Amendment 0001.pdf

PDF 1 MB Posted

Attached to
Monongahela National Forest FR209 AOP Replacement Federal contract opportunity
Solicitation number
12445523B0006
Issued by
Department of Agriculture Forest Service

About this file

This document is an amendment to a solicitation for structure removal and rehabilitation services on National Forest lands. The United States Department of Agriculture Forest Service is seeking bids to remove an existing structure and rehabilitate adjacent lands on Red Run in the Monongahela National Forest in West Virginia. Construction drawings depicting the existing conditions and proposed work are incorporated into the solicitation. Bidders must acknowledge receipt of the amendment by the specified date and time. The period of performance for the work is from October 2, 2023 to June 28, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Monongahela National Forest FR209 AOP Replacement, newest first.
File Type Posted
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Monongahela National Forest FR209 AOP Replacement QA 230913.pdf PDF
FR209 Pre-Bid QA.pdf PDF
12445523B0003PreBidQandA.docx DOCX document
12445523B0006 Solicitation.pdf PDF
FR209_Plans_signed.pdf PDF
RedRun.LRP-2022-0309 Location Map.pdf PDF
RedRun.LRP-2022-0309 NWP-14 Verification Letter-signed.pdf PDF
Limits of Disturbance Plan.pdf PDF
Red Run - 100 pct Supplemental Specs.pdf PDF
Wage Determination.pdf PDF
Bridge Inspection Report.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12445523B0006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309-2449

STE 876S

1720 PEACHTREE ST NW

USDA-FS CSA EAST 13

08/18/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/18/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This Amendment incorporates the following 1 page of construction drawings into Section J., and relates to structure removal and rehabilitation of the immediately adjacent lands.

Period of Performance: 10/02/2023 to 06/28/2024

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

SHAWN M. LACINA

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

CP62

B-2

35443546

3547 3550

25' MIN. CHANNEL WIDTH

PROPOSED

STRUCTURE

STA. 10+00

LEGEND

DRILL HOLE CONTROL POINT

TREE LINE

EDGE OF GRAVEL

RIGHT OF WAY

PROPOSED EXISTING

EDGE OF BIT

RIPRAP

PROPERTY OWNER:

MONONGAHELA NATIONAL

FOREST

R

E

D

R

U

N

F

R

D

U

N

S

H

A

V

E

S

F

O

R

K

PROPERTY OWNER:

MONONGAHELA NATIONAL

FOREST

PROPERTY OWNER:

MONONGAHELA NATIONAL

FOREST

PROPERTY OWNER:

MONONGAHELA

NATIONAL FOREST

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

9/5 /23

:0

0 Z

AC

HA

RY

BA

RT

LE

Y C :\U

SE

RS

\Z

AC

HA

RY

BA

RT

LE

Y\

DO

W

NL

OA

DS

\F

R2

-0 .2

RE

D

RU

N

- H

IS

E

CO

PY

8.

.23

.D W

G

EASTERN REGION

FR 209-0.2

OVER

RED RUN

MONONGAHELA

NATIONAL FOREST

GREENBRIER

RANGER DISTRICT

STRUCTURE

REMOVAL

5/11/2022

G.JUNTTILA

J.ALLEN

S. WRIGHT

U28-01575

C-05B

24 5B

STRUCTURAL REMOVAL PLAN

NOT TO SCALE

GENERAL NOTES:

1. THE CONTRACTOR SHALL LOCATE ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO

STARTING WORK AND SHALL CONDUCT HIS OPERATIONS IN SUCH A MANNER AS TO

ENSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE

DISTURBED. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES FOR

TEMPORARY AND PERMANENT RELOCATIONS FOR CONSTRUCTION OPERATIONS

SUCH THAT UTILITIES DO NOT INTERFERE WITH THE TEMPORARY OR PERMANENT

WORK TO BE COMPLETED.

2. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR

MAKING HIS OWN DETERMINATION OF WATER LEVELS THAT WILL EXIST DURING

CONSTRUCTION.

