Scope of Work (Greenhouse Upgrade Phase II SOW)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1232SD18B0001_Amd_0005.pdf | ||
| 1232SD18B0001_Amd_0004.pdf | ||
| 1232SD18B0001_Amd_0003.pdf | ||
| Calculation_of_Self_Performed_Work.xlsx | XLSX spreadsheet | |
| Pre-bid_sign_in_sheet.PDF | ||
| Asbestos_Report_16-02-02015.PDF | ||
| 1232SD18B0001_Amd_0002.pdf | ||
| Pre_Bid_Agenda.pdf | ||
| 1232SD18B0001_Amd_0001.pdf | ||
| Calculation_of_Self_Performed_Work.xlsx | XLSX spreadsheet | |
| Wage_Determination_NE180058_02-02-2018__NE58.pdf | ||
| ars371.pdf | ||
| Drawings.pdf | ||
| Contractor_Certification_Regarding_EMR.pdf | ||
| 1232SD18B0001.pdf | ||
| RFI_FORM.pdf | ||
| ars372.pdf | ||
| Specifications.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GREENHOUSE UPGRADE PHASE II
USDA / ARS / PA
251 FILLEY HALL, UNIV. OF NEBRASKA, EAST CAMPUS
LINCOLN, NE 68583
December 5, 2017
1. Project Title: “Greenhouse Upgrade Phase II
2. Government Points of Contact
a) Contracting Officer (CO):
Jeff Ridenour
WBSC
1815 N. University St.
Peoria, IL 61604
(309) 363-5914 jeffery.ridenour@ars.usda.gov
b) Engineer Project Manager (EPM)/ Contracting Officer’s Representative (COR):
Brian Dean
WBSC
2150 Centre Avenue, Building D, Suite 330 Fort Collins, CO 80526 970-492-7026 brian.dean@ars.usda.gov
c) Safety & Occupational Health Specialist (SOHS) Steve Neck
PA
1001 Holleman Drive East College Station, TX 77840
(979) 587-5549 stephen.neck@ars.usda.gov
d) Location Monitor (LM)
Rob Mitchell Research Agronomist
PA
251 Filley Hall University of Nebraska-Lincoln East Campus, Lincoln, NE 68583 402-472-4020 rob.mitchell@ars.usda.gov
A. Scope of work
Base Replace the existing steam heating system in the Greenhouse including the fin-tube radiation, unit heaters, and associated piping.
Additive Alternate Item #1: Replace the existing Greenhouse lighting system with LED lighting through all Bays of the Greenhouse. Modify the electrical system for additional electrical load of the LED lighting system and future electrical load for the HVAC renovations shown in Item #2. Replace transformer, main electrical panel, and conductors as required for new electrical load.
mailto:jeffery.ridenour@ars.usda.gov mailto:brian.dean@ars.usda.gov mailto:stephen.neck@ars.usda.gov mailto:rob.mitchell@ars.usda.gov
Additive Alternate Item #2: Remove existing HVAC system to provide inclusion of ARS 242.1m compliant HVAC system in the Headhouse.
B. Work Schedule
The contractor shall be responsible for coordinating installation work schedule with the location.
All work shall be done from 8a.m. to 5 p.m. (Monday through Friday). If it is necessary to work on a Saturday or Sunday, Contractor must obtain prior.
C. Debris and Rubbish
It is the Contractor’s responsibility to remove from the premises all debris and rubbish daily from Government property.
D. Government Responsibilities
The Government will furnish, without cost to the contractor, the necessary electrical power requirements and water needed for the project. The Government will not provide the use of tools or equipment needed to do the project. The area around the perimeter is not considered secure.
Materials or equipment left at the work site are the responsibility of the Contractor.
E. Program Management and Control Requirements
The Contractor shall provide supervision and guidance at all times when the Contractor’s employees are performing work to ensure competent and satisfactory performance. The Contractor shall allow inspections throughout project from Government staff. All work shall be completed within 120 calendar days after receipt on notice to proceed.