTION FOR THE TRAIL BRIDGE, GEOSYNTHETIC REINFORCED SOIL
ABUTMENT, AND BRIDGE APPROACHES. PLACE EXCESS EXCAVATION MATERIAL ON SITE AS DIRECTED BY C.O.R. COMPACT GROUND PER
ITEM 91104.
ITEM 91203: WORK INCLUDES CLEARING AND GRUBBING NECESSARY FOR THE CONSTRUCTION OF THE BRIDGE. ANY TREES THAT NEED TO
BE REMOVED SHALL BE DISPOSED OF ON SITE AS DESIGNATED BY THE CO. IF TREES ARE TO BE CUT BETWEEN APRIL 1 AND NOVEMBER 14, CONTRACTOR MUST NOTIFY THE CO 7 DAYS IN ADVANCE OF CUTTING.
ITEM 91306: AGGREGATE GRADING H (
" CRUSHED ROCK, AS DEFINED IN SPECIAL PROJECT SPECIFICATION 991), IS USED FOR THE TRAIL
SURFACING. COMPACTION METHOD PER ITEM 91104 SHALL BE USED FOR TRAIL SURFACING. AGGREGATE SOURCE IS AN UNDESIGNATED
COMMERCIAL SOURCE.
ITEM 93603: WORK INCLUDES FURNISHING OF ALL MATERIALS, FABRICATION, DELIVERY, ASSEMBLY, AND INSTALLATION OF A TREATED
TIMBER STAIRWAY. ITEM INCLUDES THE CONCRETE LANDING SLAB, CONCRETE FOOTINGS, WOOD STAIRS, AND RAILING.
ITEM 96502: WORK INCLUDES FURNISHING OF ALL MATERIALS, FABRICATION, DELIVERY, ASSEMBLY, AND INSTALLATION OF PRECAST
ONCRETE MUDSILLS AND EARTH ANCHOR SYSTEMS IN THEIR ENTIRETY PER FOREST SERVICE DESIGN CRITERIA LISTED IN THE PLANS AND
PER MANUFACTURER'S PLANS.
ESTIMATE OF QUANTITIES
ITEM NO. DESCRIPTION QUANTITY PAY UNIT
90701 MOBILIZATION 1 LUMP SUM
91104 BORROW 50 CUBIC YARD
91124 EXCAVATION 30 CUBIC YARD
91203
CLEARING AND GRUBBING, DISPOSAL
METHOD SCATTERING
1 LUMP SUM
91306
AGGREGATE BASE, GRADING H
5 CUBIC YARD
93603
STAIRWAY, TREATED TIMBER
1 LUMP SUM
96502 TRAIL BRIDGE SUBSTRUCTURE 1 LUMP SUM
96701
GEOSYNTHETIC REINFORCED SOIL
ABUTMENT
1 LUMP SUM
96802
PREFABRICATED TRAIL BRIDGE
SUPERSTRUCTURE, FRP TRUSS, LENGTH 100'
1 LUMP SUM
CONSTRUCTION NOTES:
THE CONTRACTOR SHALL CONFINE ALL OPERATION AND ACTIVITIES TO WITHIN THE CLEARING LIMITS, OR TO WITHIN 15 FEET OF
DEMOLISHED OR CONSTRUCTED STRUCTURES AND TRAILS, UNLESS OTHERWISE SHOWN ON DRAWINGS, OR APPROVED IN WRITING BY THE
C.O.R.
PLACE EXCESS AND/OR UNSUITABLE EXCAVATION AT AN AREA DESIGNATED BY THE C.O.R.
IN THE EVENT THAT PREVIOUSLY UNDISCOVERED CULTURAL RESOURCES ARE ENCOUNTERED DURING THE COURSE OF THE PROJECT, ALL
GROUND-DISTURBING ACTIVITIES WILL BE HALTED UNTIL EVALUATED BY A GOVERNMENT ARCHAEOLOGIST. IF NECESSARY, THE PROJECT
MAY BE MODIFIED IN ORDER TO PROTECT RESOURCES BEFORE WORK CONTINUES.
USE CONTAINMENT PADS UNDER EQUIPMENT IF IT WILL BE STORED OVERNIGHT NEAR THE WORK SITE TO REDUCE POTENTIAL
CONTAMINATION.
IF THE CONTRACTOR PLANS TO OPERATE EQUIPMENT IN THE STREAM, THE CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY
PERMITS. NO PERMIT IS REQUIRED FOR TRAMMING EQUIPMENT ACROSS THE STREAM.
THE GOVERNMENT WILL ONLY PROVIDE INITIAL HORIZONTAL AND VERTICAL CONTROL POINTS AND ALL NECESSARY INFORMATION RELATING
TO COORDINATES, LINES, ELEVATIONS, SLOPES, AND GRADES WHICH ARE FOUND IN DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR
ADDITIONAL CONTROL NECESSARY TO COMPLETE THE WORK PER SECTION 908 OF THE SPECIFICATIONS.
NOTIFY THE C.O. OF ANY MISSING CONTROL POINTS PRIOR TO STAKING FOR THE AFFECTED WORK. CONTRACTOR SHALL REPLACE ALL
DESTROYED OR DISTURBED INITIAL REFERENCE OR CONTROL POINTS NECESSARY TO WORK.
ITEM 96701: WORK INCLUDES FURNISHING OF ALL MATERIALS, FABRICATION, DELIVERY, ASSEMBLY, AND INSTALLATION OF THE GEOSYNTHETIC
REINFORCED SOIL ABUTMENT IN ITS ENTIRETY PER THE PLANS. ITEM INCLUDES BOTH THE GRS ABUTMENT AND REINFORCED SOIL
FOUNDATION AS DETAILED ON SHEETS C-03 AND C-04.
BACKFILL MATERIAL FOR THE ABUTMENTS IS INCLUDED IN THE PAY ITEM. ESTIMATED QUANTITY OF BACKFILL FOR THE PAY ITEM IS 39 CY.
BACKFILL MATERIAL SHALL MEET THE REQUIREMENTS OF OPEN GRADED MATERIAL AS DEFINED IN SPECIAL PROJECT SPECIFICATION 991.10
ITEM 96802: WORK INCLUDES FURNISHING OF ALL MATERIALS, FABRICATION, DELIVERY, ASSEMBLY, AND INSTALLATION OF THE FRP BRIDGE
SUPERSTRUCTUE IN ITS ENTIRETY PER THE PLANS.
THE BRIDGE SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH THE FOLLOWING CRITERIA:
PEDESTRIAN LIVE LOAD = 85 PSF
EQUESTRIAN LOAD = 1,600 LBS
VEHICLE LOAD = 10,000 LBS
GROUND SNOW LOAD = 50 PSF
WIND LOAD = 25 PSF
BRIDGE LENGTH = 100' - 0" (END TO END)
SPAN = 98'-5" (BEARING TO BEARING)
CLEAR SPAN = 96' - 8" (FACE OF BLOCKS TO FACE
OF BLOCKS
CLEAR WIDTH = 5' - 6" (SEE TYPICAL SECTION)
MAIN STRUCTURE = FRP THROUGH TRUSS, SQUARE
END.
