12314218B0010_Amendment___0002_dated_August_08,_2018.pdf
PDF 628 KB Posted
- Attached to
- USDA South Building - Room 0410 Data Center Conversion Federal contract opportunity
- Solicitation number
- 12314218B0011
About this file
Amendment # 0002 extends the bid date, answers questions posted to date, and replaces the DOL DBA wage determination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12314218B0010_Amendment___0003_dated_August_15,_2018.pdf | ||
| 12314218B0010_Amendment___0001_dated_July_31,_2018.pdf | ||
| USDA_SB_Room_0410_Data_Center_Conversion_â_Sol___12314218B0010_07.13.2018.pdf | ||
| USDA_SB_Room_0410_Data_Center_Conversion_â_Sol___12314218B0010_-_DRAWINGS.pdf | ||
| USDA_SB_Room_0410_Data_Center_Conversion_â_Sol___12314218B0010_-_SPECS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12314218B0010 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Washington DC 20024
DASO-OCP-POD-AMB-DC
Suite 10-149A 355 East 10th Street S.W.
Acquisition Management Branch-WDC USDA, DM/OCP/POD/AMB, POD Acq Mgmt
08/08/20180002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/13/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
USDA South Building
Room 0410 Data Center Conversion
Solicitation # 12314218B0010
** PROPOSAL DUE DATE AND TIME has been POSTPONED. Hard copy proposals are due no later than
Thursday August 16, 2018 @ 1:00PM (EST). Place or location of bids remains unchanged ((355
E Street, S.W., 10th Floor, Patriots Plaza III , Washington, D.C. 20024-3243).
** Attached Davis-Bacon Act Wage Decision Number DC180002 08/03/2018 DC2 replaces the
Davis-Bacon Act Wage General Decision Number: DC180002 07/06/2018 DC2 under Part III¿List of Documents, Exhibits, and Other Attachments, Section J - List of attachments, in its
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
TODD LENNOX
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12314218B0010/0002 entirety.
** Following answers additional questions posted to date:
QUESTION # 18. Specs section grounding & bonding for communication systems page 270526-5, section
3.4 L mentions installing a grounding system for
the raised floor.
18.a. Would you provide a detail drawing of how this should be installed?
ANSWER TO QUESTION # 18.a. Provide ground grid as described in items 1 to 3, of paragraph 3.4.L.
18.b. Is a ground ring around the perimeter of the room required for the grid system?
ANSWER TO QUESTION # 18.b. Ground ring is not required. Provide ground grid as described in
3.4.L.
18.c. Can the grid be connected with mechanical connectors or does it need to be exothermically welded?
ANSWER TO QUESTION # 18.c. Provide connectors in accordance with spec section 270526.2.3.C.
QUESTION # 19. Specs section grounding & bonding for communication systems page 270523-4, section
3.4 F mentions bonding the racks with #2 AWG.
Will each rack have it¿s own separate run to the ground bar or can they be connected to the ground ring for the raised floor with a mechanical connector or exothermically welded?
ANSWER TO QUESTION # 19. Racks can be connected to ground grid using mechanical connectors or exothermically welded. Racks will be provided by others.
QUESTION # 20 In regard to RFI #16 reading bidders shall submit past performance information for similar scope & size project to this one that is not available in CPARS.
20.a. Can we use previously completed Past
Performance Questionnaires to meet this requirement?
ANSWER TO QUESTION # 21. Yes, provided the contact information in the PPQ is current and verifiable.
20.b. How many past performance projects are
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12314218B0010/0002 required to be submitted?
ANSWER TO QUESTION # 20.b. Bidder may submit up to five, but no less than two, Past Performance information.
QUESTION # 21. I reviewed the sign in sheet from the USDA Data Center Project and I noticed that my firm wasn't on the listing. I was in attendance and my name was recorded by security up front. Unless I am mistaken, is there another list of attendees?
ANSWER TO QUESTION # 21. USDA made every effort to asked all attendees to sign-in once they arrived at the back of the cafeteria for the July
25, 2018 site visit. There is no access to the sign-in sheet that was located at the guard¿s entrance of the South Building. Suggest for bidder(s) to add their contact / firm information to the fbo "interested Vendors" list.
QUESTION # 22. Specs section grounding & bonding for communication systems page 270526-5, section
3.4 L mentions installing a grounding system for
the raised floor. Would you provide a detail drawing of how this should be installed? Is a ground ring around the perimeter of the room required for the grid system? Can the grid be connected with mechanical connectors or does it need to be exothermically welded?
ANSWER TO QUESTION # 22. Provide ground grid as described in items 1 to 3, of paragraph 3.4.L.
