Site Survey Questions 12445524Q0021 (240207).pdf
PDF 1 MB Posted
- Attached to
- FPL Building #1 Carpet Replacement
- Solicitation number
- 12445524Q0021
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains site survey questions for a federal contract opportunity to replace carpeting on the third floor of Building One at the Forest Products Laboratory. The scope of work involves removing and replacing carpet tiles in specified areas of the third floor, preserving the existing wood baseboard and shoe where possible, and using low profile vinyl transitions between carpeted areas and adjoining offices. Contractors are asked to note any exceptions to a desired completion date of February 26, 2024 in their responses. The work must be performed outside of normal business hours to minimize disruption. A building floor plan and carpet color preference are available upon request.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd 01 12445524Q0021 (240209).pdf | ||
| A2_STATEMENT OF WORK (240110).docx | DOCX document | |
| 12445524Q0021 (Sections B-M).pdf | ||
| 12445524Q0021 (SF 1442).pdf | ||
| Directions to Lab 1.pdf | ||
| A1 SCHEDULE OF ITEMS (240130).docx | DOCX document | |
| A3_Wage Rates (240112).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Products Laboratory
Building One, Third Floor Carpet Replacement Site Survey Questions
1. What is Paul Boucher’s role in this process?
Paul oversees the contract, and all submissions will go through him.
2. Will the adjoining offices be included in the es�mate?
No, the adjoining offices are not included in the scope of work.
3. What is the floor underneath the exis�ng carpet made of?
The underlying floor is concrete.
4. Where will the carpet stop in the North Hallway?
The carpet in the North Hallway will end at the fire doors.
5. What style of transi�ons are wanted between the hallway carpet and the adjoining offices?
Low Profile Vynal
6. Will the VCT floor near the freight elevator be replaced with carpet?
No, the VCT floor will be le� as it currently is.
7. Will the desired carpet be in �le form?
Yes, per the scope of work document, the replacement carpet will be carpet �les.
8. When was the current carpet installed?
It was awarded in August of 2007 and completed in October, 2008.
9. What is the �meline for the comple�on of the job, to include lead �me for materials?
10. Will the work be performed outside of normal business hours?
Yes, per the scope of work document, the work will be accomplished outside of normal business hours to limit adverse impact on the Laboratory.
11. Where did the original es�mate measurements come from?
Carpet measurements came from our market research
12. Did the original es�mate measurements account for projected waste?
No
13. Will the original baseboard and shoe be re-used or replaced?
Per the scope of work document, the exis�ng wood baseboard and shoe shall be preserved; it will be removed and re-installed where necessary and worked around without removal where possible.
14. Is there a building floor plan available?
Yes, there is a building floor plan available upon request.
15. I s there a carpet color preference?
Yes. Manufacturer – Interface (The Standard) #9359 Guava)
Text1: The desired completion date for the entire project is 2/26/2024, as listed on the SF-1442. If that target is unachievable, than contractors are requested to annotate their schedule of items (in the space provided for exceptions) with the necessary lead-time, and resulting projected completion date. If the Forest Service is unable to obtain a fair & reasonable price to complete the project by the 2/26/2024 target; then we will consider the trade-offs associated with accepting a later completion date.