SF-30_Amendment_03.pdf
PDF 222 KB Posted
- Attached to
- Electrical Upgrade in Building 13 Federal contract opportunity
- Solicitation number
- 1232SDS18JC06
About this file
Amendment 03 - Additional Questions and Answers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30_Amendment_02.pdf | ||
| Amendment_1.pdf | ||
| Attachment_III_-_Option_1_-_SOW_with_photos.pdf | ||
| Attachment_IV_-_DBA_Wage_Rates.pdf | ||
| Attachment_II_-_Drawings_for_base.pdf | ||
| Solicitation_-_1232SDS18JC06.pdf | ||
| Attachment_V_-_Payment_and_Performance_Bond_Forms.pdf | ||
| Attachment_I_-_Specifications_for_base.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by USDA/ARS/OCIO/ADB.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
07/19/2018
06/22/2018
1 3
Amendment No. 03
USDA, ARS, WBSC
1001 HOLLEMAN DRIVE EAST
COLLEGE STATION, TS 77840
Phone: (979) 260-9446 Email: joseph.covarrubio@ars.usda.gov
SAME AS BLOCK 6
ALL PROSPECTIVE BIDDERS 1232SDS18JC06
This solicitation is amended to incorporate additional Questions and Answers received.
The bid due date IS extended to July 30, 2018 by close of business 4:30p.m CST.
NO MORE QUESTIONS WILL BE ANSWERED CONCERNING THIS SOLICITATION.
No other changes are made to the terms and conditions of this solicitation.
BIDDERS MUST ACKNOWLEDGE THIS AMENDMENT BY SIGNING THIS SF-30 AND RETURNING IT WITH YOUR BID.
Joseph Covarrubio, CONTRACT SPECIALIST
07/19/2018
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effec-tive date shall be the same as the effective date of the initial decision.
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(1) Accounting classification
Net increase $
(2) Accounting classification Net decrease $
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
(1)
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i)
(ii)
(iii)
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determi-nation by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to -
(i) A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
Include subject matter or short title of solicita-tion/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contract-ing officer's signature is normally affixed last on supplemental agreements.
STANDARD FORM 30 BACK (REV. 10-83)
(1)
(a)
(b)
(2)
(3)
(4)
(5)
(c)
(d)
(e)
(f)
Item 9, (Amendment of Solicitation No.--Dated), and 10, (Modification of Contract/Order No.-- Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
(g)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(h)
07/19/2018
Additional Questions and Answers for Solicitation 1232SDS18JC06 Electrical
Upgrade Project – Baton Rouge, LA
Answers in red:
1. Will the contractors have access to restrooms or should they provide portable toilets?
A. Contractors should provide portable toilets.
2. Specification 26 20 00, 2.11.1 requires panelboard cabinets to be NEMA 4X. NEMA 4X enclosures are typically found in harsh environments and would unduly add cost if not actually required. Please confirm desired NEMA ratings for the new 400 amp MDP and the (4) new flush mount wall panels.
A. The 400 amp and 4 flush mount panels are to be NEMA 1 rated, not NEMA 4X.
3. Should generators be employed to provide temporary power for the freezers, can the generators be located on the north side of Building 13 considering the proximity to the bee hives, or must the generator(s) be located remotely.
A. Generators can go on the north side of Bldg. 13. ARS will move bee colonies out of that area during this work.
| SF-30 Amend 3 07-19-18..p |
| Questions and Answers 07.19.18 |
File details come from the government source that posted it.