Amendment 0001.pdf
PDF 1 MB Posted
- Attached to
- Monongahela National Forest FR209 AOP Replacement Federal contract opportunity
- Solicitation number
- 12445523B0006
- Issued by
- Department of Agriculture Forest Service
About this file
This document is an amendment to a solicitation for structure removal and rehabilitation services on National Forest lands. The United States Department of Agriculture Forest Service is seeking bids to remove an existing structure and rehabilitate adjacent lands on Red Run in the Monongahela National Forest in West Virginia. Construction drawings depicting the existing conditions and proposed work are incorporated into the solicitation. Bidders must acknowledge receipt of the amendment by the specified date and time. The period of performance for the work is from October 2, 2023 to June 28, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Monongahela National Forest FR209 AOP Replacement QA 230913.pdf | ||
| FR209 Pre-Bid QA.pdf | ||
| 12445523B0003PreBidQandA.docx | DOCX document | |
| 12445523B0006 Solicitation.pdf | ||
| FR209_Plans_signed.pdf | ||
| RedRun.LRP-2022-0309 Location Map.pdf | ||
| RedRun.LRP-2022-0309 NWP-14 Verification Letter-signed.pdf | ||
| Limits of Disturbance Plan.pdf | ||
| Red Run - 100 pct Supplemental Specs.pdf | ||
| Wage Determination.pdf | ||
| Bridge Inspection Report.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12445523B0006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ATLANTA GA 30309-2449
STE 876S
1720 PEACHTREE ST NW
USDA-FS CSA EAST 13
08/18/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/18/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This Amendment incorporates the following 1 page of construction drawings into Section J., and relates to structure removal and rehabilitation of the immediately adjacent lands.
Period of Performance: 10/02/2023 to 06/28/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
SHAWN M. LACINA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
CP62
B-2
35443546
3547 3550
25' MIN. CHANNEL WIDTH
PROPOSED
STRUCTURE
STA. 10+00
LEGEND
DRILL HOLE CONTROL POINT
TREE LINE
EDGE OF GRAVEL
RIGHT OF WAY
PROPOSED EXISTING
EDGE OF BIT
RIPRAP
PROPERTY OWNER:
MONONGAHELA NATIONAL
FOREST
R
E
D
R
U
N
F
R
D
U
N
S
H
A
V
E
S
F
O
R
K
PROPERTY OWNER:
MONONGAHELA NATIONAL
FOREST
PROPERTY OWNER:
MONONGAHELA NATIONAL
FOREST
PROPERTY OWNER:
MONONGAHELA
NATIONAL FOREST
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
9/5 /23
:0
0 Z
AC
HA
RY
BA
RT
LE
Y C :\U
SE
RS
\Z
AC
HA
RY
BA
RT
LE
Y\
DO
W
NL
OA
DS
\F
R2
-0 .2
RE
D
RU
N
- H
IS
E
CO
PY
8.
.23
.D W
G
EASTERN REGION
FR 209-0.2
OVER
RED RUN
MONONGAHELA
NATIONAL FOREST
GREENBRIER
RANGER DISTRICT
STRUCTURE
REMOVAL
5/11/2022
G.JUNTTILA
J.ALLEN
S. WRIGHT
U28-01575
C-05B
24 5B
STRUCTURAL REMOVAL PLAN
NOT TO SCALE
GENERAL NOTES:
1. THE CONTRACTOR SHALL LOCATE ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO
STARTING WORK AND SHALL CONDUCT HIS OPERATIONS IN SUCH A MANNER AS TO
ENSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE
DISTURBED. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES FOR
TEMPORARY AND PERMANENT RELOCATIONS FOR CONSTRUCTION OPERATIONS
SUCH THAT UTILITIES DO NOT INTERFERE WITH THE TEMPORARY OR PERMANENT
WORK TO BE COMPLETED.
2. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR
MAKING HIS OWN DETERMINATION OF WATER LEVELS THAT WILL EXIST DURING
CONSTRUCTION.
