Attachment 2 Schedule of Items Pricing.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Tongass National Forest IT Infrastructure Upgrades Federal contract opportunity
Solicitation number
1240BF26Q0004
Issued by
Department of Agriculture Forest Service

About this file

This is a pricing schedule template for IT infrastructure equipment and services required to extend Agency Dedicated Internet (ADI) service to multiple facilities across Tongass National Forest (TNF) ranger districts in Alaska. Solicitation 1240BF26Q0004 contains two distinct pricing sections: the first comprises 85 line items for IT hardware and materials (items 0001-0085), and the second includes facility cleaning services organized by category and measured in square footage.

The IT equipment section lists items 0001-0085, all priced at $0.00 in the template, encompassing networking and fiber optic infrastructure components such as plywood backboards, cabinets, racks, uninterruptible power supplies (200W-700W), patch panels, bonding equipment, conduit, fiber optic cables and enclosures, ethernet cables and connectors, pulling tools, and shipping to eight Alaska locations (Sitka, Juneau, Craig, Petersburg, Wrangell, Yakutat, Hoonah, Ketchikan/Hyder, and Thorne Bay). The cleaning services section specifies base year pricing (11-month period of performance) across five contract line item numbers (CLINs): CLIN 0002 for Category I Administrative Buildings rest room and floor cleaning at $0.0408-$0.0231 per square foot; CLIN 0003 for Category II Child Development Facilities floor cleaning at $0.0252-$0.0194 per square foot; CLIN 0004 for Category III Physical Fitness Centers hard floor cleaning at $0.0344 per square foot plus monthly continuous locker room cleaning at $4,322.26; CLIN 0005 for Special/Emergency/Bio-Hazard cleaning at $0.28-$1.13 per square foot; and CLIN 0006 for Contractor Manpower Reporting at $100.00. The base year total estimated cost is $767,485.01. Bidders must complete only the yellow-highlighted cells and provide company name, point of contact, CAGE code, UEI number, address, phone, email, and fax information.

View the file

Other files for this federal contract opportunity

Other files attached to Tongass National Forest IT Infrastructure Upgrades, newest first.
File Type Posted
Sol_1240BF26Q0004_Amd_0002.pdf PDF
C05 Salient characteristics 1240BF26Q0004 A0001.pdf PDF
Sol_1240BF26Q0004_Amd_0001.pdf PDF
1240BF26Q0004 TNF IT Upgrades.pdf PDF
C05 Salient characteristics 1240BF26Q0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET

TNF IT Infa Parts

SOLICITATION: 1240BF26Q0004
Company Name:
Point of Contact (POC):
CAGE Code:
UEI Number:
Address:
Phone:
E-mail:
Fax
Item NumberDescriptionQuantityUnit of IssueUnit PriceTotal
0001Plywood backboard10EA$0.00
0002Fasteners for backboard, 30 PCS9EA$0.00
0003Cabinet, 12U8EA$0.00
0004Rack, wall mount, 12U4EA$0.00
0005Rack Shelving48EA$0.00
0006Uninterruptible Power Supply, 200W min.10EA$0.00
0007Uninterruptible Power Supply, 300W min.1EA$0.00
0008Uninterruptible Power Supply, 400W min.7EA$0.00
0009Uninterruptible Power Supply, 500W min.2EA$0.00
0010Uninterruptible Power Supply, 600W min.3EA$0.00
0011Uninterruptible Power Supply, 700W min.5EA$0.00
0012Patch panel, Cat 6A26EA$0.00
0013Rack bonding busbar, including hardware kit17EA$0.00
0014Rack bonding jumper kit18EA$0.00
0015Grounding bus bar & hardware4EA$0.00
0016Grounding cable & accessories6EA$0.00
0017Galvanized steel rigid metal conduit, 1-1/2" diam. X 10 ft long20EA$0.00
0018Utility marking posts8EA$0.00
0019Outdoor fiber optic distribution enclosure3EA$0.00
0020Fiber drop clamp2EA$0.00
0021Screw hook2EA$0.00
0022Cable clips, exterior, 100 pcs2EA$0.00
0023Cable clips, interior, 100 pcs4EA$0.00
0024Entry boot assembly6EA$0.00
0025Entry panel6EA$0.00
0026Entry port cap6EA$0.00
0027Head flashing12EA$0.00
0028Continuous hinge outdoor enclosure6EA$0.00
0029Hole saw: 4-1/2 inch diameter1EA$0.00
0030Hole saw: 2-3/8 inch diameter2EA$0.00
0031Hole saw: 1-3/8 inch diameter1EA$0.00
0032Exterior wood screws, 1/4 in. diam. x 3 in. long, 25 PCS1EA$0.00
0033Exterior wood screws, #10 x 3 in. long, 1 lb.2EA$0.00
0034Aerial fiber optic cable marker, 25 pcs1EA$0.00
0035Concrete screw anchors, pack of 252EA$0.00
0036Concrete drill bit4EA$0.00
0037Sealant4EA$0.00
0038Threaded conduit adapter. Trade size: 2 inch12EA$0.00
0039Insulated plastic bushing. Trade size: 2 inch12EA$0.00
0040Breakout boot, 3-way outlet: Body for 2" SCHD 40 PVC. 1 outlet for 6.5 mm cable and 2 outlets for 12.2 mm cable.1EA$0.00
0041Breakout boot, 2-way outlet: Body for 2" SCHD 40 PVC. 1 outlet for 6.5 mm cable and 1 outlet for 12.2 mm cable.1EA$0.00
0042Breakout boot, 2-way outlet: Body for 2" SCHD 40 PVC. 1 outlet for 12.2 mm cable.1EA$0.00
0043Fiber optic cable, direct burial, 1000 LF1EA$0.00
0044Fiber optic cable, direct burial, 250 LF1EA$0.00
0045Fiber optic cable, aerial, 100 LF1EA$0.00
0046Fiber optic cable, 1000 LF1EA$0.00
0047Fiber optic cable, 450 LF1EA$0.00
0048Fiber optic cable, 400 LF2EA$0.00
0049Fiber optic cable, 350 LF3EA$0.00
0050Fiber optic cable, 250 LF1EA$0.00
0051Fiber optic cable, 150 LF1EA$0.00
0052Fiber optic cable, 100 LF1EA$0.00
0053Fiber optic cable strap clamp100EA$0.00
0054Fiber optic enclosure15EA$0.00
0055Fiber optic panel15EA$0.00
0056Fiber optic patch cables, 3 ft40EA$0.00
0057Fiber optic patch cables, 6 ft32EA$0.00
0058Fiber optic transceivers63EA$0.00
0059Fiber converter14EA$0.00
0060Ethernet patch cable, 3 ft, white74EA$0.00
0061Ethernet patch cable, 3 ft, blue163EA$0.00
0062Ethernet patch cable, 25 LF, white3EA$0.00
0063Ethernet patch cable, 25 LF, blue3EA$0.00
0064Ethernet patch cable, 75 LF, white9EA$0.00
0065Ethernet patch cable, 75 LF, blue4EA$0.00
0066Ethernet cable, 1000 LF spool, white4EA$0.00
0067Ethernet cable, 1000 LF spool, blue23EA$0.00
0068Ethernet connector plugs, 100 pack13EA$0.00
0069RJ45 to RJ11 converter adapter, 2 pack35EA$0.00
007010-32 Rack screws for cabinet, 100 PCS17EA$0.00
0071Poly Line, 500 ft2EA$0.00
0072Poly Line, 6500 ft1EA$0.00
0073Fish cable rods for pulling ethernet, 50 ft capacity13EA$0.00
0074Fish tape wire pulling cable, 100 ft6EA$0.00
0075Fish tape wire pulling cable, 200 ft5EA$0.00
0076Fish tape wire pulling cable, 300 ft2EA$0.00
0077Shipping to Sitka1EA$0.00
0078Shipping to Juneau1EA$0.00
0079Shipping to Craig1EA$0.00
0080Shipping to Petersburg1EA$0.00
0081Shipping to Wrangell1EA$0.00
0082Shipping to Yakutat1EA$0.00
0083Shipping to Hoonah1EA$0.00
0084Shipping to Ketchikan and Hyder1EA$0.00
0085Shipping to Thorne Bay1EA$0.00

