The file's text, extracted by GovTribe without its formatting.
Vendor Information
| 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 | |
| VENDOR INFORMATION | |
| Vendor Name | Guardian Retention Systems,LLC |
| Address | 116 Cabin Creek Drive | 116 Cabin Creek Drive | 116 Cabin Creek Drive | 116 Cabin Creek Drive | 116 Cabin Creek Drive | 116 Cabin Creek Drive |
| City | Brooks | Brooks | Brooks | Brooks | Brooks | Brooks |
| State | Kentucky | Kentucky | Kentucky | Kentucky | Kentucky | Kentucky |
| Contact Name | John Garfield | John Garfield | John Garfield | John Garfield | John Garfield | John Garfield |
| Contact Number | 502-528-0712 | 502-528-0712 | 502-528-0712 | 502-528-0712 | 502-528-0712 | 502-528-0712 |
DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT. DOING SO MAY RESULT IN REJECTION OF YOUR BID.
SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS
DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT
Do not submit previous versions (pricing pages) of the same contract.
&8Plant Information - &P
REVETMENT PURCHASE ONLY
120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25
| Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration. | |
| Vendor Name: | Guardian Retention Systems,LLC |
| ODOT WILL UTILIZE THIS PRICING PAGE WHEN THE WORK IS DONE BY ODOT FORCES. | |
| RATES PROVIDED ON THIS PAGE ARE FOR REVETMENT BAGS TO BE PURCHASED BY ODOT. |
| DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED. |
| WITH DELIVERY SET UP AS F.O.B., AND TO ADDRESS THE RANGE OF DISTANCES THAT MAY BE TRAVELLED, PRICING HAS BEEN ESTABLISHED PER DISTRICT. |
| VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS. |
| OPTION #1 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| RVT #123 | Each | 1 | 9 | $13.00 | $14.00 | $15.00 | $16.00 | $9.00 | $8.00 | $9.00 | $10.00 | $9.00 | $11.00 | $14.00 | $16.00 |
| | 10 | 19 | $12.50 | $13.50 | $14.50 | $15.50 | $8.50 | $7.50 | $8.50 | $9.50 | $8.50 | $10.50 | $13.50 | $15.50 |
| | 20 | or more | $11.75 | $12.75 | $13.75 | $14.75 | $7.75 | $6.75 | $7.75 | $8.75 | $7.75 | $9.75 | $12.75 | $14.75 |
PRODUCT: REVETMENT BAGS Description of Product
List Product Name ---->
| OPTION #1 | | RANGE | | DISTRICT | | | | | | | | | | | | 1' tall x 3' long with 27" base, reuseable sand bag repalcement, has lifting straps and can be connected together to make a continous system, weighs approx. 500lbs filled with sand |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
| VersaShield 1- 1'x3' | EA | 1 | 50 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | $62.19 | |
| | 51 | 100 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | $61.19 | |
| | 102 | 199 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | $60.19 | |
| | 200 | | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | $59.19 | |
| OPTION #2 | | RANGE | | DISTRICT | | | | | | | | | | | | 2' tall x 4' long with 36" base, reuseable sand bag repalcement, has lifting straps and can be connected together to make a continous system, weighs approx. 2800lbs filled with sand |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
| VersaShield 2- 2'x4' | EA | 1 | 50 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | $86.76 | |
| | 51 | 100 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | $85.76 | |
| | 102 | 199 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | $84.76 | |
| | 200 | | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | $83.76 | |
| OPTION #3 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #4 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #5 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #6 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
&8Material Pricing - &P
EROSION CNTRL PURCHASE ONLY
120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25
| Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration. | |
| Vendor Name: | Guardian Retention Systems,LLC |
| ODOT WILL UTILIZE THIS PRICING PAGE WHEN THE WORK IS DONE BY ODOT FORCES. | |
| RATES PROVIDED ON THIS PAGE ARE FOR EROSION CONTROL MATS TO BE PURCHASED BY ODOT. |
| DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED. |
| WITH DELIVERY SET UP AS F.O.B., AND TO ADDRESS THE RANGE OF DISTANCES THAT MAY BE TRAVELLED, PRICING HAS BEEN ESTABLISHED PER DISTRICT. |
| VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS. |
| OPTION #1 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| RVT #123 | Each | 1 | 9 | $13.00 | $14.00 | $15.00 | $16.00 | $9.00 | $8.00 | $9.00 | $10.00 | $9.00 | $11.00 | $14.00 | $16.00 |
| | 10 | 19 | $12.50 | $13.50 | $14.50 | $15.50 | $8.50 | $7.50 | $8.50 | $9.50 | $8.50 | $10.50 | $13.50 | $15.50 |
| | 20 | or more | $11.75 | $12.75 | $13.75 | $14.75 | $7.75 | $6.75 | $7.75 | $8.75 | $7.75 | $9.75 | $12.75 | $14.75 |
PRODUCT: EROSION CONTROL MATS Description of Product
List Product Name ---->
| OPTION #1 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #2 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #3 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #4 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #5 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
| OPTION #6 | | RANGE | | DISTRICT | | | | | | | | | | | |
| DIMENSIONS of Bag | Unit of Measure | MIN | MAX | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| | 1 | | | | | | | | | | | | | |
VENDOR INSTALL(Revetment) 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 NOTE: VENDORS PROVIDING RATES ON THIS PAGE
VENDOR IS "REQUIRED" TO PROVIDE RATES ON THE "EQUIPMENT & OPERATOR PRICING" TAB.