DECKING = NO 2 SOUTHERN PINE, TREATED
RUNNING PLANKS = NONE
CURBS AND BRIDGE RAILS = NO CURBS OR ADA HANDICAP
RAILS WILL BE USED.
STEEL HARDWARE FINISH = HOT DIPPED GALVANIZED
COLOR = GREEN
ERECTION PLAN = TEMPORAY BENTS ARE NOT
ALLOWED FOR ERECTION.
PROJECT DESIGN CRITERIA:
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
DE
TA
IL
S.
DW
G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
NOTES & SCHEDULE
OF ITEMS
03/13/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
G-02
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CONTROL POINT TABLE
POINT # NORTHING EASTING ELEVATION DESCRIPTION
218 503921.3439 2338037.5349 28.35
CONTROL POINT
219 503942.6086 2337984.5180 28.87
CONTROL POINT
221 504068.0535 2338037.5539 25.17
CONTROL POINT
393 504027.9589 2338015.0840 20.01
CONTROL POINT
EXISTING WEIR
TO REMAIN
F
L
O
W
E
X
I S
T
I N
G
D
A
M
CONTROL POINT 218
CONTROL POINT 219
CONTROL POINT 221
CONTROL POINT 393
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 8/1
8 0 9:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
CI
VI
L3 D\
CA
NE
G
UL
LY
T
RA
IL
B
RI
DG
E.
DW
G;
R 8
SOUTHERN REGION
CANE GULLY
TRAILBRIDGE
INSTALLATION
FRANCIS MARION
AND SUMTER
NATIONAL FORESTS
FRANCIS MARION RANGER
DISTRICT
EXISTING CONDITIONS
AND SURVEY
CONTROL
06/27/2018
FS090523_R102013_L1-002.dwg
P. LANE
C-01
T. LAURENT
S. BINGHAM
T. LAURENT
S. BINGHAM
EDGE OF WATER
ON 3/28/2018
EDGE OF WATER
ON 3/28/2018
AutoCAD SHX Text
AutoCAD SHX Text 7.5'
AutoCAD SHX Text 15'
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text 7.5'
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
L
E V
A T
I O
N
F
E E
T
E L
E V
A T
I O
N
F
E E
T
0+00 0+50 1+00 1+50 1+80
-0.16%
-0.35%
.0
S T
B
E G
I N
S T
A
E
N D
E L
G R
A D
E
B
R E
K
S
T
E
G R
A D
E
B
R E
K
S
T
E
STA. 1+80
END TRAIL WORK
NEW PRESSURE TREATED
WOOD STAIRS WITH RAIL
AND CONCRETE FOOTINGS
7'1"Lx5'5"Wx5"T
CONCRETE PAD
GRADE NEW AGG. SURFACE
TRAIL TO MATCH TOP OF
CONCRETE PAD
ABUTMENT POINT TABLE
POINT # NORTHING EASTING ELEVATION DESCRIPTION
500 503968.3002' 2338038.6488' 25.00
BOT INSIDE WOOD FACE
501 503969.6162' 2338029.2403' 25.00
BOT INSIDE WOOD FACE
502 503961.1981' 2338028.0629' 25.00
BOT INSIDE WOOD FACE
503 503959.8821' 2338037.4713' 25.00
BOT INSIDE WOOD FACE
504 503964.5888' 2338028.7894' 29.12'
BOT OF CONCRETE ABUTMENT
505 503963.3420' 2338037.7029' 29.12'
BOT OF CONCRETE ABUTMENT
506 504057.4337' 2338051.1164' 23.92'
BOT INSIDE WOOD FACE
507 504065.8517' 2338052.2939' 23.92'
BOT INSIDE WOOD FACE
508 504058.7497' 2338041.7080' 23.92'
BOT INSIDE WOOD FACE
509 504067.1678' 2338042.8855' 23.92'
BOT INSIDE WOOD FACE
510 504063.7831' 2338042.6644' 28.96'
BOT OF CONCRETE ABUTMENT
511 504062.5363' 2338051.5779' 28.96'
BOT OF CONCRETE ABUTMENT
ESTIMATED ELEVATION 26.5'
Q100
STA. 0+09
START TRAIL WORK
MATCH EXISTING GRADE
EXISTING GROUND
TOP OF NEW
AGGREGATE SURFACE
TRAIL
CONSTRUCT TWO LAYERS OF
GEOTEXTILE WITH STRUCTURAL
FILL AT 6-INCH LIFTS
A
A
F
L
O
W
POINT (BOT INSIDE
WOOD FACE, TYP)
POINT (BOT OF CONCRETE
ABUTMENT, TYP)
NOTES:
1. INSTALL 6X6 TREATED TIMBERS ON FACE OF EARTH
WALL. TIMBERS SHALL BE LAID ON THEIR SIDES AND
NAILED TOGETHER. FABRIC FROM THE EARTH WALL
SHALL BE PLACED BETWEEN TIMBERS TO SECURE
TIMBERS TO WALL.
2. BACKFILL FOR FOUNDATION SHALL BE STRUCTURAL
BACKFILL . REMAINING FILL FOR TRAIL RAMPS UP TO
BRIDGE SHALL BE IMPORTED PIT RUN MATERIAL.
EMBANKMENT 45CY
FILL DAYLIGHT
PLAN
ELEVATION
SEC A-A
FILL W/ PITRUN
AT 2:1
6X6 PRESSURE TREATED
STACKED TIMBERS
BOTTOM OF NEW FOUNDATION
12"Hx20"Wx9'L
CONCRETE ABUTMENT
4X14 PRESS. TREATED
TIMBER BACKWALL
EXISTING GROUND
6'X3"THICK CRUSHED
AGG. SURFACE
6" THICK LIFTS FOR BOTTOM
TWO LAYERS, THEN 5.5" THICK
LIFTS TO BOTTOM OF CONCRETE ABUTMENT
NEW PRESSURE TREATED
WOOD STAIRS
STA. 1+80
END AGG. TRAIL
EDGE OF
NEW TRAIL
NEW CONCRETE
LANDING
2:1 FILL SLOPE
NEW 100'X6' FIBERGLASS
BRIDGE
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 8/1
8 0 9:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
CI
VI
L3 D\
CA
NE
G
UL
LY
T
RA
IL
B
RI
DG
E.
