Amendment Electrical RFIs Upgrade Chillers RRC Building USDA Athens.docx
DOCX document 14 KB Posted
- Attached to
- Phase 1 of Chiller Upgrade Federal contract opportunity
- Solicitation number
- 12405B22Q0200
About this file
This document contains a federal contract opportunity solicitation and related questions and answers. The United States Department of Agriculture Agricultural Research Service is seeking a firm fixed price contract for Phase 1 of a chiller upgrade at its facility located at 950 College Station Rd in Athens, GA. The work includes installing a new 1600 amp breaker and upgrading chillers in accordance with the provided specifications and statement of work. Quotes are due by July 29, 2022 and must include a price breakdown of all elements. Questions are due by July 22 and answers will be posted as an amendment. To be eligible, contractors must be registered in SAM and have a UEI number to submit invoices electronically. The NAICS code is 238220 and the small business size standard is $16.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination with rates.pdf | ||
| SF25-16d1 Performance Bond.pdf | ||
| SF25A-16d payment Bond.pdf | ||
| 12405B22Q0200.pdf | ||
| USDA ARS Athens GA Upgrade Chiller - Final Turnover Drawings 03-01-21.pdf | ||
| Wage Determination.pdf | ||
| SOW Chiller RRC Athens GA.docx | DOCX document | |
| Clauses and Provisions.docx | DOCX document | |
| USDA ARS Athens GA Upgrade Chiller - Final Turnover Specifications 03-01-21.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFIs Upgrade Chillers RRC Building USDA Athens, GA
1. Reference note 4 on sheet E4.1 indicates to install a new 1600amp Square D breaker in in existing main switchboard “MSB”. Please confirm that this is a prepared space meaning the breaker carriage, the bus. and the breaker stabs are in this spare breaker compartment that is to be used.
Yes the space is prepared.
2. Please confirm that work associated with notes 9 & 10 under “Reference Notes-Phase 2 -New on sheet E4.1 are not part of the Phase 1 pricing.
Confirmed, this is not part of phase 1. These notes apply to power for the new Chiller in Phase 2.
3. We note that paragraph 3.1.5 spec section 26 05 33 -4 indicates that conduit and boxes installed in mechanical rooms is to be galvanized rigid conduit. We noted doing the site visit that there were numerous overhead conduit feeders that were EMT down to the top of the panel or switchboard they originated from. Is EMT permitted to be used in the interior of the mechanical and electrical rooms if conduit is terminated into the top of the panel?
No, bid as designed with rigid conduit.