Attachment006d-RRS-Item10-SPECS.pdf
PDF 4 MB Posted
- Attached to
- 2019 Contracting West Road Maintenance BPA Federal contract opportunity
- Solicitation number
- 1204T019Q0023
About this file
This document includes specifications for road maintenance services for several National Forests in Oregon and California. The work includes grading, surfacing, hauling materials, installing drainage structures, and equipment rentals. The solicitation will be available on May 3rd, 2019 on FedBizOpps, with an estimated effective date of July 1st, 2019. The agency intends to award multiple firm fixed price blanket purchase agreements to provide adequate coverage for the geographical areas. Contractors may submit offers for individual districts and forests, and may perform work simultaneously across districts if receiving multiple awards. This is a total small business set-aside opportunity with the Department of Agriculture Forest Service Pacific Northwest Region.
Attachment 6 - Rogue River Siskiyou NF Technical Packet (4 of 4 documents)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1204T019Q0023-Amendment2.pdf | ||
| 1204T019Q0023-Amendment1.pdf | ||
| Attachment001-ExperienceQuestionaire.pdf | ||
| Attachment002-ServiceWageDetermination.pdf | ||
| Attachment005b-UMP-RoadRules.pdf | ||
| Attachment006a-RRS-Items8-10-SOW.pdf | ||
| Attachment004-WIL-Items2-4-SOW_SPECS.pdf | ||
| Attachment003-SIU-Item1-SOW_SPECS.pdf | ||
| Attachment006b-RRS-Item8-SPECS.pdf | ||
| 1204T019Q023-ReturnPacket.pdf | ||
| Attachment005a-UMP-Items5-7-SOW_SPECS.pdf | ||
| 1204T019Q023-Solicitation_GeneralInstructionsClausesProvisions.pdf | ||
| Attachment006c-RRS-Item9-SPECS.pdf | ||
| Attachment007-FW-Items11-13-SOW_SPECS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 6--GOVERNMENT STANDARDS/STATE STANDARDS/TECHNICAL EXHIBITS
001 Rogue River-Siskiyou National Forest Road Maintenance Specification List and Acceptable Quality Levels RRS-West
002 Vicinity Maps RRS-West
003 RRS-West Quarantine Maps 004 Special Equipment Cleaning Requirements Port Orford Cedar
SECTION 7--QUALITY/PERFORMANCE REQUIREMENTS SUMMARY
All work shall be in compliance with the attached Acceptable Quality Levels included with each section of the road maintenance specifications.
ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
Other Roads
A road surface is maintained to standard when the travel way is free of ruts and rills. The surfacing material has been thoroughly loosened to no less than 2-inches depth and crowned or cross-sloped as indicated by the character of the existing subgrade, without segregation of the surfacing materials. Suitable materials have been recovered and incorporated. Crowned or insloped road surfaces allow water to flow directly into ditches. Shoulders beyond the edges of the traveled way and turnouts have been shaped to allow drainage off and away from the road surface. Unsuitable materials have been removed from the traveled way and shoulders, placed outside the roadbed without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
811.03
LOCATION OF WORK:
As specified on roads listed on the road listing, shown on the plans, or as ordered by the Contracting Officer.
811.04
MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item in the SCHEDULE OF ITEMS completed and accepted.
811.05
PAYMENT:
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one hudredth (0.01) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-hundredth (0.01) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Furnishing water under Section 891 is incidental to the pay item.
SECTION 881 - MOBILIZATION/ EQUIPMENT MOVING
881.01
SERVICE REQUIRED:
A. Mobilization of personnel, equipment, and material to the project site.
8. Moving of equipment outside the established work schedule as ordered.
881.02
PERFORMANCE STANDARD:
A. Mobilization is complete when 100% of the personnel, equipment, and materials necessary to complete the work have been moved to the project site.
B. Moving is complete when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
881.03
LOCATION OF WORK:
As specified on roads listed on the ROAD LISTINGS, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
881.04
MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
881.05
PAYMENT:
A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location on the move, to the ordered work site.
A. The accepted quantities will be paid at the contract price per unit of measurement for Section 881 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item 881 (1) 881 (2) 881 (3)
881(4)
881(5)
Mobilization:<$10,000 BPA Call Amount Mobilization:$10,000-$25,000 Mobilization$25,000-$50,000 Mobilization:.$50,000 Equipment Moving
Pay Unit
LS
LS
LS
LS
Ml
Figure 2. Location of sites infested with Phytophthora ramorum in southwest Oregon that were discovered in 2017-2019.
Special Equipment Cleaning Requirements Port Orford-Cedar Root Disease Port Orford-cedar Root Disease Control - Contractor vehicles and equipment shall be washed by high-pressure washer to remove all loose or dried soil, or mud from surface and underside of vehicles before entering contract area to prevent the spread of Port Orford-cedar root disease.
Washing shall also be done any time Contractor equipment, or vehicles that have been operated outside the road travel way, are moved from an infected area, or if removed from the contract area and returned. The CO will inspect equipment prior to its transportation to the Forest. Work shall progress from uninfected sites to infected sites, as shown on the road listings or directed by the CO.
If water is drafted from sources possibly infested with phytophthora lateralis spores (Port Orford
- cedar root disease), then Clorox (TM) must be added:
Rate: 1 Liter of Ultra Clorox Bleach in 1000 Liters of water (52.5 ppm sodium hypochlorite).
Treatment Site: Treatment of water to occur only in truck tanks, tankers, trailers, fold-a-tank, water buckets, or other similar water carrying equipment. No treatment to occur in natural or man-made sources, such as streams, lakes, ponds, rivers, sumps or reservoirs. Treated water must be used in forested areas: Water should be used for fire fighting purposes, dust abatement, equipment cleaning and road work.
Restrictions: No direct application of treated water to streams or other bodies of water. Do not apply treated water in such a manner that allows run-off into bodies of waters such as creeks, streams, ponds, water-containing ditches, etc. Do not use as an irrigation source for plants. Do not use for drinking water.
It is a violation of Federal and State law to use this product inconsistent with it's labeling.Follow all directions, restrictions and precautions on the product label. The below label must be in possession of the user at the time of application.
Provide the Ultra Clorox Bleach Use Report to the CO within 15 days after each use period and at the close of the contract.
Restrict operations in affected areas to dry season. Waivers, at the discreation of the CO, may be issued in the event of extended dry weather.
Contractor shall clean all heavy equipment and vehicles prior to traveling or working in an Unifested area from an Infested area. Equipment and vehicles shall be cleaned and inspected at sites agreed to by the Forest Service. As much as practicable, work in uninfested areas first, then move to infested areas last.
Dispose of fill and debris from potentially infested sites in an approved area.
Roads in infected areas will be identified in the task orders.
Attachment : Rogue River-Siskiyou Package
| 10_Spec_maps |
| 10_Spec_maps |
| 10_Specifications |
| RRS ITEM 8-10_map_8.5x11 |
10-SOD_quarantine_map
10_POC Equipment Cleaning
File details come from the government source that posted it. Updated .