Questions and Answers.docx
DOCX document 97 KB Posted
- Attached to
- ALF Forest-wide Broadcast Fertilizer Application Federal contract opportunity
- Solicitation number
- 12444324Q0029
About this file
This document is a set of Questions and Answers related to Solicitation Number 12444324Q0029 for the ALF Forest-wide Broadcast Fertilizer Application contract.
The solicitation seeks to secure a contractor to uniformly apply granular fertilizer, specifically Urea (46-0-0) and Diammonium Phosphate (18-46-0), to designated areas on the Allegheny National Forest in Pennsylvania. The sites have had overstory removed and contain logging slash, requiring ground-based equipment capable of traversing the terrain. Staging of fertilizer at the job sites is not recommended, and the agency prefers daily delivery by the contractor. This is a new contract action, differing from previous requirements. The contractor is responsible for providing all necessary equipment, as the equipment proposed in the questions would not be suitable for the conditions. Proposals are due next week, though an award date is not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Attachment 4 - 24FertApplicationTable.pdf | ||
| Attachment 6 - Wage Determination 2015-4249 Elk McKean PA.pdf | ||
| Attachment 5 - Wage Determination 2015-4247 Forest Warren PA.pdf | ||
| Attachment 1 - Schedule of Items.doc | DOC document | |
| Solicitation - 12444324Q0029 COMPLETE.pdf | ||
| Attachment 2 - Statement of Work.doc | DOC document | |
| Attachment 7 - Performance Evaluation Criteria.rtf | RTF text file | |
| Attachment 3 - Fert2024_BradfordMaps.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12444324Q0029 - ALF Forest-wide Broadcast Fertilizer Application 27MAR2024
1. Upon notification of award would it be acceptable to get all fertilizer delivered to the Bradford Ranger District and kept there for storage during the duration of the project? I am not sure what the Allegheny NF requirements are for storing large amounts of fertilizer on public lands during this contract. I was thinking this would be the most efficient way to get this project done.
a. The district compound is not set up well for storage or staging of fertilizer. The contractors that we have had in the past trucked the fertilizer to the site daily for operations.
2. The question revolves around the Urea and DAP being used. To confirm this is what the Forest is requesting?
a. Yes, the forest is requesting Urea and DAP. Per the SOW - “Materials to be used on this project will be solid form granular or pelleted Urea (46-0-0), and Diammonium Phosphate (18-46-0).”
3. Are there any approved staging areas for this contract that can be utilized? Is there a field office in Warren that could be used?
a. There are opportunities to stage at stone pits/openings near the sites. I would not recommend staging over weekends or for longer periods of time as those sites will not be secure.
4. Can you provide the incumbent? Contract Award # and amount?
a. This is a new contract action differing from previous requirements.
5. I was wondering before I submit my proposal next week if this equipment (photo attached) for fertilizer application would be accepted for this contract?
a. This equipment will not work for this contract. It will require ground-based equipment that is capable of traversing logging slash since all the sites have had overstock removal harvests. There is a lot of slash on the sites. Typically, this work has been performed by tracked machines. Even a farm tractor with rubber tires will not work; therefore, the attached equipment will not be able to be pushed through the site.
6. I do see that it states for tracked vehicles to be used, however we have a large vehicle which we may be able to utilize in addition to tracked. This large vehicle is using floating tires that are made not to get stuck. Would it be allowed for us to utilize this type of equipment with floating tires if applicable?
a. In the answer to this question, we state: …” It will require ground-based equipment that is capable of traversing logging slash since all the sites have had overstock removal harvests. There is a lot of slash on the sites. Typically, this work has been performed by tracked machines. Even a farm tractor with rubber tires will not work; therefore, the attached equipment will not be able to be pushed through the site.”
We are not requiring that tracked vehicles be used, only stating that typically this is how the work has been done. If you have a viable alternative, you are free to present it in your proposal so that we may evaluate its merits.