This solicitation notice seeks road maintenance services for multiple National Forests. The U.S. Department of Agriculture Forest Service R6-Pacific Northwest Region intends to award multiple blanket purchase agreements to provide grading, surfacing, load and haul materials, rolling dips, drainage cleaning, and equipment rental in accordance with drawings and specifications. Contractors may bid on items for individual Districts or Forests, and may be required to work simultaneously across districts if receiving multiple awards. The solicitation will be available on FedBizOpps on May 3rd, 2019 with an estimated effective date of July 1st, 2019. Prospective awardees must register in the System for Award Management to be eligible for award.
Attachment 5 - Umpqua NF Technical Packet (1 of 2 documents)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1204T019Q0023-Amendment2.pdf | ||
| 1204T019Q0023-Amendment1.pdf | ||
| Attachment001-ExperienceQuestionaire.pdf | ||
| Attachment002-ServiceWageDetermination.pdf | ||
| Attachment005b-UMP-RoadRules.pdf | ||
| Attachment006a-RRS-Items8-10-SOW.pdf | ||
| 1204T019Q023-Solicitation_GeneralInstructionsClausesProvisions.pdf | ||
| Attachment004-WIL-Items2-4-SOW_SPECS.pdf | ||
| Attachment006d-RRS-Item10-SPECS.pdf | ||
| Attachment003-SIU-Item1-SOW_SPECS.pdf | ||
| Attachment006b-RRS-Item8-SPECS.pdf | ||
| 1204T019Q023-ReturnPacket.pdf | ||
| Attachment006c-RRS-Item9-SPECS.pdf | ||
| Attachment007-FW-Items11-13-SOW_SPECS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2019 Road Maintenance BPA Solicitation #: 1204T019Q0023 Umpqua NF: ITEMS 5 – 7
UMPQUA DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION 1—GENERAL
1.1 Scope of Work
The intent of this BPA is for multiple awarded Contractors to provide routine and recurring maintenance of forest roads and administrative use roads of the Umpqua National Forest as follows:
Item 5: Cottage Grove Ranger District Item 6: Diamond Lake and North Umpqua Ranger Districts Item 7: Tiller Ranger District
This work includes furnishing labor, equipment, supervision, transportation, operating supplies, and all incidentals necessary to provide maintenance in accordance with drawings and specifications of the BPA.
Contractor may be required to perform work items simultaneously on all districts if awarded more than one item. In addition, the contractor may be required to respond to emergency storm events which may consist of removing trees, debris, slides and slough from drainage structures and/or traveled way to provide access to the forest.
Danger Tree felling is NOT required. If contractor locates a tree that is considered a danger to current maintenance activities, it shall be reported to the COR or Inspector immediately. After the tree is felled, cleanup of the resulting slash may be required and will be ordered on a separate procurement.
Maintenance work consists of a variety of road repair activities including but not limited to the following:
Blading Watering Compaction Ditch maintenance Drainage structure maintenance Roadway drainage maintenance Drain dip maintenance Removal and disposal of materials Roadside brushing Logging out Rock / Earth Barrier and Gate Maintenance Sign maintenance
1.2 Location and Description
North Umpqua Ranger Station is located in Glide, Oregon, 17 miles east of Roseburg, OR.
District Office to Wolf Creek Storage Yard approx. 12.25 miles up the 17 road (Little River).
District to Steamboat Storage Yard, 23 miles west.
Cottage Grove Ranger Station is located in Dorena, OR, 5 miles east of I-5, travel approximately 16 miles from District Office to Rujada Work Center off of Layng Creek Road.
Tiller Ranger Station is located in Tiller, Oregon, 23 miles east of Canyonville, OR
Toketee Ranger Station (Diamond Lake Ranger District) is located 60 miles east of Roseburg, Oregon, off Oregon Hwy 138
The location of the worksites, access to the areas, methods of work, size of each sub item, and other information pertinent to this BPA are contained in the Vicinity and Project Maps, which shall be considered as part of the technical specifications.
A Vicinity Map is attached to this BPA. Specific Project Location Maps shall be issued with each Purchase Order as necessary.
The attached road lists for each district are only a portion of all the roads on the forest;
specific roads requiring work will be listed on each BPA Call.
The Typical Drawings included with the specifications are representative of work required.
1.3 Accessibility
1.3.1 Work areas may be reached by Forest roads that are accessible by a standard two-wheel drive pickup equipped with snow tires and chains, if needed, during normal operating seasons, unless otherwise indicated on Project Maps. Vehicles shall not operate off system roads without prior written approval of the Contracting Officer.
