120Pricing__1_2_25__MADEX__4____REV1_.xlsx

XLSX spreadsheet 101 KB Posted

Attached to
Competitive Selection OH|DOT12026-2
Contract number
DOT12026-2
Issued by
Ohio

About this file

This document is a state-level pricing and contract agreement for revetment bags and erosion control materials, specifically issued by the Ohio Department of Transportation (ODOT). The contract is with MADEX CONSTRUCTION CO., located in Cleveland, Ohio, and covers pricing for various erosion control and revetment products across 12 different Ohio districts.

The contract provides detailed pricing for multiple erosion control and revetment products, including "Slingbag" concrete bags, "Rip Rap" scrim bags, "Flexamat Standard" concrete block mats, "Shorejax" concrete armor units, and various erosion control mats. Pricing is structured with volume-based tiers, with different rates depending on the quantity purchased and the specific district. The contract includes not only material pricing but also installation rates, equipment rental costs, and labor rates. Additional provisions cover mobilization expenses, weekend and weeknight work multipliers, and potential prevailing wage rate adjustments. The contract appears designed to provide ODOT with flexible, comprehensive pricing for erosion control and revetment projects across the state.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Information

120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25
VENDOR INFORMATION
Vendor NameMADEX CONSTRUCTION CO.
Address8300 BESSEMER AVE.
CityCLEVELAND
StateOHIO
Contact NameMICHAEL DOBRONOS
Contact Number216-789-3632

DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT. DOING SO MAY RESULT IN REJECTION OF YOUR BID.

SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS

DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT

Do not submit previous versions (pricing pages) of the same contract.

&8Plant Information - &P

REVETMENT PURCHASE ONLY

120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25

Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration.
Vendor Name:MADEX CONSTRUCTION CO.
ODOT WILL UTILIZE THIS PRICING PAGE WHEN THE WORK IS DONE BY ODOT FORCES.
RATES PROVIDED ON THIS PAGE ARE FOR REVETMENT BAGS TO BE PURCHASED BY ODOT.
DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED.
WITH DELIVERY SET UP AS F.O.B., AND TO ADDRESS THE RANGE OF DISTANCES THAT MAY BE TRAVELLED, PRICING HAS BEEN ESTABLISHED PER DISTRICT.
VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS.
OPTION #1RANGEDISTRICT
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
RVT #123Each19$13.00$14.00$15.00$16.00$9.00$8.00$9.00$10.00$9.00$11.00$14.00$16.00
1019$12.50$13.50$14.50$15.50$8.50$7.50$8.50$9.50$8.50$10.50$13.50$15.50
20or more$11.75$12.75$13.75$14.75$7.75$6.75$7.75$8.75$7.75$9.75$12.75$14.75

PRODUCT: REVETMENT BAGS Description of Product

List Product Name ----> VARIOUS REVETMENT PRODUCTS

OPTION #1RANGEDISTRICT"SLINGBAG" BY QUIKRETE. ONE (1) PALLET CONSISTS OF 56 EACH - 60 LB 4000 PSI BURLAP BAGS. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
45"X48"X36"PALLET16$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00
7or more$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00
OPTION #2RANGEDISTRICT"RIP RAP" 80 LB SCRIM BAG BY QUIKRETE PACKAGED IN A FIBER REINFORCED, BIODEGRADABLE BAG. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
20.5"X14"X4"BAG42or more$29.00$29.00$28.50$28.00$29.00$29.00$29.50$29.50$28.50$28.50$28.50$28.00
OPTION #3RANGEDISTRICT"FLEXAMAT STANDARD" IS A VEGETATED CONCRETE BLOCK MAT UTILIZED FOR STABILIXING SLOPES, CHANNELS, LOW WATER CROSSINGS, INLET/OUTLET PROTECTION, ETC. FLEXAMAT STANDARD IS OFFERED IN 4', 5.5', 8', 10', 12' 15.5' AND 16' WIDTHS WITH 30', 40', AND 50' ROLL LENGTHS. ODOT APPROVED QPL 712.12 TIED CONCRETE BLOCK MAT. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
VARIESSQUARE FOOT1or more$13.00$14.00$13.00$13.00$12.00$12.00$12.00$12.00$12.00$14.00$14.00$14.00
OPTION #4RANGEDISTRICT"SHOREJAX 24" CONCRETE ARMOR UNIT" SHOREJAX ARE A FLEXIBLE INTERLOCKING CONCRETE ARMOR UNIT AVAILBLE IN A VARIETY OF SIZES. SHOREJAX ARE USED TO RESIST THE EROSIVE FORCES GENERATED DUE TO HIGH VELOCITY WATER SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
24"X16"X4"EACH27or more$50.00$50.00$50.00$50.00$50.00$50.00$50.00$50.00$50.00$50.00$50.00$50.00
OPTION #5RANGEDISTRICT"FILTERPOINT BY FABRIFORM" IS A DOUBLE-LAYER NYLON FABRIC FORM DESIGNED FOR CONCRETE REVETMENT SOLUTIONS FOR EROSION CONTROL. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
VARIESSQUARE FOOT1or more$7.50$7.50$7.50$7.50$7.50$7.50$7.50$7.50$7.50$7.50$7.50$7.50
OPTION #6RANGEDISTRICT"ARMOR FLEX BY CONTECH" IS A FLEXIBLE, INTERLOCKING MATRIX OF CELLULAR CONCRETE BLOCKS USED TO ARMOR EROSION CONTROL. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
VARIESSQUARE FOOT1000or more$125.00$125.00$125.00$125.00$125.00$125.00$125.00$125.00$125.00$125.00$125.00$125.00