| MATERIAL PRICING: PRODUCT REVETMENT BAGS | | GALLONS (GL) |
| Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration. | | POUNDS (LB) |
| Vendor Name: | Guardian Retention Systems,LLC | SQUARE FT (SQFT) |
| | SQUARE YD (SQYD) |
| PRICING ESTABLISHED ON THIS PAGE WILL BE UTILIZED WHEN THE VENDOR IS REQUESTED TO INSTALL REVETMENT BAGS. | | CUBIC FT (CUFT) |
| | CUBIC YD (CUYD) |
| DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED. | | EACH |
| | <--- OTHER |
| VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS. | | |
| Bid Item | PRODUCT: REVETMENT BAGS | | Unit of Measure | | | | | |
| (Select from dropdown menu) | Range | Material ONLY Pricing: | | | | | | | |
| $ / U.M. Installed by Vendor | | | Description of Product | | | | | | |
| | | | | If volume discount is offered, provide ranges | | | | |
| | | | | | RANGE 1 | RANGE 2 | RANGE 3 | |
| OPTION/SIZE #1 REVETMENT BAGS | | | | MIN | 1 | | | 2' tall x 50' long, has 25 individual cells |
| | | | | MAX | | | | |
| List Product ---> | 2' PermaShield | | EACH | $ | $1,782.50 | | | |
| | | | RANGE 1 | RANGE 2 | RANGE 3 | |
| OPTION/SIZE #2 REVETMENT BAGS | | | MIN | 1 | | | 3' tall x 50' long, has 25 individual cells |
| | | MAX | | | | |
| List Product ---> | 3' PermaShield | EACH | $ | $2,225.50 | | | |
| | | | RANGE 1 | RANGE 2 | RANGE 3 | |
| OPTION/SIZE #3 REVETMENT BAGS | | | MIN | 1 | | | 4' tall x 50' long, has 25 individual cells |
| | | MAX | | | | |
| List Product ---> | 4' PermaShield | EACH | $ | $2,880.50 | | | |
| | | | RANGE 1 | RANGE 2 | RANGE 3 | |
| OPTION/SIZE #4 REVETMENT BAGS | | | MIN | 1 | | | 6' tall x 50' long, has 25 individual cells |
| | | MAX | | | | |
| List Product ---> | 6' PermaShield | EACH | $ | $3,927.00 | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #5 REVETMENT BAGS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #6 REVETMENT BAGS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
Below, List all materials necessary for the installation of the products listed.
Item Materials to be purchased at time of project Unit of Measure Unit Price The Cost of Materials can vary by location, availability, and time of year.
When installation is requested, materials to be purchased locally at the time of the installation, ODOT will reach out to the vendors on contract to obtain a quote for final pricing of materials.
ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
Products must be on list at left.
| 3500 psi Pumpable concrete | CU YRDS | TBD |
| type D rip rap (used as back fill Material) | Tons | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| Item | Additional Materials - Vendor Supplied | Unit of Measure | Unit Price |
VENDOR INSTALL(Erosion Cntrl) 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 NOTE: VENDORS PROVIDING RATES ON THIS PAGE
VENDOR IS "REQUIRED" TO PROVIDE RATES ON THE "EQUIPMENT & OPERATOR PRICING" TAB.
| MATERIAL PRICING: PRODUCT: EROSION CONTROL MATS | | GALLONS (GL) |
| Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration. | | POUNDS (LB) |
| Vendor Name: | Guardian Retention Systems,LLC | SQUARE FT (SQFT) |
| | SQUARE YD (SQYD) |
| PRICING ESTABLISHED ON THIS PAGE WILL BE UTILIZED WHEN THE VENDOR IS REQUESTED TO INSTALL EROSION CONTROL MATS. | | CUBIC FT (CUFT) |
| | CUBIC YD (CUYD) |
| DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED. | | EACH |
| | <--- OTHER |
| VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS. | | |
| Bid Item | PRODUCT: EROSION CONTROL MATS | | Unit of Measure | | | | |
| (Select from dropdown menu) | Range | Material ONLY Pricing: | | | | | | |
| $ / U.M. Installed by Vendor | | | Description of Product | | | | | |
| | | | | If volume discount is offered, provide ranges | | | |
| | | | | | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #1: EROSION CONTROL MATS | | | | MIN | 1 | | |
| | | | | MAX | | | |
| List Product ---> | | | | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #2: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #3: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #4: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #5: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION/SIZE #6: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
Below, List all materials necessary for the installation of the products listed.