1.3.2 Inaccessibility due to snow, fallen trees, slides or washouts on roads may or may not be corrected at the option of the Government. If road access is blocked, the Government may: (1) provide an alternate access route; (2) delete the inaccessible sub items (s) or; (3) substitute similar sub item(s).
1.3.3 Roads shown on unit maps indicate access to units and are not to suggest the roads are open within units or for any further travel.
1.3.4 Use of motorized equipment other than hand held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as hereinafter provided.
1.3.5 No vehicle shall by-pass any officially blocked road (barriers, locked gates, posted signs, rock/log/dirt, etc.) without approval of the Contracting Officer.
SECTION 2--DEFINITIONS
Refer to attached specification 800-F1.
SECTION 3--GOVERNMENT FURNISHED PROPERTY, MATERIALS, SERVICES
The Government may provide the following item(s) of Government property to the Contractor for use in the performance of this BPA. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the BPA.
SECTION 4--CONTRACTOR FURNISHED CRITICAL ITEMS/SERVICES
Equipment as required to complete the work according to the attached specifications.
SECTION 5--PERFORMANCE WORK STATEMENT TASKS AND CRITICAL
SUBTASKS
All work will be performed in accordance with the attached specifications and the following special requirements for this forest.
Special Requirements For Water Drafting Equipment
Water drafting equipment may be used only at water sources designated on the Vicinity Map, BPA Call, or provided by the Contracting Officer. Such equipment shall include a screen around the intake (foot valve) with openings no larger than 3/32 - inch. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.
Equipment Cleaning Requirements
All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.
Equipment shall be made available for visual inspection by the Forest Service prior to entering National Forest lands. The Contractor shall advise of a proposed date for mobilization.
Inspections will take place at mutually agreeable enroute locations in advance of entry onto National Forest lands.
The Contractor shall take special care under this BPA to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.
SPECIFIC NOTES & INCIDENTAL WORK APPLICABLE FOR DURATION OF BPA
Manage all work areas in accordance with other clauses and specifications in this BPA including documents incorporated by reference.
Primary, Secondary and Other Roads: Some pay items under Sections 811 and 851 refer to these different road categories. Generally, the road category may be determined from the Umpqua National Forest map, East Half - Land of Umpqua, Pacific Northwest Recreation Map Series, 2007. Roads symbolized (refer to East Half map legend) as either “Paved Road” or “Gravel Road” are Primary Roads. Roads symbolized as “Unmaintained Road” are Secondary Roads. Other Roads are not displayed on the Land of Umpqua map, but may be found on individual Ranger District maps. However, the specific applicable pay item for each road in the Road Listing will be established by the Contracting Officer at the time the work is ordered.
807 Equipment Rental
Equipment rental will be utilized for road maintenance activities as ordered when not otherwise specified or paid for under other pay items. Equipment rental work may include coordination of activities with other contractors or Forest Service force account operations.
For example, providing a grader and/or roller with operator(s) to process and compact crushed aggregate hauled and placed on a road segment by others may be ordered and specified under Section 807. In contrast, grader and roller work is paid under Surface Maintenance and Roller Compaction pay items when ordered and specified under Section 811.
Mobilization of equipment rental ordered under Section 807 is incidental to the equipment rental. However, payment will be made at the rental operating rate for reasonable travel time required for the equipment to be delivered to the site (one-way), but not to include payment for delivery distances exceeding 100 miles.
811 Surface Maintenance
Roller compaction will be required on bladed Primary or Secondary Roads when ordered as a separate pay item.
Watering of roads in conjunction with blading of Primary or Secondary Roads will be required when ordered as a separate pay item under Section 891. When water is used, it will be applied to loose, already bladed or scarified materials to enhance compaction, unless otherwise agreed.
Turnouts are typically located and spaced closed enough apart to be intervisible on single lane Primary Roads, and spacing averages between 400 feet and 800 feet apart. Turnout spacing on double lane Primary roads will average between 1000 feet and 1500 feet apart.
Turnout spacing on Secondary and Other Roads will average between 500 feet and 1000 feet apart.
Some turnouts may not have been routinely bladed in past cycles of road blading, and therefore require more shaping, smoothing, and removal of unsuitable materials than the adjacent traveled way.
Turnouts will be shaped and maintained to the full dimensions shown on the Plans wherever practicable.