&8Material Pricing - &P

EROSION CNTRL PURCHASE ONLY

120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25

Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration.
Vendor Name:MADEX CONSTRUCTION CO.
ODOT WILL UTILIZE THIS PRICING PAGE WHEN THE WORK IS DONE BY ODOT FORCES.
RATES PROVIDED ON THIS PAGE ARE FOR EROSION CONTROL MATS TO BE PURCHASED BY ODOT.
DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED.
WITH DELIVERY SET UP AS F.O.B., AND TO ADDRESS THE RANGE OF DISTANCES THAT MAY BE TRAVELLED, PRICING HAS BEEN ESTABLISHED PER DISTRICT.
VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS.
OPTION #1RANGEDISTRICT
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
RVT #123Each19$13.00$14.00$15.00$16.00$9.00$8.00$9.00$10.00$9.00$11.00$14.00$16.00
1019$12.50$13.50$14.50$15.50$8.50$7.50$8.50$9.50$8.50$10.50$13.50$15.50
20or more$11.75$12.75$13.75$14.75$7.75$6.75$7.75$8.75$7.75$9.75$12.75$14.75

PRODUCT: EROSION CONTROL MATS Description of Product

List Product Name ----> VARIOUS EROSION CONTROL MATS

OPTION #1RANGEDISTRICT"CURLEX ENFORCER" ODOT SS 836 TURF RINFORCING MAT TYPE 2. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
8'X67'ROLL114$531.60$531.60$531.60$531.60$531.60$531.60$531.60$531.60$531.60$531.60$531.60$531.60
15or more$332.25$332.25$332.25$332.25$332.25$332.25$332.25$332.25$332.25$332.25$332.25$332.25
OPTION #2RANGEDISTRICT"RECYCLEX TRM" ODOT SS 836 TURF RINFORCING MAT TYPE 3. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
8'X90'ROLL114$632.08$632.08$632.08$632.08$632.08$632.08$632.08$632.08$632.08$632.08$632.08$632.08
15or more$395.05$395.05$395.05$395.05$395.05$395.05$395.05$395.05$395.05$395.05$395.05$395.05
OPTION #3RANGEDISTRICT"TRINET RECYCLEX" ODOT SS 836 TURF RINFORCING MAT TYPE 4. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
8'X67.5'ROLL114$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04$1,009.04
15or more$630.65$630.65$630.65$630.65$630.65$630.65$630.65$630.65$630.65$630.65$630.65$630.65
OPTION #4RANGEDISTRICT"AEC PREMIER STRAW SN" ODOT 712.11 TEMPORARY EROSION CONTROL MAT TYPE A. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
8'X112.5'ROLL125$99.65$99.65$99.65$99.65$99.65$99.65$99.65$99.65$99.65$99.65$99.65$99.65
26or more$79.72$79.72$79.72$79.72$79.72$79.72$79.72$79.72$79.72$79.72$79.72$79.72
OPTION #5RANGEDISTRICT"AEC PREMIER STRAW DN" ODOT 712.11 TEMPORARY EROSION CONTROL MAT TYPE B. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
8'X112.5'ROLL125$118.70$118.70$118.70$118.70$118.70$118.70$118.70$118.70$118.70$118.70$118.70$118.70
26or more$94.96$94.96$94.96$94.96$94.96$94.96$94.96$94.96$94.96$94.96$94.96$94.96
OPTION #6RANGEDISTRICT"AEC PEMIER STRAW COCONUT" ODOT 712.11 TEMPORARY EROSION CONTROL MAT TYPE C. SEE ATTACHED DATA SHEET.
DIMENSIONS of BagUnit of MeasureMINMAX123456789101112
8'x112.5'ROLL120$217.60$217.60$217.60$217.60$217.60$217.60$217.60$217.60$217.60$217.60$217.60$217.60
21or more$174.08$174.08$174.08$174.08$174.08$174.08$174.08$174.08$174.08$174.08$174.08$174.08

VENDOR INSTALL(Revetment) 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 NOTE: VENDORS PROVIDING RATES ON THIS PAGE

VENDOR IS "REQUIRED" TO PROVIDE RATES ON THE "EQUIPMENT & OPERATOR PRICING" TAB.