Ground ring is not required. Provide ground grid as described in 3.4.L. Provide mechanical connectors for the grid in accordance with spec section 270526.2.3.C.
QUESTION # 23. Specs section grounding & bonding for communication systems page 270523-4, section
3.4 F mentions bonding the racks with #2 AWG.
Will each rack have it¿s own separate run to the ground bar or can they be connected to the ground ring for the raised floor with a mechanical connector or exothermically welded?
ANSWER TO QUESTION # 23. Racks can be connected to ground grid using mechanical connectors or exothermically welded.
QUESTION # 24. The UPS can you please add
General Electric (GE) to the acceptable list of
UPS manufacturers in the specification 263353 -
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
4 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12314218B0010/0002
STATIC UNINTERRUPTIBLE POWER SUPPLY?
ANSWER TO QUESTION # 24. Assuming that GE provides products which meet the requirements of the specifications, GE would be acceptable manufacturer.
QUESTION # 25. The existing distribution switch board EDP-2 does that currently reside in the generator enclosure (that is being demo)?
ANSWER TO QUESTION # 25. Yes, the current EDP-2 currently resides inside the generator enclosure.
QUESTION # 26. The new distribution switch board EDP-2 will that be installed inside the New generator set enclosure?
ANSWER TO QUESTION # 26. Yes, the new EDP-2 will also reside inside the new generator set enclosure.
QUESTION # 27. The rental generator set has that been deleted from the Contract? In its entirety?
ANSWER TO QUESTION # 27. Yes.
QUESTION # 28. Per Addendum #1, bidders shall submit past performance information for similar scope and size. Is there are particular format to use to present this information?
ANSWER TO QUESTION # 28. No. Bidder to submit relevant current information that USDA may confirm by email and/or calling the individual(s) extending past performance information.
QUESTION # 29. 52.211-10 under Section F, states that performance shall commence within 1 calendar day after receipt of the notice of award. Form 1442 shows a 10 day period between receipt of award and start of work.
ANSWER TO QUESTION # 29. Period of Performance shall start 10 calendar days after Notice of
Award. Awardee shall submit, for approval, the
Performance and Payment bonds within the ten days after award takes place.
QUESTION # 30. was looking over the documents for the DOA Data Center project Sol 123142180010, I wanted to confirm that the only submission necessary for the bid is the first three pages of the solicitation package and the bid bond?
ANSWER TO QUESTION # 30. Bidder shall submit a
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
5 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12314218B0010/0002 signed & filled out SF-1442, signed SF-30s, bid bond, and past performance information.
QUESTION # 31. Specification Section 012100 ¿
ALLOWANCES, Part 3.3, Items A thru F, require allowances to be included in the bid; however, there is no bid form to submit prices for the requisite allowances. Will a revised bid form be provided or should we attach a separate page to the SF1442 or should total of the allowances be included in the base bid?
ANSWER TO QUESTION # 31. All allowances should be included as part of the base bid, as follows:
A. Allowance No. 1: Quantity Allowance: Include
100 sq. ft. of removal of deteriorated concrete and subsequent replacement and patching, and disposal of concrete off-site, as specified in
Section 030130 "Maintenance of Cast-In-Place
Concrete."
B. Allowance No. 2: Quantity Allowance: Include
40 ft. of floor joint repair, as specified in
Section 030130 "Maintenance of Cast-In-Place
Concrete.
C. Allowance No. 3: Quantity Allowance: Include
200 ft. for floor crack injection repair for concrete as specified in Section 030130
"Maintenance of Cast-In-Place Concrete."
D. Allowance No. 4: Quantity Allowance: Include
1300 sq. ft. for corrosion-inhibiting treatment of existing floor slab as specified in Section
030130 "Maintenance of Cast-In-Place Concrete."
E. Allowance No. 5: Quantity Allowance: Include
500 sq. ft. for polymer sealer application to existing traffic surfaces, as specified in
Section 030130 "Maintenance of Cast-in-Place
Concrete."
F. Allowance No. 6: Testing and Inspection
Allowance: Include the sum of $5,000.00 for testing and inspection to be provided by the
Contractor as specified in Section 030130
"Maintenance of Cast-in-Place Concrete."
QUESTION # 32. Specification Section 0191133 -
GENERAL COMMISSIONING REQUIREMENTS, Part 1.3, indicates a requirement for an allowance for
Commissioning, but it was not listed in Section
012100 ¿ ALLOWANCES, Part 3.3, Items A thru F.
Do you require an allowance for commissioning?
ANSWER TO QUESTION # 32. Yes, allowance for commissioning is required and should be part of
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
6 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12314218B0010/0002 the base bid.