Item Materials to be purchased at time of project Unit of Measure Unit Price The Cost of Materials can vary by location, availability, and time of year.
When installation is requested, materials to be purchased locally at the time of the installation, ODOT will reach out to the vendors on contract to obtain a quote for final pricing of materials.
ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
Products must be on list at left.
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| | | TBD |
| Item | Additional Materials - Vendor Supplied | Unit of Measure | Unit Price |
VENDOR INSTALL (Erosion Cntrl) 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 NOTE: VENDORS PROVIDING RATES ON THIS PAGE
IS "REQUIRED" TO PROVIDE RATES ON THE "EQUIPMENT & OPERATOR PRICING" TAB.
| MATERIAL PRICING: PRODUCT: EROSION CONTROL MATS | | GALLONS (GL) |
| Unit Bid Pricing submitted must be guaranteed firm for the entire contract duration. | | POUNDS (LB) |
| Vendor Name: | Guardian Retention Systems,LLC | SQUARE FT (SQFT) |
| | SQUARE YD (SQYD) |
| PRICING ESTABLISHED ON THIS PAGE WILL BE UTILIZED WHEN THE VENDOR IS REQUESTED TO INSTALL EROSION CONTROL MATS. | | |
DO NOT PROVIDE CONDITIONAL INFORMATION THAT MAY ALTER THE TERMS OF THE BID. IF CONDITIONAL INFORMATION IS SUPPLIED, YOUR BID MAY BE REJECTED.
| VENDOR MAY ESTABLISH RANGES FOR VOLUME DISCOUNTS. | | | | | | | | | |
| | | | | | | | | | CUBIC FT (CUFT) |
| Bid Item | PRODUCT: EROSION CONTROL MATS | | Unit of Measure | | | | | | |
| (Select from dropdown menu) | Range | Material ONLY Pricing: | | | | | | | | |
| $ / U.M. Installed by Vendor | | | COMMENTS - Description of Work | | | | | | CUBIC YD (CUYD) | |
| | | | | | If volume discount is offered, provide ranges | | | | EACH |
| | | | | | RANGE 1 | RANGE 2 | RANGE 3 | | <--- OTHER |
| OPTION #1: EROSION CONTROL MATS | | | | MIN | 1 | | | | |
| | | | | MAX | | | | | |
| List Product ---> | | | | $ | | | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION #1: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION #1: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION #1: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION #1: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| | RANGE 1 | RANGE 2 | RANGE 3 |
| OPTION #1: EROSION CONTROL MATS | MIN | 1 | | |
| MAX | | | |
| List Product ---> | $ | | | |
| 1 | | |
| PRODUCT: EROSION CONTROL MATS | MIN | 1 |
| MAX | |
| List Product ---> | $ | |
The District Geotechnical Engineer will inspect the installation site and determine the appropriate revetment and/or erosion control application. The District Geotechnical Engineer will also contact the District Environmental Coordinator (DEC). The DEC will identify any environmental requirements in the work zone and obtain the necessary permits, approvals and conditions, of which the vendor shall comply. The vendor will then install the revetment bags or erosion control mats.
Below, List all materials necessary for the installation of the products listed.
