This document contains a schedule of items for the construction of Forest Service Road 404 Cane Creek Culvert Replacement. The project involves construction survey and staking, soil erosion and pollution control, clearing and grubbing, removal of structures and obstructions, embankment construction, structure excavation, foundation fill including aggregate and geogrid, structural backfill, placed riprap, surface aggregate, aggregate base, structural concrete for substructure including reinforcing steel, 24" pipe culvert, 19'-0" span 8'-2" rise aluminum structural plate arch including structural backfill and dewatering, aluminum structural plate headwalls and wingwalls, seeding, mulching, rolled erosion control product, object markers, placed streambed simulation rock, and banks placed channel rock. The solicitation is issued by the Department of Agriculture Forest Service as solicitation number 12445221B0007. Nine contractors provided unit pricing for each item which will be evaluated in the award of the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract for 12445221B0007 - USDA Forest Service Cane Creek Culvert .docx | DOCX document | |
| 12445221B0007_Prebid_Sign-in.pdf | ||
| 12445221B0007 Questions and Answers.docx | DOCX document | |
| J.4 WAGE DETERMINATION.pdf | ||
| 12445221B0007IFB.pdf | ||
| J.5 Buy American and Hazardous Materials.pdf | ||
| J.6 qrcode_for location map.pdf | ||
| J.3 FOREST SERVICE STANDARD SPECIFICATIONS.docx | DOCX document | |
| J.1 DRAWING.pdf | ||
| J.2 STATEMENT OF WORK.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
15201
CONSTRUCTION, SURVEY AND STAKING, METHOD 6,
TOLERANCE A LUMP SUM 1 3,000.00$ 3,000.00$ 28,000.00$ 28,000.00$ 6,411.04$ 6,411.04$ 14,880.00$ 14,880.00$ 30,000.00$ 30,000.00$ 25,000.00$ 25,000.00$ 28,493.00$ 28,493.00$ 2,500.00$ 2,500.00$ 5,500.00$ 5,500.00$ 9,965.00$ 9,965.00$
15713 SOIL EROSION & POLLUTION CONTROL LUMP SUM 1 20,000.00$ 20,000.00$ 5,000.00$ 5,000.00$ 6,984.04$ 6,984.04$ 13,699.99$ 13,699.99$ 28,000.00$ 28,000.00$ 17,500.00$ 17,500.00$ 259,833.00$ 259,833.00$ 8,000.00$ 8,000.00$ 3,500.00$ 3,500.00$ 11,210.00$ 11,210.00$
20101 CLEARING AND GRUBBING LUMP SUM 1 2,000.00$ 2,000.00$ 8,000.00$ 8,000.00$ 6,144.04$ 6,144.04$ 13,432.00$ 13,432.00$ 30,000.00$ 30,000.00$ 10,800.00$ 10,800.00$ 12,347.00$ 12,347.00$ 10,000.00$ 10,000.00$ 16,800.00$ 16,800.00$ 12,850.00$ 12,850.00$
20301
REMOVAL OF STRUCTURE AND