Grand Total: $0.00

Sheet1

BASE YEAR
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0002Category I Administrative Buildings
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002AACategory I Administrative Buildings Rest Room Cleans2,620,889sq. ft$ 0.0408$ 106,932.25*55,026x47.63= 2,620,888.58 SF (11month period)55026.0041990342522,861,352.22
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ABCategory I Administrative Buildings Hard Floor Cleans6,586,752sq. ft$ 0.0231$ 152,153.97*94,515x47.63= 4,501,749.45 SF138289.986773042527,191,079.31
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ACCategory I Administrative Buildings Carpet Floor Cleans1,204,420sq. ft$ 0.0192$ 23,124.87*19,831x47.63= 944,550.53 SF25287.0098677304521,314,924.51
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.$ 282,211.100520.00
Period of Performance: 11 months (Base Year)0520.00
0520.00
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST520.00
0003Category II Child Development Facilities520.00
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.52
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0003AACategory II Child Development Facilities Hard Floor Cleans11,485,212sq. ft$ 0.0252$ 289,427.35*390,060x238.15weeks = 9,302,139 SFTOTAL: 11,485,212.42 SF
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*7,639x285.78 weeks = 2,183,073 SF
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0003ABCategory II Child Development Facilities Carpet Floor Cleans685,729sq. ft$ 0.0194$ 13,303.14*1113x238.15 weeks = 265,060.95 SFTOTAL: 685,729.11
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*1472x285.78 weeks = 420,668.16 SF
Period of Performance: 11 months (Base Year)$ 302,730.50
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0004Category III Physical Fitness Centers
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0004AACategory III Physical Fitness Centers Hard Floor Cleans3,010,146sq. ft$ 0.0344$ 103,549.02Bldg 3452(6W) 1,330,305.90 SF1W*Hockey 1,323x17.32 = 22,914.36 SF1,330,305.90
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.Bldg 3709 (7W) 1,416,325.68 SF6W*Hockey 1,323x30.31= 240,600.00 SF1,416,325.68
Period of Performance: 11 months (Base Year).22,914.36
QTYUNITUNIT PRICETOTAL COST240,600.00
0004ABCategory III Continuous Cleaning Physical Fitness Center Bldg 370911monthly$ 4,322.26$ 47,544.86Total Hours 1,657.05Provide locker room cleaning from 13:00-15:30 daily 1Male/1Female 2-1/2 hours each.3,010,145.94
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0005Special /Emergency/Bio-Hazard Cleans
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005AASpecial Cleaning40,538per sq. ft$ 0.28$ 11,472.25
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 20% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ABEmergency Cleaning22,296per sq. ft$ 0.38$ 8,405.59
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Emergency Cleaning CLIN represents 11% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ACBio-Hazard Cleaning10,134per sq. ft$ 1.13$ 11,471.69
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 5% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0006CONTRACT MANPOWER REPORTING1EA$ 100.0000$ 100.0000
Contractor Manpower Reporting Costs: 1 May 2016 to 30 March 2017. The Contractor Manpower Reporting requirement is associated with the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) requirement to obtain better visibility of the Contractor service workforce.
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
BASE YEAR TOTAL COST:$ 767,485.01