832 Load, Haul & Place material
This work may be ordered as an individual item, such as may be required to move stockpiled materials to other locations, or may be ordered in conjunction with other required work (e.g. hauling and disposing of unsuitable material generated from work under Sections 811 and 834, or hauling of materials required for installing / maintaining rock/earth barriers under Section 861.)
834 Roadway Drainage System Maintenance
Ditch cleaning may be ordered for segments of road that are shorter in length than other ordered work on the same road. For example, a one-mile long road segment may have surface maintenance and cutting of roadway vegetation on the entire length, but have only one or more shorter segments of ditch cleaning.
Cleaning and reconditioning of culverts may be ordered for individually identified culverts paid by Each.
Cleaning and reconditioning of culverts and ditch cleaning may be ordered as a combined pay item, paid by the Mile, and requiring all culverts and ditches along the road segment to meet the performance requirements of Section 834.
842 Roadway Vegetation Maintenance
Pay items for cutting roadway vegetation will be ordered for roads categorized as having either high volumes or low volumes of vegetation requiring treatment. The specific applicable pay item for each road in the Road Listing will be established by the Contracting Officer at the time the work is ordered.
o Typically, high volume vegetation roads have not been treated for more than seven years, have severely restricted sight distance due to vegetation encroachment, may have vegetation encroachment that contacts the sides of standard-sized highway vehicles, and may have small trees growing from within the traveled way.
o Typically, low volume vegetation roads have been treated within the last seven years, have only moderately or slightly restricted sight distance, or do not have any of the other typical conditions described for high volume vegetation roads for more than ten-percent of the road segment.
861 Maintenance of Rock/Earth Barrier
Sign work related to the barrier will be required when separately ordered and paid for under Section 872.
Earth and rock material for barriers will come from excavation at the site as shown on the drawings or from nearby ditch maintenance or other ordered work if approved in advance, and is incidental work. Additional material may be required, ordered and paid under Section 832.
872 Sign Installation and Maintenance
Minor vegetation clearing to ensure visibility of the sign or marker is considered incidental to the sign work itself, and shall be treated in accordance with Section 842, without a requirement for slash reduction.
881 Mobilization and Equipment Moving
Mobilization will be paid once per area per calendar year. Areas are: Cottage Grove R.D., Diamond Lake R.D./North Umpqua R.D. and Tiller R.D.
Work and operating schedules will be established for all ordered work prior to commencing work. Equipment moving may be paid under Section 881 when additional, unanticipated work is ordered that interrupts the original scheduled work and results in additional, unanticipated equipment moving to another Ranger District or within the same Ranger District.
891 Water Supply, Watering, and Water Drafting Equipment
Payment under Section 891 is based on the volume of water supplied, hauled, and applied, regardless of the distance hauled. Water sources will be designated at the time work is ordered. One-way (loaded) haul distances may range from less than one mile to fifteen miles. Typically, one-way haul distances will average between five and ten miles for most ordered work.
Water drafting equipment may be used only at water sources designated on the Vicinity
Map, BPA Call, or provided by the Contracting Officer. Such equipment shall include a screen around the intake (foot valve) with openings no larger than 3/32 - inch. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.
SECTION 6--GOVERNMENT STANDARDS/STATE STANDARDS/TECHNICAL
EXHIBITS
001 Umpqua National Forest Road Maintenance Specifications, Acceptable Quality
Levels and Drawings 002 Umpqua National Forest Vicinity Map 003 Umpqua National Forest Road Rules
SECTION 7--QUALITY/PERFORMANCE REQUIREMENTS SUMMARY
All work shall be in compliance with the attached Acceptable Quality Levels included with each section of the road maintenance specifications.
Specification List – Road Maintenance Services for Umpqua National Forest
SPECIFICATION
NUMBER DESCRIPTION
801 QUANTITY MEASUREMENT TERMS
803 SNOW REMOVAL
807 EQUIPMENT RENTAL
808 WORK AREA MANAGEMENT
811 SURFACE MAINTENANCE
832 LOAD, HAUL, AND PLACE MATERIALS
833 DRAINAGE STRUCTURE INSTALLATION OR REPLACEMENT
834 ROADWAY DRAINAGE SYSTEM MAINTENANCE
841 EROSION CONTROL AND REVEGETATION
842 CUTTING ROADWAY VEGETATION
851 HAZARD AND OBSTRUCTION REMOVAL
861 MAINTENANCE OF CATTLEGUARD, TRAFFIC GATES AND BARRIERS
872 SIGN MAINTENANCE
881 MOBILIZATION / EQUIPMENT MOVING AND CLEANING
891 WATER SUPPLY AND WATERING
SECTION 803 – SNOW REMOVAL
803.01 Service Required
Remove snow from designated surfaces.
