About this file

This request for information (RFI) from the United States Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area solicits pricing to replace pneumatic control systems at the National Center for Cool Cold-Water Aquaculture in Leetown, West Virginia. The RFI provides responses to questions received regarding the scope of work, clarifying that offerors should include the cost of replacing approximately 13 additional heating water and chilled water valves with pneumatic actuators in the building, as well as removing pneumatic tubing from open mechanical spaces only. Offerors are asked to note if existing lab air valves cannot be retrofitted and to price replacement valves accordingly. The contracting officer will determine a reasonable time extension for the solicitation due date.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Pneumatic Control Systems at NCCCWA, newest first.
File Type Posted
12305B23Q0082a1.pdf PDF
10.2 mep 1 of 2.pdf PDF
10.0 Prov Clauses - WV Controls.docx DOCX document
10.3 MEP 2 O 2.pdf PDF
10.1 DIVISION 1 22MAR2023 USDA GEN. REQUIREMENTS.pdf PDF
12305B23Q0082.pdf PDF
8.0 WD.txt TXT text file
2.0 SOW 22MAR2023 Convert Pnuematic Cntrl Leestown.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI No. 1 Replace Pneumatic Control System NCCCWA Leetown, WV July 18, 2023

RE: RFI 1

Date: July 18, 2023 Solicitation: 12305B23Q0082 Project: Replace Pneumatic Control System at the National Center for Cool Cold-Water Aquaculture

Please see the following responses to the questions received to date for the solicitation to replace the pneumatic actuators at NCCCWA in Leetown.

· There approximately 13 heating water and chilled water valves that have pneumatic actuators within the building that were not mentioned in the scope of work. Should we include the cost of replacing these valves?

· USDA Response: Yes, please include the cost of replacing the heating water and chilled water valves.

· The SOW mentions removing all abandon pneumatic lines throughout the building. This could be very labor intensive. Would it be acceptable to remove the pneumatic tubing in just the open mechanical spaces?

· USDA Response: Yes, removing only the pneumatic tubing in the open mechanical spaces is acceptable.

· Is it the internet of this SOW to only retrofit the pneumatic actuator and associated control board for each of the existing lab air valves?

· USDA Response: The original intent was to retrofit just the pneumatic actuator on the existing valves. If the valves can’t be retrofitted or have reached the end of their useful life, please note that in your proposal and include a price for valve replacement.

· Is it possible to have the solicitation due date extended?

· USDA Response: Yes, the Contracting Officer will determine a reasonable time extension.