QUESTION # 33. In regards to the USDA South
Building - Room 0410 Data Center Conversion, what¿s the amount for the bid bond? I cannot find it in the solicitation. Would it be 20% or 20% not to exceed a dollar amount?
ANSWER TO QUESTION # 33. 20%
**PROPOSAL DUE DATE AND TIME has been POSTPONED.
Hard copy proposals are due no later than
Thursday August 16, 2018 @ 1:00PM (EST). Place or location of bids remains unchanged (355 E
Street, S.W., 10th Floor, Patriots Plaza III , Washington, D.C. 20024-3243).
End of Amendment # 0002 dated August 8, 2018.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
8/7/2018 https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 1/9
General Decision Number: DC180002 08/03/2018 DC2
Superseded General Decision Number: DC20170002
State: District of Columbia
Construction Type: Building
County: District of Columbia Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018 3 03/23/2018 4 04/20/2018 5 05/04/2018 6 05/11/2018 7 06/15/2018 8 06/29/2018 9 07/06/2018 10 07/27/2018 11 08/03/2018
ASBE0024-007 10/01/2017
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 35.13 16.22
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-008 10/01/2017
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER.................$ 22.81 7.34
https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 2/9
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems
ASBE0024-014 10/01/2017
Rates Fringes
FIRESTOPPER......................$ 28.01 7.78
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
BRDC0001-002 04/29/2018
Rates Fringes
BRICKLAYER.......................$ 31.36 10.78
CARP0197-011 05/01/2018
Rates Fringes
CARPENTER, Includes Drywall Hanging, Form Work, and Soft Floor Laying-Carpet..............$ 28.71 12.08
CARP0219-001 05/01/2018
Rates Fringes
MILLWRIGHT.......................$ 34.24 11.23
CARP0441-001 05/01/2018
Rates Fringes
PILEDRIVERMAN....................$ 30.94 11.45
ELEC0026-016 11/06/2017
Rates Fringes
ELECTRICIAN, Includes Installation of HVAC/Temperature Controls........$ 45.15 17.15
ELEC0026-017 09/05/2016
Rates Fringes
ELECTRICAL INSTALLER (Sound & Communication Systems).........$ 27.55 10.20
SCOPE OF WORK: Includes low voltage construction, https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 3/9 installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEV0010-001 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 44.12 32.645+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
IRON0005-011 06/01/2017
Rates Fringes
IRONWORKER.......................$ 31.15 20.63
LABO0011-009 06/01/2017
Rates Fringes
LABORER: Skilled................$ 23.42 8.04
FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.
https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 4/9
MARB0002-004 04/29/2018
Rates Fringes
MARBLE/STONE MASON...............$ 37.91 17.08
INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)
MARB0003-006 04/29/2018
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 28.20 11.67
MARB0003-007 04/29/2018
Rates Fringes
TERRAZZO FINISHER................$ 23.28 10.72
MARB0003-008 04/29/2018
Rates Fringes
TILE SETTER......................$ 28.20 11.67
MARB0003-009 04/29/2018
Rates Fringes
TILE FINISHER....................$ 23.28 10.72
PAIN0051-014 06/01/2018
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 26.07 12.15 Glazing Contracts over $2 million.....................$ 30.31 12.15
PAIN0051-015 06/01/2017
Rates Fringes
PAINTER
Brush, Roller, Spray and Drywall Finisher............$ 25.06 9.66
PLAS0891-005 07/01/2018
Rates Fringes
PLASTERER........................$ 29.53 6.80
PLAS0891-006 02/01/2018
Rates Fringes https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 5/9
CEMENT MASON/CONCRETE FINISHER...$ 28.15 10.58
PLAS0891-007 08/01/2016
Rates Fringes
FIREPROOFER
Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.
PLUM0005-010 02/01/2018
Rates Fringes
PLUMBER..........................$ 41.67 17.60+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
* PLUM0602-008 08/01/2018
Rates Fringes
PIPEFITTER, Includes HVAC Pipe Installation................$ 41.64 21.57+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
ROOF0030-016 05/01/2016
Rates Fringes
ROOFER...........................$ 28.75 11.74
SFDC0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 34.40 19.24
SHEE0100-015 03/01/2018
Rates Fringes https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 6/9
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.27 18.87+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
SUDC2009-003 05/19/2009
Rates Fringes
LABORER: Common or General......$ 13.04 2.80
LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85
LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 7/9
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 8/9 for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
https://www.wdol.gov/wdol/scafiles/davisbacon/DC2.dvb?v=11 9/9
END OF GENERAL DECISION
| 12314218B0010 Amendment # 0002 dated August 08, 2018 |
| DC2 mod 0002 |
File details come from the government source that posted it.