MATERIAL PRICING: PRODUCT REVETMENT BAGSGALLONS (GL)
Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration.POUNDS (LB)
Vendor Name:MADEX CONSTRUCTION CO.SQUARE FT (SQFT)
SQUARE YD (SQYD)
PRICING ESTABLISHED ON THIS PAGE WILL BE UTILIZED WHEN THE VENDOR IS REQUESTED TO INSTALL REVETMENT BAGS.CUBIC FT (CUFT)
CUBIC YD (CUYD)
DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED.EACH
<--- OTHER
VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS.
Bid ItemPRODUCT: REVETMENT BAGSUnit of Measure
(Select from dropdown menu)RangeMaterial ONLY Pricing:
$ / U.M. Installed by VendorDescription of Product
If volume discount is offered, provide ranges
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #1 REVETMENT BAGSMIN17INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAX6or more
List Product --->SLINGBAG BY QUIKRETEEACH$$425.00$425.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #2 REVETMENT BAGSMIN42INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAXor more
List Product --->RIP RAP BY QUIKRETEEACH$$15.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #3 REVETMENT BAGSMIN1INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAXor more
List Product --->FLEXAMAT STANDARDSQUARE FT (SQFT)$$25.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #4 REVETMENT BAGSMIN27INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAXor more
List Product --->SHOREJAX 24" CONCRETE ARMOR UNITEACH$$30.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #5 REVETMENT BAGSMIN1INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAXor more
List Product --->FILTERPOINT BY FABRIFORMSQUARE FT (SQFT)$$50.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #6 REVETMENT BAGSMIN1000INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAXor more
List Product --->ARMOR FLEX BY CONTECHSQUARE FT (SQFT)$$75.00

Below, List all materials necessary for the installation of the products listed.

Item Materials to be purchased at time of project Unit of Measure Unit Price The Cost of Materials can vary by location, availability, and time of year.

When installation is requested, materials to be purchased locally at the time of the installation, ODOT will reach out to the vendors on contract to obtain a quote for final pricing of materials.

ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Products must be on list at left.

ODOT APPROVED GEOTEXTILE FABRICS TYPE A, B, C, DSYTBD
CONCRETECYTBD
GROUTCYTBD
REBARLBTBD
AGGREGATE, #304, #57, RCP, ETC.TONTBD
GRASS SEED/FERTILIZERLBTBD
STRAWBALETBD
TOPSOILCYTBD
WATERMGALTBD
ItemAdditional Materials - Vendor SuppliedUnit of MeasureUnit Price

VENDOR INSTALL(Erosion Cntrl) 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 NOTE: VENDORS PROVIDING RATES ON THIS PAGE

VENDOR IS "REQUIRED" TO PROVIDE RATES ON THE "EQUIPMENT & OPERATOR PRICING" TAB.

MATERIAL PRICING: PRODUCT: EROSION CONTROL MATSGALLONS (GL)
Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration.POUNDS (LB)
Vendor Name:MADEX CONSTRUCTION CO.SQUARE FT (SQFT)
SQUARE YD (SQYD)
PRICING ESTABLISHED ON THIS PAGE WILL BE UTILIZED WHEN THE VENDOR IS REQUESTED TO INSTALL EROSION CONTROL MATS.CUBIC FT (CUFT)
CUBIC YD (CUYD)
DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED.EACH
<--- OTHER
VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS.
Bid ItemPRODUCT: EROSION CONTROL MATSUnit of Measure
(Select from dropdown menu)RangeMaterial ONLY Pricing:
$ / U.M. Installed by VendorDescription of Product
If volume discount is offered, provide ranges
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #1: EROSION CONTROL MATSMIN115INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAX14or more
List Product --->CURLEX ENFORCERROLL<--- OTHER$$425.00$425.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #2: EROSION CONTROL MATSMIN115INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAX14or more
List Product --->RECYCLEX TRMROLL<--- OTHER$$425.00$425.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #3: EROSION CONTROL MATSMIN115INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAX14or more
List Product --->TRINET RECYCLEXROLL<--- OTHER$$425.00$425.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #4: EROSION CONTROL MATSMIN126INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAX25or more
List Product --->AEC PREMIER STRAW SNROLL<--- OTHER$$425.00$425.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #5: EROSION CONTROL MATSMIN126INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAX25or more
List Product --->AEC PREMIER STRAW DNROLL<--- OTHER$$425.00$425.00
RANGE 1RANGE 2RANGE 3
OPTION/SIZE #6: EROSION CONTROL MATSMIN121INSTALLATION ONLY PRICE. ADD MATERIAL PURCHASE PRICE ONLY TO THIS PRICE TO INCLUDE VENDOR INSTALLED TOTAL PRICE
MAX20or more
List Product --->AEC PEMIER STRAW COCONUTROLL<--- OTHER$$425.00$425.00