DW
G;
R 8
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION
AND SUMTER
NATIONAL FORESTS
FRANCIS MARION RANGER
DISTRICT
PLAN AND PROFILE
06/27/2018
FS090523_R102013_L1-002.dwg
P. LANE
C-02
T. LAURENT
S. BINGHAM
T. LAURENT
S. BINGHAM
EDGE OF WATER
ON 3/28/2018
INSTALL SIGN ("STAIRS") ON BRIDGE
IN ADVANCE OF STAIRS TO WARN
APPROACHING PEDESTRIAN OR
BICYCLIST
AutoCAD SHX Text
AutoCAD SHX Text 7.5'
AutoCAD SHX Text 15'
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text 7.5'
AutoCAD SHX Text
SCALE: 1' = 15'
AutoCAD SHX Text
SCALE: 1" = 15'
AutoCAD SHX Text
SCALE: 1' = 10'
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NOTES:
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE
WITH THE FOREST SERVICE STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF
TRAILS, 2014 EDITION.
HARDWARE AND STRUCTURAL STEEL: SEE NOTES & SCHEDULE OF ITEMS, SHEET G-02 FOR PROJECT
DESIGN CRITERIA AND GENERAL NOTES.
TIMBER FACING: SEE SHEET C-06, TREATED TIMBER FACING DETAILS,FOR ASSEMBLY DETAIL. SEE
SHEET C-07, PRECAST CONCRETE SILL, EARTH ANCHOR, AND DETAILS, FOR TIMBER COMPONENT
DIMENSIONS.
GEOTEXTILE: GEOTEXTILE SHALL MEET THE REQUIREMENTS OF SPECIAL PROJECT SPECIFICATION
994.01 (c)
EXCAVATE TO THE DEPTH OF ABUTMENT, SMOOTH AND COMPACT THE GROUND AT AN OPTIMUM
MOISTURE CONTENT WITH A VIBRATORY COMPACTOR. OPERATE COMPACTION EQUIPMENT OVER THE
FULL WIDTH OF THE FOUNDATION UNTIL VISIBLE DEFORMATION OF THE GROUND CEASES. FOUNDATION
SHALL BE LEVEL.
ANCHOR THE SYSTEM PER MANUFACTURER'S RECOMMENDATIONS.
BACKFILL THE REINFORCED SOIL FOUNDATION AND GRS ABUTMENT WITH AGGREGATE MEETING THE
REQUIREMENTS OF SPECIAL PROJECT SPECIFICATION 991.10 BACKFILL MATERIAL FOR GEOSYNTHETIC
REINFORCED SOIL ABUTMENT.
PLACE THE MATERIAL IN LIFTS THAT WILL COMPACT TO A DEPTH OF 6 INCHES FOR THE REINFORCED
SOIL FOUNDATION. USE VIBRATORY PLATE OR HAND ROLLER METHODS TO COMPACT THE SOIL.
PLACE THE MATERIAL IN LIFTS THAT WILL COMPACT TO A DEPTH OF 5.5" (THE DEPTH OF THE FACE
TIMBERS) FOR THE GRS ABUTMENT LAYERS. USE VIBRATORY PLATE OR HAND ROLLER METHODS TO
COMPACT THE SOIL.TRAIL BRIDGE SUBSTRUCTURE PLAN STA 0+46.65
NOT TO SCALE
6"
12"
9'-5"
NOT TO SCALE
12'-5"
10'-5"
11'-5"
12"
6"
3/4"x8-1/2" BRIDGE WEDGE
ANCHOR BOLT. (TYP. FOR Mk IV
BEARING PAD) (RED HEAD
WS-3484G OR APPROVED
EQUAL)
WEIR FACE ELEVATION
MK VI FACE TIMBER MK VIII
TIMBERS BETWEEN MK V
TIMBERS. SEE SHEET C-07
FOR DETAILS
REINFORCED SOIL FOUNDATION 12'-5"x11'-5"x 6"
BASE LAYERS WRAPPED IN GEOTEXTILE FABRIC.
3 LAYERS OF FABRIC REQUIRED
SEE NOTES SHEET G-02, AND THIS SHEET.
MK IX FACE TIMBER
MK VII FACE
TIMBER
GRS ABUTMENT (LAYERS WITH TIMBER
FACING)10'-5" X 9'-5" GEOTEXTILE (TYP.)
EDGES OF GEOTEXTILE SANDWICHED
BETWEEN FACING TIMBERS. GEOTEXTILE
EXTENDSTO OUTSIDE FACE OF TIMBERS. 8
LAYERS OF FABRIC REQUIRED. SEE NOTES
SHEET G-02 AND THIS PAGE
TIE DOWN ROD ASSEMBLY WITH FORESIGHT
PRODUCTS MANTA-RAY MR-88 EARTH ANCHOR
OR APPROVED EQUAL. 10'-6" RODS REQUIRED.
3/4"x5-1/2" WEDGE
ANCHOR BOLT. (TYP.)
(RED HEAD WS-3454G
OR APPROVED EQUAL)
MK I PRECAST CONCRETE
TRAIL BRIDGE SUPPORT SEE
SHEET C-07 FOR DETAILS
C-CHANNEL
STRAP (TYP.)
PLACE GEOTEXTILE FABRIC ON SOIL. WRAP OVER SIDES, ENCAPSULATING
THE LAYER, AFTER PLACING AND COMPACTING SUITABLE FILL MATERIAL
A
A'
NOT TO SCALE
SECTION A-A'WEIR SIDE
DIKE SIDE
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
17" 24-3/8"
24-3/8" 17"
1/2"X4-1/2" BEARING PAD WEDGE
ANCHOR BOLT. (TYP. Mk V
BEARING PAD) (RED HEAD
WS1242G OR APPROVED EQUAL.
MK IV BEARING PAD
MK V BEARING PAD
Mk V BEARING PAD
5' MINIMUM
5'-1 1/2"
1'-0"
1"
TRAIL BRIDGE BACKWALL ASSEMBLY
CONSISTING OF MK X TIMBER AND ANGLE
SUPPORT. SEE SHEET C-06 FOR DETAILS
DECK ELEVATION = 31.0 FT
APPROACH NOT SHOWN FOR
CLARITY, SEE SHEET C-02, PLAN
AND PROFILE
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 7/1
8 0 7:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
DE
TA
IL
S.
DW
G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
GRS ABUTMENT
STA0+46.65
06/28/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
C-03
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NOTES:
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE
WITH THE FOREST SERVICE STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF
TRAILS, 2014 EDITION.
HARDWARE AND STRUCTURAL STEEL: SEE NOTES & SCHEDULE OF ITEMS, SHEET G-02 FOR PROJECT
DESIGN CRITERIA AND GENERAL NOTES.
TIMBER FACING: SEE SHEET C-06, TREATED TIMBER FACING DETAILS,FOR ASSEMBLY DETAIL. SEE
SHEET C-07, PRECAST CONCRETE SILL, EARTH ANCHOR, AND DETAILS, FOR TIMBER COMPONENT
DIMENSIONS.