OBSTRUCTIONS LUMP SUM 1 10,000.00$ 10,000.00$ 8,000.00$ 8,000.00$ 8,384.04$ 8,384.04$ 14,682.00$ 14,682.00$ 30,000.00$ 30,000.00$ 25,500.00$ 25,500.00$ 61,202.00$ 61,202.00$ 15,000.00$ 15,000.00$ 18,500.00$ 18,500.00$ 12,980.00$ 12,980.00$
20415 EMBANKMENT CONSTRUCTION, METHOD 1, TOLERANCE C CUBIC YARD* 606 34.65$ 20,997.90$ 25.00$ 15,150.00$ 20.28$ 12,289.68$ 19.82$ 12,010.92$ 65.00$ 39,390.00$ 41.00$ 24,846.00$ 60.00$ 36,360.00$ 10.00$ 6,060.00$ 95.00$ 57,570.00$ 43.50$ 26,361.00$
20801 STRUCTURE EXCAVATION CUBIC YARD* 640 15.63$ 10,003.20$ 20.00$ 12,800.00$ 19.20$ 12,288.00$ 17.50$ 11,200.00$ 40.00$ 25,600.00$ 38.00$ 24,320.00$ 23.00$ 14,720.00$ 10.00$ 6,400.00$ 110.00$ 70,400.00$ 42.00$ 26,880.00$
20802
FOUNDATION FILL, INCLUDES
AGGREGATE AND GEOGRID TYPE III CUBIC YARD* 12 166.70$ 2,000.40$ 700.00$ 8,400.00$ 973.52$ 11,682.24$ 421.40$ 5,056.80$ 680.00$ 8,160.00$ 225.00$ 2,700.00$ 595.00$ 7,140.00$ 100.00$ 1,200.00$ 150.00$ 1,800.00$ 685.00$ 8,220.00$
20803 STRUCTURAL BACKFILL, CUBIC YARD* 134 40.00$ 5,360.00$ 60.00$ 8,040.00$ 181.52$ 24,323.68$ 81.80$ 10,961.20$ 98.00$ 13,132.00$ 88.00$ 11,792.00$ 54.00$ 7,236.00$ 35.00$ 4,690.00$ 110.00$ 14,740.00$ 52.50$ 7,035.00$
25101 PLACED RIPRAP, CLASS 3 TON* 66 110.00$ 7,260.00$ 97.00$ 6,402.00$ 145.17$ 9,581.22$ 134.66$ 8,887.56$ 71.00$ 4,686.00$ 125.00$ 8,250.00$ 42.00$ 2,772.00$ 75.00$ 4,950.00$ 120.00$ 7,920.00$ 173.00$ 11,418.00$
30113 SURFACE AGGREGATE TON* 121 45.00$ 5,445.00$ 33.00$ 3,993.00$ 133.47$ 16,149.87$ 58.71$ 7,103.91$ 45.00$ 5,445.00$ 81.00$ 9,801.00$ 27.00$ 3,267.00$ 35.00$ 4,235.00$ 95.00$ 11,495.00$ 86.00$ 10,406.00$
30204 AGGREGATE BASE, GRADING C, COMPACTION D TON* 208 45.00$ 9,360.00$ 60.00$ 12,480.00$ 91.00$ 18,928.00$ 43.72$ 9,093.76$ 45.00$ 9,360.00$ 88.00$ 18,304.00$ 26.00$ 5,408.00$ 35.00$ 7,280.00$ 75.00$ 15,600.00$ 72.00$ 14,976.00$
55201
STRUCTURAL CONCRETE FOR SUBSTRUCTURE, INCLUDES
REINFORCING STEEL CUBIC YARD* 51 500.00$ 25,500.00$ 700.00$ 35,700.00$ 1,055.88$ 53,849.88$ 497.17$ 25,355.67$ 1,005.00$ 51,255.00$ 1,450.00$ 73,950.00$ 436.00$ 22,236.00$ 1,900.00$ 96,900.00$ 600.00$ 30,600.00$ 1,250.00$ 63,750.00$
60201
24" PIPE CULVERT, ALUMINIZED TYPE II CORR. METAL PIPE (2-
2/3”x1/2” CORR.), INCLUDES FOOT* 30 150.00$ 4,500.00$ 137.00$ 4,110.00$ 245.12$ 7,353.60$ 118.43$ 3,552.90$ 99.00$ 2,970.00$ 98.00$ 2,940.00$ 313.00$ 9,390.00$ 90.00$ 2,700.00$ 5,200.00$ 156,000.00$ 200.00$ 6,000.00$
60302
19'-0" SPAN, 8'-2" RISE, ALUMINUM STRUCTURAL PLATE