803.02 Performance Standard
A. Snow removal is complete when the surface is available and useable for all intended use, safe for the intended users, and will efficiently drain.
B. Perform work in a manner to preserve and protect roads and appurtenances structures, and to prevent erosion damage to roads, streams, and other Forest values.
C. Do not undercut banks or blade gravel or other surfacing material off the road.
D. Keep roadbed drainage ditches, drain dips, and culverts functional when needed during operations and upon completion of operations. Do not plow snow into ditches and culvert inlets, nor pack the existing snow down in those locations.
E. Control snow removal to identify the usable traveled way having roadbed support. Reshape over-width plowing as necessary to define the usable width.
F. Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills. Maximum distance between holes will not exceed 250 linear feet.
G. Remove snow from all of the traveled way, including turnouts, for safe and efficient road use, to reduce water to road interactions, and to protect the road.
Remove intruding windfalls, debris, or slough and slide material for the full width of the traveled way and deposit out of drainage’s at agreed upon locations.
H. Keep berm buildup at the roadsides less than 3 feet to ensure adequate clearance and distribution of snow discharge from the blower exit port.
I. Use of a tractor mounted rotary snow blower may be acceptable upon approval otherwise only approved snow plows, with adjustable depth skids, designed for snow removal, shall be acceptable
J. Construct lead off ditches as required to remove any water standing on the road surface or running down the road surface.
K. Ensure that the plow or snow blower “floats” a minimum of 4” above the road surface. Equip with two height adjustable 12” X 12” skid feet to ensure incidental contact with the road surface leaves a minimum of 4 inches of snow and does not damage road surface.
803.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
803.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Snow removal will be measured along the centerline of the roadway. Turnouts are considered incidental. Measurement will be to the nearest one-tenth (0.1) mile.
803.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 803 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
803(1) Snow Removal (Single Lane) Mile
803.06 Acceptable Quality Levels
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Surface Damage
A loss of more than 10
CY/mile on agg. surface roads or any damage on paved surfaces.
A loss of less than 10
CY/mile on agg. surface roads or any damage on paved surfaces.
X per unit
Replace or recover lost material or repair damaged surface
Accept the loss of material or repair damaged surface
Drainage:
Impeded flow for ditches, inlet/outlet channels, and catch basins
Water will be diverted out of the drainage structure or system
< 20% impeded, but water will stay in the channel.
X per unit
Rework Rework if greater than X minor defects *
Remaining Snow depth
Exceed maximum depth by X inches for X feet of road and not to exceed X per mile
Exceed maximum depth by X inches for X feet of road and not to exceed X per mile
X per unit
Rework Repair if greater than X minor defects *
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
X per unit
Repair and Stabilize Revegetate if greater than X minor defects *
Overwidth Plowing
Undefined edge of traveled way N/A 0 N/A
Reshape as necessary
N/A
Underwidth Plowing
Too narrow for intended use
N/A 0 N/A Widen as necessary N/A
Damage to Structures and Appurtenances
Any Damage Any Damage 0 0 Repair or Replace Repair or Replace
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance
Suspend work until in compliance
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
807 EQUIPMENT RENTAL
807.01 Service Required
Furnishing and operating equipment.
807.02 Performance Standard
The equipment shall be furnished as specified in the table below:
Max Age
Min
HP
Min Reach
Min Weight Capacity Attachments Remarks
Excavator Years
160 30’ 55000 1.5 CY
In addition to common excavation, must be equipped to grasp and lift logs up to 36-inches diameter and boulders up to 30-inch diameter
Backhoe years
70 15’ 15000
1.25CY
bucket
72” front, 24” back bucket
Extend-a-hoe acceptable
Grader years
140 - 30000 12’ wide 24” blade
Dump Truck years
- - - 10 CY
Brush Cutter years
- 14’ Rotary capable Wheeled only
Roller years
- 24700 - Vibratory, pneumatic
Dozer years
75 20000 10’ wide Winch
“Make equipment available for inspection and approval before use”
807.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, included in the SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.
807.04 Acceptable Quality Levels
A. Equipment shall be clean and free of soil, plant parts, seeds, and other debris.
B. Equipment shall be well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.
C. Equipment shall be operated by a fully trained, qualified, and competent operator at all times.
807.05 Measurement
A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
C. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
D. Moving of equipment will be paid at the established hourly rate.
807.06 Payment
A: The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule if items. Payment will be full compensation for the work prescribed in this Section.