GEOTEXTILE: GEOTEXTILE SHALL MEET THE REQUIREMENTS OF SPECIAL PROJECT SPECIFICATION
994.01 (c)
EXCAVATE TO THE DEPTH OF ABUTMENT, SMOOTH AND COMPACT THE GROUND AT AN OPTIMUM
MOISTURE CONTENT WITH A VIBRATORY COMPACTOR. OPERATE COMPACTION EQUIPMENT OVER THE
FULL WIDTH OF THE FOUNDATION UNTIL VISIBLE DEFORMATION OF THE GROUND CEASES. FOUNDATION
SHALL BE LEVEL.
ANCHOR THE SYSTEM PER MANUFACTURER'S RECOMMENDATIONS.
BACKFILL THE REINFORCED SOIL FOUNDATION AND GRS ABUTMENT WITH AGGREGATE MEETING THE
REQUIREMENTS OF SPECIAL PROJECT SPECIFICATION 991.10 BACKFILL MATERIAL FOR GEOSYNTHETIC
REINFORCED SOIL ABUTMENT.
PLACE THE MATERIAL IN LIFTS THAT WILL COMPACT TO A DEPTH OF 6 INCHES FOR THE REINFORCED
SOIL FOUNDATION. USE VIBRATORY PLATE OR HAND ROLLER METHODS TO COMPACT THE SOIL.
PLACE THE MATERIAL IN LIFTS THAT WILL COMPACT TO A DEPTH OF 5.5" (THE DEPTH OF THE FACE
TIMBERS) FOR THE GRS ABUTMENT LAYERS. USE VIBRATORY PLATE OR HAND ROLLER METHODS TO
COMPACT THE SOIL.TRAIL BRIDGE SUBSTRUCTURE PLAN STA 1+46.65
NOT TO SCALE
6"
12"
9'-5"
NOT TO SCALE
12'-5"
10'-5"
11'-5"
12"
6"
3/4"x8-1/2" BRIDGE WEDGE
ANCHOR BOLT. (TYP. FOR Mk IV
BEARING PAD) (RED HEAD
WS-3484G OR APPROVED
EQUAL)
WEIR FACE ELEVATION
MK VI FACE TIMBER MK VIII
TIMBERS BETWEEN MK V
TIMBERS. SEE SHEET C-07
FOR DETAILS
REINFORCED SOIL FOUNDATION
12'-5"x11'-5"x 6" BASE LAYERS
WRAPPED IN GEOTEXTILE FABRIC.
3 LAYERS OF FABRIC REQUIRED
SEE NOTES SHEET G-02, AND THIS
SHEET.
MK IX FACE TIMBER
MK VII FACE
TIMBER
GRS ABUTMENT (LAYERS WITH TIMBER
FACING)10'-5" X 9'-5" GEOTEXTILE (TYP.) EDGES
OF GEOTEXTILE SANDWICHED BETWEEN
FACING TIMBERS. GEOTEXTILE EXTENDSTO
OUTSIDE FACE OF TIMBERS. 10 LAYERS OF
FABRIC REQUIRED. SEE NOTES SHEET G-02
AND THIS PAGE
TIE DOWN ROD ASSEMBLY WITH FORESIGHT
PRODUCTS MANTA-RAY MR-88 EARTH ANCHOR
OR APPROVED EQUAL. 10'-6" RODS REQUIRED.
3/4"x5-1/2" WEDGE
ANCHOR BOLT. (TYP.)
(RED HEAD WS-3454G
OR APPROVED EQUAL)
MK I PRECAST CONCRETE
TRAIL BRIDGE SUPPORT SEE
SHEET C-07 FOR DETAILS
C-CHANNEL STRAP (TYP.)
PLACE GEOTEXTILE FABRIC ON SOIL. WRAP
OVER SIDES, ENCAPSULATING THE LAYER,
AFTER PLACING AND COMPACTING SUITABLE
FILL MATERIAL
C
C'
MK IX FACE TIMBER
MK VII FACE TIMBER
NOT TO SCALE
SECTION C-C'
WEIR SIDE
DIKE SIDE
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
MK VII FACE TIMBER
MK IX FACE TIMBER
17" 24-3/8"
24-3/8" 17"
1/2"X4-1/2" BEARING PAD WEDGE
ANCHOR BOLT. (TYP. Mk V
BEARING PAD) (RED HEAD
WS1242G OR APPROVED EQUAL.
MK IV BEARING PAD
MK V BEARING PAD
Mk V BEARING PAD
5' MINIMUM
1"
6'-0 1/2"
1'-0"
TRAIL BRIDGE BACKWALL ASSEMBLY
CONSISTING OF MK X TIMBER AND ANGLE
SUPPORT. SEE SHEET C-06 FOR DETAILS
DECK ELEVATION = 30.9 FT.
TREATED TIMBER STAIRWAY NOT SHOWN
FOR CLARITY, SEE SHEET C-05, TREATED
TIMBER STAIRWAY, STA 1+46.65
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 7/1
8 0 7:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
DE
TA
IL
S.
DW
G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
GRS ABUTMENT
STA 1+46.56
06/28/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
C-04
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
CI
VI
L3 D\
C0 5_
TR
EA
TE
DT
IM
BE
RS
TA
IR
W
AY
T
HL
M
OD
.D
W G;
R8
SOUTHERN REGION
CANE GULLY
TRAIL BRIDGE
INSTALLATION
FRANCIS MARION
AND SUMTER
NATIONAL FORESTS
FRANCIS MARION RANGER
DISTRICT
TREATED TIMBER
STAIR DETAILS
07/06/2018
FS090523_R102013_L1-002.dwg
S.BINGHAM
S.BINGHAM
P.LANE
C-05
12"Ø
CONCRETE
FOOTING
SIMPSON CBS66
COLUMN BASE
12"Øx24" CONCRETE
FOOTING
2X2 BALUSTERS
@5" OC
2X8 TOP RAIL
2X6 CAP
2X8 RAIL
6X6 POST W/ 2X12 HEADER TO
SUPPORT STRINGERS MID-SPAN
AND 2X6 CROSS BRACING
SIMPSON LSCZ HANGER FOR
EACH STAIR STRINGER
ATTACH TO HEADER
2X12
STRINGER'S
SISTERED
6X6 POST WITH SIMPSON
CBS66 COLUMN BASE
4X4 POST ATTACHED
TO 6X6 TO FILL GAP.