ARCH, INCLUDES STRUCTUAL BACKFILL AND DEWATERING FOOT* 31 3,741.94$ 116,000.14$ 5,807.00$ 180,017.00$ 37,074.12$ 1,149,297.72$ 4,382.75$ 135,865.25$ 3,726.00$ 115,506.00$ 1,650.00$ 51,150.00$ 4,374.00$ 135,594.00$ 5,700.00$ 176,700.00$ 2,000.00$ 62,000.00$ 5,150.00$ 159,650.00$
60305 ALUMINUM STRUCTURAL PLATE HEADWALL AND WINGWALLS EACH 2 7,500.00$ 15,000.00$ 10,000.00$ 20,000.00$ 23,324.84$ 46,649.68$ 29,890.00$ 59,780.00$ 22,500.00$ 45,000.00$ 38,800.00$ 77,600.00$ 18,626.00$ 37,252.00$ 12,000.00$ 24,000.00$ 12,000.00$ 24,000.00$ 36,785.50$ 73,571.00$
62504 SEEDING, DRY OR HYDRAULIC METHOD ACRE 0.5 5,000.00$ 2,500.00$ 3,000.00$ 1,500.00$ 8,851.22$ 4,425.61$ 2,769.00$ 1,384.50$ 6,000.00$ 3,000.00$ 2,400.00$ 1,200.00$ 1,189.00$ 594.50$ 2,000.00$ 1,000.00$ 11,000.00$ 5,500.00$ 10,100.00$ 5,050.00$
62505 MULCHING ACRE 0.5 2,000.00$ 1,000.00$ 3,000.00$ 1,500.00$ 5,872.02$ 2,936.01$ 2,769.00$ 1,384.50$ 6,000.00$ 3,000.00$ 2,100.00$ 1,050.00$ 7,359.00$ 3,679.50$ 1,000.00$ 500.00$ 1,800.00$ 900.00$ 3,600.00$ 1,800.00$
62901 ROLLED EROSION CONTROL PRODUCT, TYPE EROSION SQUARE YARD 1967 3.00$ 5,901.00$ 2.50$ 4,917.50$ 7.09$ 13,946.03$ 2.24$ 4,406.08$ 3.00$ 5,901.00$ 5.00$ 9,835.00$ 14.00$ 27,538.00$ 3.00$ 5,901.00$ 2.30$ 4,524.10$ 8.00$ 15,736.00$
CONTROL MATS, TYPE 3B, BIODEGRADABLE -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
63307 OBJECT MARKERS, TYPE III EACH 4 150.00$ 600.00$ 250.00$ 1,000.00$ 664.00$ 2,656.00$ $ 286.00 1,144.00$ 250.00$ 1,000.00$ 2,100.00$ 8,400.00$ 962.00$ 3,848.00$ 100.00$ 400.00$ 530.00$ 2,120.00$ 400.00$ 1,600.00$
64801
PLACED STREAMBED
SIMULATION ROCK, BED CLASS 2, PLACEMENT METHOD A CUBIC YARD* 66 100.00$ 6,600.00$ 175.00$ 11,550.00$ 290.34$ 19,162.44$ 267.55$ 17,658.30$ 99.00$ 6,534.00$ 66.00$ 4,356.00$ 70.00$ 4,620.00$ 90.00$ 5,940.00$ 300.00$ 19,800.00$ 120.00$ 7,920.00$
64803 BANKS PLACED CHANNEL ROCK, CLASS 0, PLACEMENT METHOD A CUBIC YARD* 14 100.00$ 1,400.00$ 150.00$ 2,100.00$ 323.59$ 4,530.26$ 497.58$ 6,966.12$ 215.00$ 3,010.00$ 195.00$ 2,730.00$ 105.00$ 1,470.00$ 90.00$ 1,260.00$ 260.00$ 3,640.00$ 119.00$ 1,666.00$
TOTAL $ 274,427.64 378,659.50$ 1,437,973.08$ 378,505.46$ 460,949.00$ 412,024.00$ 685,000.00$ 385,616.00$ 532,909.10$ 489,044.00$
Section B: Services and Prices
B-1: SCHEDULE OF ITEMS
PRABHAKAR MORO-DBA TAG CONTRACTING, INC. FD RILEY & SON INC CONSOLIDATED CONSTRUCTION & ENG CO. INC. AOS Specialty Contractors, IncCIRCLE HAVESTING CO. RSD CONSTRUCTION LLC MCCALL'S GRADING & CONSTRUCTION BRIGGS BROTHERS ENTERPRISES CORPORATION SEAWOLF CONSTRUCTION