3. MEASURES SHALL BE TAKEN TO PREVENT DEBRIS FROM FALLING FROM THE

EXISTING OR PROPOSED STRUCTURE. IF DEBRIS FALLS INTO THE WATERWAY IT

SHALL BE REMOVED WITHIN 24 HOURS.

4. INSTALL THE SPECIFIED QUANTITY OF ROLLED EROSION CONTROL PRODUCT

(EMAT) AND THEN ANY ADDITIONAL AREAS THAT ARE DISTURBED BY THE

CONTRACTOR SHALL BE SEEDED AND MULCHED UNDER THE LUMP SUM PAY ITEMS.

5. COORDINATE SYSTEM REFERS TO NAD83 WEST VIRGINIA STATE PLAINS, SOUTH

ZONE. DATUM REFERS TO NAVD88.

6. REFERENCE POINTS "A" AND "B" REFER TO FINISH GRADE AT CENTERLINE AT THE

BACK FACE OF THE ABUTMENT BACK WALLS.

7. PROVIDE SMOOTH TRANSITION FROM EXISTING TO PROPOSED ROADWAY AT

REFERENCE POINTS "C" AND "D". FADE OR EXTEND PROFILE SLIGHTLY AS

REQUIRED.

8. SURVEY WAS COMPLETED BY KELLY SURVEYING FOR THIS PROJECT ON 9-22-2021.

9. ALL TREE REMOVAL TO BE INCIDENTAL TO CLEARING AND GRUBBING, DISPOSAL

METHOD A.

STRUCTURE REMOVAL:

FOLLOW ALL SPECIFICATIONS FOR REMOVAL OF STRUCTURE,

STRUCTURE REMOVAL PLAN SUBMITTAL REQUIREMENTS,

REQUIREMENTS TO EXCAVATE TO NATURAL STREAM BOTTOM,

AS WELL AS BACKFILLING VOIDS LEFT BY EXISTING

STRUCTURAL COMPONENTS TO BE REMOVED. RIPRAP

STREAMBANK STABILIZATION SHOWN ON THE PLANS AS WELL

AS RIPRAP PLACEMENT ON TOP OF FILL SLOPE ON ROAD PRISM

IS INCIDENTAL TO "ITEM 0001AE, 20304 - REMOVAL OF OLD

STRUCTURE, DISPOSAL METHOD A". INSTALL RIPRAP TO DEPTH

OF 1.5 TIMES THE NOMINAL SIZE OF CLASS IV AT A MINIMUM.

AREAS DISTURBED BY REMOVAL ACTIVITIES THAT ARE NOT TO

RECEIVE RIPRAP COVER SHALL BE SEEDED AND MULCHED.

REDLINES BY USFS

EXISTING STRUCTURE

TO BE REMOVED

PROPOSED CLASS IV MACHINE

PLACED RIPRAP BANK

STABILIZATION.

INSTALL TO 5' VERTICALLY ABOVE

ADJACENT BOTTOM OF BANK.

PROPOSED SLOPE TO MATCH

EXISTING TOP OF BANK IN SUCH A

MANNER THAT THERE IS A SMOOTH

TRANSITION. TYPICAL ON BOTH SIDES.

PROPOSED BOTTOM OF BANK TO TIE

INTO EXISTING BOTTOM OF BANK IN

SUCH A MANNER THAT THERE IS A

SMOOTH TRANSITION.

TYPICAL ON BOTH SIDES.

REFERENCE SPECIFICATION 203.04(B)

BOTTOM OF BANK

PLACE INDIVIDUAL RIPRAP AT

TOP OF BANK ON EXISTING

ROAD PRISM, SPACED NO

MORE THAN 36" EDGE TO EDGE.

ROADWAY OBLITERATION,

METHOD 1

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text

12445523B0006 (2).pdf
FR209-0.2 RED RUN - EXISTING STRUCTURE REMOVAL PLAN.pdf
Sheets and Views
REMOVAL PLAN
PLOT 24X36
PLOT 11X17
PLOT 8.5X11

File details come from the government source that posted it. Updated .