ATTACH WITH GALVANIZED
" LAG SCREWS (4)
5" CONCRETE SLAB, PLACE WWF 6X6
W2.9 X W2.9 AT MID DEPTH OF SLAB
4" CRUSHED AGG. BASE
6X6 POST FOR
SUPPORT AND
RAILING
6X6 POST FOR
RAILING
6X6 POST
FOR
RAILING
4X4 POST
2X2 BALUSTERS
2X12 STRINGERS
(8) REQUIRED
4X14 BACKWALL
2X12 HEADER
ATTACHED TO
6X6 WALL W/
" LAG SCREWS
6X6 POST BOLTED TO 4X14 BACKWALL
2X12 SUPPORT HEADER
2X8 TREADS
(8) 2X12 STRINGERS
2X8 TREATED PLATE
W/
" DIAMETER ANCHOR
BOLT (2 PER SECTION)
LEAVE
" GAP
" OVERHANG
2X8 RAIL
2X6 CAP
6X6 POST
2X2 BALUSTER'S
@5" OC
"Ø GSP PAINTED
HAND RAIL, ATTACH TO EACH
6X6 POST WITH GSP FLOOR/CELING FLANGE,
THREADED NIPPLE AND TEE/ELBOWS. EXTEND
1 FOOT BEYOND END OF TREAD ON BOTTOM
END
NOTES:
1. ALL WOOD SHALL BE PRESSURE TREATED NO. 2 SOUTHERN PINE OR BETTER. SEE SHEET S-01 FOR
ACCEPTABLE TIMBER AND TREATMENTS.
2. ALL BOLTS, HANGERS, NAILS, CONNECTIONS, ETC. SHALL BE HOT DIP GALVANIZED.
3. ALL FIELD CUT WOOD ENDS SHALL BE TREATED WITH TWO COATS OF COPPER NAPHTHENATE PER
SHEET S-01
4. THE STAIRWAY IS SPLIT INTO AN UPPER STAIRWAY AND A LOWER STAIRWAY WITH THE BUTT JOINT
AT THE FACE OF THE TIMBER FACING WALL. THE RAIL IS CONTINUOUS OVER THE BUTT JOINT.
2X BLOCKING BETWEEN STRINGERS
SIMPSON DTT2Z TO CONNECT POSTS TO STRINGERS
SIMPSON DTT2Z TO
CONNECT POSTS TO
STRINGERS
2X BLOCKING BETWEEN
STRINGERS
" Ø BOLTS TO STRINGERS (2)
BOLT 6X6
RAIL POST
TO 4X14
W/
"Ø
BOLTS (2),
TYP
THICKEN CONCRETE
SLAB TO
9" UNDER 2X8
BASE PLATE AND
STRINGERS
THICKEN SLAB TO
9-INCHES UNDER
2X8 BASE PLATE
AND STRINGER
SIMPSON CBS66
COLUMN BASE
*RAIL ON OTHER SIDE IS IDENTICAL
TO THIS RAIL
2X6 PLATE
BETWEEN
STRINGERS
ATTACHED TO
6X6 TIMBERS
W/
" LAG SCREWS
*NOTE: ATTACH ALUMINUM SIGN TO END
OF BRIDGE (BLACK ON YELLOW W/ 4"
LETTERS) READING "STAIRS". FACE
SIGN SO THOSE LEAVING THE
BRIDGE WILL BE NOTIFIED IN
ADVANCE OF THE APPROACHING
STAIRS.
BUTT JOINT
LOCATION
SEE NOTE 4
12"Ø FOOTING AND SLAB TO BE POURED SEPARATELY.
PLACE EXPANSION BOARD BETWEEN FOOTING AND SLAB
2X BLOCKING
BETWEEN
STRINGERS
MANTA RAY EARTH
ANCHORS NOT SHOWN
FOR CLARITY.
POST LOCATION TO BE APPROX.
CENTERED ON THE TOTAL
LENGTH OF THE TWO STAIRWAYS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
ELEVATION VIEW SCALE: 1/4" = 1'
AutoCAD SHX Text
PLAN VIEW SCALE: 1/4" = 1'
AutoCAD SHX Text
STAIR DETAIL SCALE: 1" = 1'
DETAIL - CAP STAIRS SCALE: 1" = 1'
BACK WALL MOUNTING BRACKET DETAIL
NOT TO SCALE
BACK WALL FACE ELEVATION
BACK WALL PLAN
1" EDGE DISTANCE 1" EDGE DISTANCE
MK X BACK WALL PLANK
1" GAP
NOT TO SCALE
NOT TO SCALE
BACK WALL
MOUNTING
BRACKET
BACK WALL
MOUNTING
BRACKET
MK I PRECAST
CONCRETE TRAIL
BRIDGE SUPPORT
BRIDGE GIRDERS
1/2"Ø X 5" BOLT W/
(1) MALLEABLE IRON
WASHER AND (1)
CUT WASHER
1/2"X4-1/2" WEDGE ANCHOR
BOLT. (RED HEAD WS1242G OR
APPROVED EQUAL (TYP.)
MK X BACK WALL PLANK
BACK WALL
MOUNTING
BRACKET
MK I PRECAST CONCRETE
TRAIL BRIDGE SUPPORT
BRIDGE GIRDERS
TIMBER ABUTMENT AND TIMBER
DECK NOT SHOWN FOR CLARITY
TIMBER ABUTMENT NOT
SHOWN FOR CLARITY
BACK WALL
MOUNTING
BRACKET
BACK WALL
MOUNTING
BRACKET
DECK PLANKS
BRIDGE GIRDER
MK X BACK WALL PLANK
MK I PRECAST CONCRETE
TRAIL BRIDGE SUPPORT
BACK WALL END ELEVATION
NOT TO SCALE
TIMBER ABUTMENT AND NOT
SHOWN FOR CLARITY
PLAN VIEW SIDE VIEW ELEVATION
Mk XII ANGLE
Mk XI PLATE
Mk XI PLATE
Mk XII ANGLE
Mk XII ANGLE
Mk XI PLATE
1/4"
1/4"
1/4"
4 1/2"
2 1/2"
4"
2 3/4"4"
7 1/8"
7 1/8"
2 3/4"4"2 3/4"
3"3"3"
2 1/2"
4"
8"
2 3/4"4"
2 3/4"
4"
2 3/4"
3"
3"
3"
MK XII ANGLE
NOT TO SCALE 4 REQ'D
PLAN VIEW ELEVATIONSIDE VIEW
STEEL SHAPES SHALL MEET THE REQUIREMENTS OF AASHTO
M270 GRADE 36.
WELDING SHALL MEET THE REQUIREMENTS OF THE LATEST AWS
SPECIFICATIONS WITH THE WELDERS PREQUALIFIED.
ALL STRUCTURAL STEEL SHALL BE GALVANIZED PER AASHTO
M111-15 AFTER FABRICATION. REPAIRS TO GALVANIZING SHALL
MEET THE REQUIREMENTS OF ASTM A780.
MATERIALS NOT SPECIFICALLY NOTED IN THESE NOTES OR
SHOWN ON INDIVIDUAL DRAWINGS WILL BE SUBMITTED BY THE
CONTRACTOR FOR APPROVAL. ALL METHODS AND MATERIALS
SHALL CONFORM TO GOOD WORKMANSHIP, ACCEPTABLE
INDUSTRY STANDARDS, AND MANUFACTURER'S
RECOMMENDATIONS.