Item Description Unit of Measure Unit Price
Equipment & Operator Pricing
| 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 | |
| EQUIPMENT PRICING and OPERATOR(S) / Mobilization | |
| Vendor Name: | Guardian Retention Systems,LLC |
| IDENTIFY any equipment that will be used for the installation of revetment bags or erosion contrrol mats. | Mobilization | | |
| Price quoted shall be firm for the contract of the duration. | | | |
| | REVETMENT BAGS | EROSION CONTROL MATS |
| When an operator is necessary for equipment being utilized, the unit price shall be the combined price of both. | | | |
| | Note: A project will consist of a work site that is continuous along the centerline of the roadway. When the work site is not continuous, a project will consist of all individual work sites within the county. | To / From | Mobilization |
| Cost to Job | Mobilization | | | |
| Cost between Counties | | Mobilization | | |
| Cost to Job | Mobilization | | | |
Cost between Counties
| Note: Vendors providing rates on this page are REQUIRED to provide material rates on the "VENDOR INSTALL (Revetment)" and " VENDOR INSTALL (Erosion Cntrl)" TABS. | | | | | | District 1 | $10,500.00 |
| | | | | | District 2 | $10,500.00 |
| | | | | | District 3 | $10,500.00 |
| IDENTIFY EQUIPMENT FOR INSTALLATION OF MATERIALS | | | | | | District 4 | $10,500.00 |
| | | | | | District 5 | $9,500.00 |
| EXAMPLE | | | | | | District 6 | $9,500.00 |
| Type | Make | Model | Unit Price per Hour | Unit Price per Day** | Unit Price per Week** | District 7 | $9,500.00 |
| | | | | | District 8 | $8,500.00 |
| Excavator, Track (125 HP class) | CAT | 314/315 | $100.00 | $600.00 | $2,700.00 | District 9 | $8,500.00 |
| Dozer (125 HP class) | CAT | D6K2 | $200.00 | $1,200.00 | $5,400.00 | District 10 | $8,500.00 |
| Type | Make | Model | Unit Price per Hour | Unit Price per Day** | Unit Price per Week** | District 11 | $9,500.00 |
| | | | | | District 12 | $10,500.00 |
| Standard reach Excavator w/ operator | Cat | 320 | $270.00 | $2,160.00 | $10,800.00 | | |
| long reach excavator (60' boom) w/ operator | Cat | 320 | $480.00 | $3,840.00 | $19,200.00 | | |
| Skid steer loader w/ operator | Cat | 289D | $140.00 | $1,120.00 | $5,600.00 | | |
| Tri Axle dump truck | | | $160.00 | $1,240.00 | $6,200.00 | | |
| Install sled | | | $75.00 | $600.00 | $3,000.00 | | |
| Concrete Pump Truck | KCP | | $395.00 | $3,160.00 | $15,800.00 | | |
| 6" water pump (used for pump arounds) | | | $75.00 | $600.00 | $3,000.00 | | |
| | | | PREVAILING WAGE RATE | |
| LABOR CLASSIFICATION (Operator, Laborer, Mason, etc.) | | | | | |
| Type | Unit Price per Hour | Unit Price per Day** | Unit Price per Week** | Unit Price per Hour | If it is determined that a project is subject to Prevailing Wage Rates, provide the Prevailing Wage Rate to be used for the Identified personnel. |
| OPERATOR | $20.00 | $100.00 | $450.00 | $25.00 | |
| Laborer | $80.00 | $640.00 | $3,200.00 | $90.00 | |
| On Site Tech/ Foreman | $135.00 | $1,080.00 | $5,400.00 | $145.00 | |
| Traffic Control, Flagging Operations | | | | PREVAILING WAGE RATE |
| Unit Price per Hour | Unit Price per Day** | Unit Price per Week** | |
| FLAGGER | $113.02 | $904.16 | $4,520.80 | $123.03 |
| | Lump Sum | | |
| Traffic Control for a lane closure of up to 500’ work zone | | $5,758.13 | | |
| Traffic Control for a lane closure of a 501 ' to 1000’ work zone | | $5,809.97 | | |
| Traffic Control for each additional 250' of work zone lane closure. | | $1,394.50 | | |
* FOR THE PURPOSE OF THIS CONTRACT, WORK ZONE IS CONSIDERED THE DISTANCE BETWEEN THE BEGINNNING AND ENDING LOCATION OF THE TO BE INSTALLED REVETMENT BAGS OR EROSION CONTROL MATS
** UNIT PRICE PER DAY BASED ON 8HR DAY, UNIT PRICE PER WEEK BASED ON 40HR WEEK.
&8Equipment Pricing - &P
WkEndWkNight Work
| 120-26 Revetment Bag & Erosion Control Mat 1 / 2 / 25 | | |
| Multiplier Adjustments | | |
| Vendor Name: | Guardian Retention Systems,LLC | |
| The following quoted multiplier will be used to adjust the total costs supplied herein for labor, equipment and material to cover additional costs associated with WEEKNIGHT work: | | |
| MULTIPLIER | 2x | |
| The following quoted multiplier will be used to adjust the total costs supplied herein for labor, equipment and material to cover additional costs associated with WEEKEND work: | | |
| MULTIPLIER | 2x | |
| Weeknight work is defined as any work performed between the hours of 7:00 pm to 6:00 am Monday through Thursday and 7:00 pm Friday through 12:00 midnight Friday. | | |
| Weekend work is defined as any work performed between the hours of 12:00 midnight Friday until 6:00 am Monday. | | |
| Example: | | |
| Total Costs Supplied | Multiplier | Total Costs to be Paid |
| $30.00 | X 1.15 | $34.50 |
Heading
102-17 PRICING 9/16/16