3. MEASURES SHALL BE TAKEN TO PREVENT DEBRIS FROM FALLING FROM THE
EXISTING OR PROPOSED STRUCTURE. IF DEBRIS FALLS INTO THE WATERWAY IT
SHALL BE REMOVED WITHIN 24 HOURS.
4. INSTALL THE SPECIFIED QUANTITY OF ROLLED EROSION CONTROL PRODUCT
(EMAT) AND THEN ANY ADDITIONAL AREAS THAT ARE DISTURBED BY THE
CONTRACTOR SHALL BE SEEDED AND MULCHED UNDER THE LUMP SUM PAY ITEMS.
5. COORDINATE SYSTEM REFERS TO NAD83 WEST VIRGINIA STATE PLAINS, SOUTH
ZONE. DATUM REFERS TO NAVD88.
6. REFERENCE POINTS "A" AND "B" REFER TO FINISH GRADE AT CENTERLINE AT THE
BACK FACE OF THE ABUTMENT BACK WALLS.
7. PROVIDE SMOOTH TRANSITION FROM EXISTING TO PROPOSED ROADWAY AT
REFERENCE POINTS "C" AND "D". FADE OR EXTEND PROFILE SLIGHTLY AS
REQUIRED.
8. SURVEY WAS COMPLETED BY KELLY SURVEYING FOR THIS PROJECT ON 9-22-2021.
9. ALL TREE REMOVAL TO BE INCIDENTAL TO CLEARING AND GRUBBING, DISPOSAL
METHOD A.
STRUCTURE REMOVAL:
FOLLOW ALL SPECIFICATIONS FOR REMOVAL OF STRUCTURE,
STRUCTURE REMOVAL PLAN SUBMITTAL REQUIREMENTS,
REQUIREMENTS TO EXCAVATE TO NATURAL STREAM BOTTOM,
AS WELL AS BACKFILLING VOIDS LEFT BY EXISTING
STRUCTURAL COMPONENTS TO BE REMOVED. RIPRAP
STREAMBANK STABILIZATION SHOWN ON THE PLANS AS WELL
AS RIPRAP PLACEMENT ON TOP OF FILL SLOPE ON ROAD PRISM
IS INCIDENTAL TO "ITEM 0001AE, 20304 - REMOVAL OF OLD
STRUCTURE, DISPOSAL METHOD A". INSTALL RIPRAP TO DEPTH
OF 1.5 TIMES THE NOMINAL SIZE OF CLASS IV AT A MINIMUM.
AREAS DISTURBED BY REMOVAL ACTIVITIES THAT ARE NOT TO
RECEIVE RIPRAP COVER SHALL BE SEEDED AND MULCHED.
REDLINES BY USFS
EXISTING STRUCTURE
TO BE REMOVED
PROPOSED CLASS IV MACHINE
PLACED RIPRAP BANK
STABILIZATION.
INSTALL TO 5' VERTICALLY ABOVE
ADJACENT BOTTOM OF BANK.
PROPOSED SLOPE TO MATCH
EXISTING TOP OF BANK IN SUCH A
MANNER THAT THERE IS A SMOOTH
TRANSITION. TYPICAL ON BOTH SIDES.
PROPOSED BOTTOM OF BANK TO TIE
INTO EXISTING BOTTOM OF BANK IN
SUCH A MANNER THAT THERE IS A
SMOOTH TRANSITION.
TYPICAL ON BOTH SIDES.
REFERENCE SPECIFICATION 203.04(B)
BOTTOM OF BANK
PLACE INDIVIDUAL RIPRAP AT
TOP OF BANK ON EXISTING
ROAD PRISM, SPACED NO
MORE THAN 36" EDGE TO EDGE.
ROADWAY OBLITERATION,
METHOD 1
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
| 12445523B0006 (2).pdf |
| FR209-0.2 RED RUN - EXISTING STRUCTURE REMOVAL PLAN.pdf |
| Sheets and Views |
| REMOVAL PLAN |
| PLOT 24X36 |
| PLOT 11X17 |
| PLOT 8.5X11 |
File details come from the government source that posted it. Updated .