THE CONTRACTOR WILL SUBMITT EVIDENCE IN THE FORM OF
SPECIFICATIONS, MANUFACTURER'S DATA, OR OTHER
INFORMATION FOR ALL MATERIALS USED IN THE PROJECT
SUFFICIENT FOR THE C.O. TO VERIFY COMPLIANCE WITH THE
SPECIFICATIONS.
1.
2.
3.
4.
5.
SHEET NOTES:
L8X8X1/2
L8X8X1/2
L8X8X1/2
9/16" Ø (TYP.)
9/16" Ø (TYP.)
MK XI PLATE
NOT TO SCALE 4 REQ'D
3/8" PLATE
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
DE
TA
IL
S.
DW
G;
P. LANE
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
BACKWALL AND
BRACKET DETAILS
06/29/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
C-06
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NOT TO SCALE
TYPICAL TREATED TIMBER FACE WALL NAIL PATTERN
1-1/2" MIN.
SANDWICH GEOTEXTILE WRAPPING THE
GEOCELL FOUNDATION LAYERS BETWEEN
TIMBERS. EXTEND GEOTEXTILE TO THE
FACE OF THE TIMBERS.
90d GALVANIZED SPIKE (TYP.)
6"X6" S4S FACE
TIMBERS
CENTERLINE OF
FACE TIMBERS
90d SPIKE IN THE TIMBER
LAYER BELOW THE LAYER
SHOWN.
90d SPIKE. OFFSET A MINIMUM OF
1 1/2" FROM THE SPIKE IN THE
LAYER BELOW THE LAYER
SHOWN. PLACE A SPIKE IN EACH
CORNER OF THE CURRENT LAYER.
16" TO 20"
SPACING.
3" EDGE DISTANCE MINIMUM
NOT TO SCALE
TYPICAL TREATED TIMBER FACE WALL CORNER NAIL PATTERN
16" TO 20"
SPACING
NOTES:
DRILL PILOT HOLES 8" DEEP FOR THE 90d
GALVANIZED SPIKES.
OFFSET ADJACENT SPIKES A MINIMUM OF
1-1/2" LATERALLY.
PLACE 7 SPIKES PER FACE PLANK MINIMUM.
NOT TO SCALE
NAIL PATTERN FACE TIMBER LAYERS 1,3,5,7,9, AND 11
NOT TO SCALE
NAIL PATTERN FACE TIMBER LAYERS 2, 4, 6, 8, AND 10
MK IX TIMBER
MK IX TIMBER
MK VI TIMBER
MK VI TIMBER
18" NAIL SPACING
(TYP. MK IX TIMBER)
18" NAIL SPACING
(TYP. MK VI TIMBER)
20" NAIL SPACING
(TYP. MK VII TIMBER)
16" NAIL SPACING
(TYP. MK VIII TIMBER)
MK VII TIMBER.
MK VII TIMBER.
MK VIII TIMBER.
MK VIII TIMBER.
90D GALVANIZED SPIKE (TYP.)
MK I PRECAST CONCRETE SILL
MK I PRECAST CONCRETE SILL
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
DE
TA
IL
S.
DW
G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCISS MARION RANGER
DISTRICT
TIMBER FACE WALL &
APPROACH DETAILS
6/28/2018/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
C-07
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
CONCRETE BRIDGE SUPPORTS SHALL BE 4500 PSI CLASS A CONCRETE AS PER FP-14,
MAX WATER/CEMENT RATIO OF 0.45 AND AIR ENTRAINED AT 4.5-7.5%.
#4 DEFORMED GRADE 60 REBAR, 3 INCHES FROM SIDES, TOP AND BOTTOM, APPROX. 12
INCHES O.C. BRACE PIECES (TYP).
INSTALL FOUR LIFTING HOIST RINGS IN A CAST IN CONCRETE FERRULE FOR EACH
FOUNDATION,
ESTIMATED WEIGHT: 2250 POUNDS PER SECTION
1.
2.
3.
4.
PRECAST CONCRETE TRAIL BRIDGE SUPPORT NOTES:
MK I PRECAST CONCRETE TRAIL BRIDGE SUPPORT
108"
36" 36"
20"
3"
3"
LIFTING HOIST RINGS ON SIDE OF UNITS, 4
PER SECTION TO BE DESIGNED BY
CONTRACTOR. AFTER BRIDGE INSTALLATION
FILL EPOXY GROUT IN LIFT RING CUPS.
10"
3"
36"
5"
PLAN VIEW
12"
NOT TO SCALE 2 REQ'D
3"
ELEVATION SIDE VIEW
# 4 REBAR
4"
NOT TO SCALE
TIE DOWN ROD ASSEMBLY
Q/2"Ø X 2" FENDER WASHER
1/2"Ø SPRING LOCK WASHER
&1/2"-13 NC HEX NUT. (TYP.)
hOT DIP GALVANIZED
1/2"-13NC HOT DIP GALVANIZED
ALL THREAD ROD
8 AT 10'-6" REQUIRED
AND 8 AT 9'-6" REQUIRED
FORESIGHT PRODUCTS
MANTA-RAY MR-88 EARTH ANCHOR
OR APPROVED EQUAL
MK VI FACE TIMBER
NOT TO SCALE 9 REQ'D
MK VIII FACE TIMBER
NOT TO SCALE 9 REQ'D
MK VII FACE TIMBER
NOT TO SCALE 9 REQ'D
MK IX FACE TIMBER
NOT TO SCALE 9 REQ'D
9'-6"
10'-5"
9'-5"
8'-6"
6X6 S4S TREATED
SOUTHERN PINE NO 2.
6X6 S4S TREATED
SOUTHERN PINE NO 2.
6X6 S4S TREATED
SOUTHERN PINE NO 2.
6X6 S4S TREATED
SOUTHERN PINE NO 2.
MK X BACK WALL TIMBER
NOT TO SCALE 2 REQ'D
11'
4X14 S4S TREATED
SOUTHERN PINE NO 2.
1'-2 1/2"
1'-8 1/2"
1'-2 1/2"
1'-8 1/2"
4 1/2"
8 1/2"
TOP OF DECK
4 3/4"
13 1/4"
5/16"Ø HOLES (TYP.)
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
DE
TA
IL
S.
DW
G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
PRECAST CONCRETE
SILL, EARTH ANCHOR,
TIMBERS DETAILS
06/23/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
C-08
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
MK II CHANNEL
NOT TO SCALE 16 REQ'D
9 1/2"
6"
3-1/2"
MK III ANGLE
NOT TO SCALE 16 REQ'D
13/16" HOLE
(TYP.)
3"
2-1/2"1-5/8"
2-3/4"
4" 1-1/4"
1-3/4"
9/16" HOLE
PLAN VIEW
ELEVATIONSIDE VIEW
L4X3X1/2
6"
3"
Mk III CHANNEL
Mk IV ANGLE
1/4"
4"
C-CHANNEL STRAP DETAIL
NOT TO SCALE
Mk III CHANNEL
Mk IV ANGLE
PLAN VIEW
ELEVATION SIDE VIEW
STEEL SHAPES SHALL MEET THE REQUIREMENTS OF AASHTO M270 GRADE 36.