Below, List all materials necessary for the installation of the products listed.

Item Materials to be purchased at time of project Unit of Measure Unit Price The Cost of Materials can vary by location, availability, and time of year.

When installation is requested, materials to be purchased locally at the time of the installation, ODOT will reach out to the vendors on contract to obtain a quote for final pricing of materials.

ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Products must be on list at left.

GRASS SEED/FERTILIZERLBTBD
TOPSOILCYTBD
WATERMGALTBD
STAPLESBOXTBD
TBD
TBD
TBD
TBD
TBD
ItemAdditional Materials - Vendor SuppliedUnit of MeasureUnit Price

VENDOR INSTALL (Erosion Cntrl) 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 NOTE: VENDORS PROVIDING RATES ON THIS PAGE

IS "REQUIRED" TO PROVIDE RATES ON THE "EQUIPMENT & OPERATOR PRICING" TAB.

MATERIAL PRICING: PRODUCT: EROSION CONTROL MATSGALLONS (GL)
Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration.POUNDS (LB)
Vendor Name:MADEX CONSTRUCTION CO.SQUARE FT (SQFT)
SQUARE YD (SQYD)
PRICING ESTABLISHED ON THIS PAGE WILL BE UTILIZED WHEN THE VENDOR IS REQUESTED TO INSTALL EROSION CONTROL MATS.

DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED.

VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS.
CUBIC FT (CUFT)
Bid ItemPRODUCT: EROSION CONTROL MATSUnit of Measure
(Select from dropdown menu)RangeMaterial ONLY Pricing:
$ / U.M. Installed by VendorCOMMENTS - Description of WorkCUBIC YD (CUYD)
If volume discount is offered, provide rangesEACH
RANGE 1RANGE 2RANGE 3<--- OTHER
OPTION #1: EROSION CONTROL MATSMIN1
MAX
List Product --->$
RANGE 1RANGE 2RANGE 3
OPTION #1: EROSION CONTROL MATSMIN1
MAX
List Product --->$
RANGE 1RANGE 2RANGE 3
OPTION #1: EROSION CONTROL MATSMIN1
MAX
List Product --->$
RANGE 1RANGE 2RANGE 3
OPTION #1: EROSION CONTROL MATSMIN1
MAX
List Product --->$
RANGE 1RANGE 2RANGE 3
OPTION #1: EROSION CONTROL MATSMIN1
MAX
List Product --->$
RANGE 1RANGE 2RANGE 3
OPTION #1: EROSION CONTROL MATSMIN1
MAX
List Product --->$
1
PRODUCT: EROSION CONTROL MATSMIN1
MAX
List Product --->$

The District Geotechnical Engineer will inspect the installation site and determine the appropriate revetment and/or erosion control application. The District Geotechnical Engineer will also contact the District Environmental Coordinator (DEC). The DEC will identify any environmental requirements in the work zone and obtain the necessary permits, approvals and conditions, of which the vendor shall comply. The vendor will then install the revetment bags or erosion control mats.

Below, List all materials necessary for the installation of the products listed.

Item Description Unit of Measure Unit Price

Equipment & Operator Pricing

120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25
EQUIPMENT PRICING and OPERATOR(S) / Mobilization
Vendor Name:MADEX CONSTRUCTION CO.
IDENTIFY any equipment that will be used for the installation of revetment bags or erosion contrrol mats.Mobilization
Price quoted shall be firm for the contract of the duration.
REVETMENT BAGSEROSION CONTROL MATS
When an operator is necessary for equipment being utilized, the unit price shall be the combined price of both.
Note: A project will consist of a work site that is continuous along the centerline of the roadway. When the work site is not continuous, a project will consist of all individual work sites within the county.To / FromMobilization
Cost to JobMobilization
Cost between CountiesMobilization
Cost to JobMobilization