WELDING SHALL MEET THE REQUIREMENTS OF THE LATEST AWS SPECIFICATIONS WITH
THE WELDERS PREQUALIFIED.
ALL STRUCTURAL STEEL SHALL BE GALVANIZED PER AASHTO M111-15 AFTER
FABRICATION. REPAIRS TO GALVANIZING SHALL MEET THE REQUIREMENTS OF ASTM
A780.
MATERIALS NOT SPECIFICALLY NOTED IN THESE NOTES OR SHOWN ON INDIVIDUAL
DRAWINGS WILL BE SUBMITTED BY THE CONTRACTOR FOR APPROVAL. ALL METHODS
AND MATERIALS SHALL CONFORM TO GOOD WORKMANSHIP, ACCEPTABLE INDUSTRY
STANDARDS, AND MANUFACTURER'S RECOMMENDATIONS.
THE CONTRACTOR WILL SUBMITT EVIDENCE IN THE FORM OF SPECIFICATIONS,
MANUFACTURER'S DATA, OR OTHER INFORMATION FOR ALL MATERIALS USED IN THE
PROJECT SUFFICIENT FOR THE C.O. TO VERIFY COMPLIANCE WITH THE SPECIFICATIONS.
1.
2.
3.
4.
5.
SHEET NOTES:
Mk III CHANNEL Mk IV ANGLE
MK V BEARING PAD
NOT TO SCALE 2 REQ'D
13/16" DIA. HOLE (TYP.)
FOR BRIDGE ANCHOR
BOLTS.
15"
6"
MK IV BEARING PAD
NOT TO SCALE 4 REQ'D
12"
TRAIL SIDE
1/2" THICK UHMW
50 DUROMETER
20"
1-13/16"8-3/8"1-13/16"
STREAM SIDE
15"
6"
12"
TRAIL SIDE
1/2" THICK UHMW
50 DUROMETER
20"
1-13/16"8-3/8"1-13/16"
STREAM SIDE
9/16" DIA HOLE (TYP.)
FOR 1/2" ANCHOR
BOLTS.
L4X3X1/2
L4X3X1/2
C3X6
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
DE
TA
IL
S.
DW
G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
STRAP AND BEARING
PAD DETAILS
06/23/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
C-09
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
GENERAL NOTES
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN
ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) AND STANDARD
SPECIFICATION FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL
PROJECTS.
PREFABRICATED FRP BRIDGE SUPERSTRUCTURE: PREFABRICATED FRP
SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT
SHOWN ON THE DRAWINGS. THE BRIDGE SHALL MAINTAIN THE CLEARANCES ABOVE
HIGH WATER INDICATED ON THE BRIDGE ELEVATION. THE BRIDGE CROSS-SECTION
SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE CLEAR WIDTH
AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTION, OR IN THE
DESIGN CRITERIA. THE CONTRACTOR SHALL DETERMINE THE TRUSS HEIGHT AND THE
LOCATION OF THE DECK WITH RESPECT TO THE TOP AND BOTTOM CHORDS (U FRAME
VS. H FRAME). OVERHEAD LATERAL BRACING IS UNACCEPTABLE. ALL RELATED
DETAILS SUCH AS PROFILE, ABUTMENT DETAILS, BEARINGS, AND TIMBER DECKING
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FINALIZE AND CONSTRUCT.
THE PREFABRICATED FRP BRIDGE SUPERSTRUCTURE, AND ASSOCIATED DETAILS
INCLUDING TIMBER COMPONENTS SHALL BE UNDER THE DIRECTION OF A REGISTERED
PROFESSIONAL ENGINEER. THE COMPLETED DESIGN, DRAWINGS, AND SPECIFICATION
PACKAGE SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND
APPROVAL.
THE DESIGN OF ALL PREFABRICATED FRP BRIDGE SUPERSTRUCTURE ELEMENTS SHALL
COMPLY WITH THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF FRP
PEDESTRIAN BRIDGES, CURRENT EDITION, THE LRFD GUIDE SPECIFICATIONS FOR THE
DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION, AND THE AASHTO LRFD BRIDGE
DESIGN SPECIFICATIONS, CURRENT EDITION. PROVIDE CAMBER FOR 100% OF THE DEAD
LOAD DEFLECTIONS PLUS 1% OF BRIDGE SPAN. SUBMIT SHOP DRAWINGS AND
CALCULATIONS FOR APPROVAL. SHOP DRAWINGS AND CALCULATIONS MUST BE
APPROVED BEFORE FABRICATION.
MEMBER COMPONENTS: ALL MEMBERS SHALL BE FABRICATED FROM FRP COMPOSITE
PROFILES AND STRUCTURAL SHAPES AS REQUIRED. ALL FRP COMPOSITE PROFILES
AND SHAPES SHALL BE MANUFACTURED USING A FIRE RESISTANT RESIN. ALL
INDIVIDUAL COMPONENTS MUST WEIGH LESS THAN 115 LBS TO ALLOW FOR TRANSPORT
OVER ROUGH TERRAIN AND ASSEMBLY AT A REMOTE LOCATION.
ERECTION PLAN: THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE
PREFABRICATED FRP BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS
BEFORE ERECTION IS SCHEDULED. IF ALLOWED UNDER THE PROJECT DESIGN
CRITERIA, TEMPORARY IN-STREAM SUPPORT BENTS MAY BE USED FOR THE ERECTION
OF THE PREFABRICATED FRP BRIDGE SUPERSTRUCTURE. THE IN-STREAM BENTS
SHALL BE CRIBBING, SILLS, CONCRETE BLOCKS, OR OTHER SUPPORTS AND SHALL BE
PLACED WITH MINIMAL DISTURBANCE WITHIN THE STREAM. ALL MATERIALS TO
CONSTRUCT THE TEMPORARY IN-STREAM BENTS SHALL BE REMOVED. THE
SUBMITTALS SHALL INCLUDE THE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS,
METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS, AND ERECT
THE NEW PREFABRICATED FRP SUPERSTRUCTURE.
HARDWARE AND STRUCTURAL STEEL: SEE PROJECT DESIGN CRITERIA FOR STEEL
HARDWARE FINISH. GALVANIZED OR UNFINISHED HARDWARE SHALL MEET THE
REQUIREMENTS OF AASHTO M270, GRADE 36, WITH NUTS AND BOLTS CONFORMING TO
ASTM A307, GRADE A. USE MALLEABLE IRON WASHERS AGAINST WOOD UNLESS
OTHERWISE NOTED.
TIMBER AND LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE
REQUIREMENTS OF THE GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE
SPECIFIED BELOW.
DECK PLANKS AND BRACING PLANKS
-- SOUTHERN PINE NO. 2, S4S, GRADING RULES AGENCY - SPIB
RUNNING PLANKS AND RUB RAIL:
-- SOUTHERN PINE NO. 2 GRADE, ROUGH SAWN,GRADING RULES AGENCY - SPIB
RAILS, HANDRAILS UNTREATED:
-- BALDYCYPRESS, S4S, NO. 1 GRADE, GRADING RULES AGENCY - SPIB
-- WHITE OAK, S4S, SELECT STRUCTURAL GRADE, GRADING RULES AGENCY -
NELMA
TREATED:
-- SOUTHERN PINE, S4S, NO. 2 GRADE, GRADING RULES AGENCY - SPIB
TREATMENT: SEE PROJECT CRITERIA FOR MEMBERS IDENTIFIED TO BE TREATED AND
FOR TREATMENT TYPE. PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH
THE CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS
USING THE TREATMENT MATERIALS BELOW. TREATMENT WILL COMPLY WITH THE
CURRENT EDITION OF THE WESTERN WOODS PRESERVERS INSTITUTE (WWPI) BEST
MANAGEMENT PRACTICES FOR THE USE OF WOOD IN AQUATIC ENVIRONMENTS.
DECKING, RUNNING PLANKS, IF TREATED:
-- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE
GROUND - EXPOSED (UC3B).
-- PENTACHLOROPHENOL IN LIGHT OIL (TYPE C SOLVENT)
-- COPPER NAPTHANATE (CuN) IN LIGHT OIL (TYPE C SOLVENT)
SILLS, BACKING PLANKS, CRIBS, TIMBER WALLS IF TREATED:
-- AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4B GROUND
CONTACT - HEAVY DUTY (UC4B).
--PENTACHLOROPHENOL IN HEAVY OIL (TYPE A SOLVENT)
-- COPPER NAPTHANATE (CuN) IN HEAVY OIL (TYPE A SOLVENT).
FIELD TREATMENT: COPPER NAPTHANATE (2% SOLUTION) SHALL BE FURNISHED FOR
TREATING OF WOOD . ALL ABRASIONS AND FIELD CUTS - APPROVED BY THE C.O.R -
SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD
TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS
REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING
THE FASTENERS.
TIMBER FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS
(EXCEPT TIMBER RUNNING PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS
FOR ALL CUT OR BORED TIMBER. FIELD DRILLING OF HOLES SHALL NOT BE ALLOWED
UNLESS OTHERWISE NOTED ON THE PLANS.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
SU
PE
RS
TR
UC
TU
RE
.D
W G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
GENERAL NOTES FOR
PREFABRICATED FRP
TRAIL BRIDGE
06/23/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
S-01
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 6/1
8 1 5:
T
HL
AU
RE
NT
C :\U
SE
RS
\T
HL
AU
RE
NT
\D
OC
UM
EN
TS
\E
TS
R
EG
IO
N
8\2
7 F
RA
NC
ES
M
AR
IO
N
ER
FO
\C
AN
E
GU
LL
Y\
DR
AW
IN
GS
\C
AN
E_
GU
LL
Y_
SU
PE
RS
TR
UC
TU
RE
.D
W G;
R08
SOUTHERN REGION
CANE GULLY TRAIL
BRIDGE INSTALLATION
FRANCIS MARION &
SUMTER NATIONAL
FORESTS
FRANCIS MARION RANGER
DISTRICT
PREFABRICATED FRP
TRAIL BRIDGE
06/23/2018
FS090523_R102013_L1-002.dwg
T. LAURENT
T. LAURENT
P. LANE
S-02
1313TYPICAL TRUSS SECTION
TYPICAL ELEVATION
NOTES
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
CROSSPIECE, EXTEND BEYOND THE RAILS FOR OUTRIGGER IF NECESSARY
AutoCAD SHX Text
OUTRIGGER USE IF NECESSARY FOR RAIL STABILITY
AutoCAD SHX Text
POST
AutoCAD SHX Text 3x12 PRESSURE TREATED SOUTHERN YELLOW PINE DECKING
AutoCAD SHX Text
INTERMEDIATE RAILS
AutoCAD SHX Text
PROVIDE ADA HANDRAIL WHERE REQUIRED SEE PROJECT DESIGN CRITERIA, SHEET 2 OF 10
AutoCAD SHX Text 2"x8" MIN. ROUGH SAWN RUNNING PLANKS SEE PROJECT CRITERIA
AutoCAD SHX Text
TOE PLATE
AutoCAD SHX Text
1 1/2" BLOCK OUT
AutoCAD SHX Text
POST
AutoCAD SHX Text 2x6 S4S HANDRAIL. RADIUS TOP EDGE AS SHOWN. BLOCK OUT 1 1/2" FOR KNUCKLE CLEARANCE BETWEEN RAILING AND TRUSS MEMBERS. ALTERNATE HANDRAIL CONFIGURATIONS MAY BE SUBMITTED TO THE C.O. FOR REVIEW AND APPROVAL.
AutoCAD SHX Text
STRINGER
AutoCAD SHX Text
SPACER
AutoCAD SHX Text
HORIZONTAL BRACE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
C BEARING
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text FASTEN RUNNNG PLANKS TO THE DECK WITH 30d (4-1/2 INCH RING SHANK NAILS) AT 24" SPACING. ALTERNATE SIDES WITH TWO AT EACH END. DO NOT FASTEN PLANKS DIRECTLY OVER FRP MEMBERS
AutoCAD SHX Text
OUTRIGGER PLATE
AutoCAD SHX Text
C BEARING
| 01_Cane_Gully_Cover |
| Sheets and Views |
| 17x11 EXPANDED |
| 02_Cane_Gully_Notes |
| Sheets and Views |
| Notes |
| 03_Cane_Gully_Existing_Conditions |
| Sheets and Views |
| C01 |
| 04_Cane_Gully_Plan_and_Profile |
| Sheets and Views |
| C02 |
| 05_Cane Gully_Abutment_Sta_0+46 |
| Sheets and Views |
| Near Abutment |
| 06_Cane Gully_Abutment_Sta_1+46 |
| Sheets and Views |
| Far Abutment |
| 07_Cane_Gully_Treated Timber Stairway |
| Sheets and Views |
| C05 |
| 08_Cane_Gully_Timber_Backwalll_Details |
| Sheets and Views |
| Back wall details |
| 09_Cane_Gully_Timber_Facewall_Details |
| Sheets and Views |
| Timber Facewall |
| 10_Cane Gully_precast concrete |
| Sheets and Views |
| Concrete_Support_Details |
| 11_Cane_Gully_Strap_Details |
| Sheets and Views |
| strap details |
| 12_Cane_Gully_Superstructure Notes |
| Sheets and Views |
| General Notes |
| 13_Cane_Gully_Superstructure_Profile_and_Section |
| Sheets and Views |
| Superstructure |
File details come from the government source that posted it.