Cost between Counties

Note: Vendors providing rates on this page are REQUIRED to provide material rates on the "VENDOR INSTALL (Revetment)" and " VENDOR INSTALL (Erosion Cntrl)" TABS.District 1$7,500.00$2,500.00$7,500.00$2,500.00
District 2$7,500.00$2,500.00$7,500.00$2,500.00
District 3$6,600.00$2,500.00$6,600.00$2,500.00
IDENTIFY EQUIPMENT FOR INSTALLATION OF MATERIALSDistrict 4$6,600.00$2,500.00$6,600.00$2,500.00
District 5$7,250.00$2,500.00$7,250.00$2,500.00
EXAMPLEDistrict 6$7,250.00$2,500.00$7,250.00$2,500.00
TypeMakeModelUnit Price per HourUnit Price per Day**Unit Price per Week**District 7$7,500.00$2,500.00$7,500.00$2,500.00
District 8$7,500.00$2,500.00$7,500.00$2,500.00
Excavator, Track (125 HP class)CAT314/315$100.00$600.00$2,700.00District 9$7,500.00$2,500.00$7,500.00$2,500.00
Dozer (125 HP class)CATD6K2$200.00$1,200.00$5,400.00District 10$7,500.00$2,500.00$7,500.00$2,500.00
TypeMakeModelUnit Price per HourUnit Price per Day**Unit Price per Week**District 11$7,500.00$2,500.00$7,500.00$2,500.00
District 12$6,500.00$2,500.00$6,500.00$2,500.00
MINI EXCAVATORCAT305$52.00$400.00$2,000.00
TRACK LOADERTAKEUCHITL8R2$52.00$400.00$2,000.00
1 TON DUMP TRUCKCHEVY3500HD$30.00$240.00$1,200.00
5 TON DUMP TRUCKGMC6500 HD$60.00$480.00$2,400.00
MIDI EXCAVATORTAKEUCHITB290$75.00$600.003000
15 TON EXCAVATORKOMATSUPC158$125.00$1,000.00$5,000.00
30 TON EXCAVATORCAT320$300.00$2,400.00$12,000.00
SKID STEERMUSTANG940$50.00$400.00$2,000.00
WHEEL LOADER
WACKER NEUSONWL50$60.00$480.00$2,400.00
PREVAILING WAGE RATE
LABOR CLASSIFICATION (Operator, Laborer, Mason, etc.)
TypeUnit Price per HourUnit Price per Day**Unit Price per Week**Unit Price per HourIf it is determined that a project is subject to Prevailing Wage Rates, provide the Prevailing Wage Rate to be used for the Identified personnel.
OPERATOR$20.00$100.00$450.00$25.00
FOREMAN$85.00$680.00$3,400.00$130.00
OPERATOR$80.00$640.00$3,200.00$120.00
LABORER$75.00$600.00$3,000.00$112.50
FINISHER$80.00$640.00$3,200.00$120.00
Traffic Control, Flagging OperationsPREVAILING WAGE RATE
Unit Price per HourUnit Price per Day**Unit Price per Week**
FLAGGER$98.00$784.00$3,920.00$119.00
Lump Sum
Traffic Control for a lane closure of up to 500’ work zone$4,750.00
Traffic Control for a lane closure of a 501 ' to 1000’ work zone$6,750.00
Traffic Control for each additional 250' of work zone lane closure.$500.00

* FOR THE PURPOSE OF THIS CONTRACT, WORK ZONE IS CONSIDERED THE DISTANCE BETWEEN THE BEGINNNING AND ENDING LOCATION OF THE TO BE INSTALLED REVETMENT BAGS OR EROSION CONTROL MATS

** UNIT PRICE PER DAY BASED ON 8HR DAY, UNIT PRICE PER WEEK BASED ON 40HR WEEK.

&8Equipment Pricing - &P

WkEndWkNight Work

120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25
Multiplier Adjustments
Vendor Name:MADEX CONSTRUCTION CO.
The following quoted multiplier will be used to adjust the total costs supplied herein for labor, equipment and material to cover additional costs associated with WEEKNIGHT work:
MULTIPLIER1.25
The following quoted multiplier will be used to adjust the total costs supplied herein for labor, equipment and material to cover additional costs associated with WEEKEND work:
MULTIPLIER1.5
Weeknight work is defined as any work performed between the hours of 7:00 pm to 6:00 am Monday through Thursday and 7:00 pm Friday through 12:00 midnight Friday.
Weekend work is defined as any work performed between the hours of 12:00 midnight Friday until 6:00 am Monday.
Example:
Total Costs SuppliedMultiplierTotal Costs to be Paid
$30.00X 1.15$34.50