PAY ITEM PAY UNIT
807(1) Excavator Hour 807(2) Backhoe Hour 807(3) Grader Hour 807(4) Dump Truck Hour 807(5) Brush Cutter Hour 807(6) Roller Hour 807(7) Dozer Hour
SECTION 808 – FLAGGER OPERATION
808.01
SERVICE REQUIRED:
Contractor requirements for traffic control and equipment requirements in work areas.
808.02
PERFORMANCE STANDARDS:
A. Traffic Conditions - Unless otherwise provided in the SPECIAL PROJECT SPECIFICATIONS, roads are open to traffic with not more than fifteen (15) minutes maximum delay time.
B. A plan for satisfactory handling of traffic, approved by the Government, is required prior to initiating or performing work which interferes with use of traveled roadways.
C. Traffic Control Devices
i. Provide signs and other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD). Provide traffic control for occupied work areas that is in accordance with these specifications. All signs and devices remain the property of the Contractor.
ii. Keep traffic devices current with maintenance operation and remove upon completion.
iii. Use warning signs to control traffic approaching the work area from either direction and also from side accesses having standard Government rectangular or trapezoidal-shaped route markers with horizontal numbering.
iv. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.
v. Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.
vi. Advisory speed plates may be used to control traffic through the work area.
D. Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
E. Contractor's Equipment
i. Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating.
Backup horns are required on all self- propelled equipment in excess of 5 tons gross weight.
ii. Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.
808.03
LOCATION OF WORK:
Location of work is as specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
808.04
MEASUREMENT:
A. Work Area Management (Flaggers not included):
i. No separate measurement or payment will be made for meeting requirements of this Section. All work and materials are incidental to other paid work in this contract.
B. Flaggers:
i. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the flaggers are in operation.
ii. A single flagger shall be considered one laborer and all incidentals required for a single flagger operation. Dual flaggers shall be considered two laborers and all incidentals required for a dual flagger operation.
iii. Flagger support vehicles and flagging equipment shall be considered incidental to the established hourly rate.
iv. Hours of operation shall be the same as for the Service Provider’s regular
v. Work shift, unless otherwise directed in writing by the Contracting Officer.
vi. Moving of flagging operating stations during work operations shall be paid at the established hourly rate.
808.05
PAYMENT:
The accepted quantities will be paid at the contract price per unit of measurement for the Section 808 pay items listed in the schedule of items. Payment will be full compensation the flagging work
PAY ITEM PAY UNIT
808(1) Single Flagger Operation Hour
808(2) Dual Flagger Operation Hour
SECTION 811 – SURFACE MAINTENANCE
811.01
SERVICE REQUIRED:
Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts and intersections. Surface maintenance includes reshaping the crown or slope of traveled way, berms, and drainage dips. Scarification, compaction, or both may be required when shown on the ROAD LISTING.
811.02
PERFORMANCE STANDARD:
Roads
A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surfacing material has been thoroughly loosened to no less than 2-inches depth or the depth of potholes or corrugations. The surface is smooth, and compact, without segregation of the surfacing materials. The surface is crowned or cross-sloped as indicated by the character of the existing subgrade, to at least ½-inch per foot of width, but not more than 1-inch per foot of width. Suitable materials have been recovered and incorporated.
Crowned or insloped road surfaces allow water to flow directly into ditches. Shoulders beyond the edges of the traveled way and turnouts have been shaped to allow drainage off and away from the road surface. Unsuitable materials have been removed from the traveled way and shoulders, placed outside the roadbed without concentrations and without obstructing drainage ways or structures. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
When specified in the ROAD LISTING, aggregate surfacing has been scarified to a depth of 4-inches to 6-inches prior to final shaping as described above.
When specified in the ROAD LISTING, water has been hauled and incorporated into the surfacing material to reduce segregation and/or to improve required compaction.
When specified in the ROAD LISTING, aggregate surfacing has been roller compacted following final shaping so that no visual displacement occurs from hauling or spreading equipment.
Shoulders along paved roads are maintained to standard when unsuitable material (soil, moss, gravel, and other debris) has been removed from paved surfaces within 3-feet of pavement edges on both sides of the road. Unpaved shoulders adjacent to paved surfaces have been maintained and shaped to provide a smooth transition from the paved surface and to allow drainage off and away from the road surface or into ditches. Shoulders without ditches are shaped for a minimum of 2-feet, up to 6-feet, from the pavement edge as necessary for drainage. Unsuitable materials have been removed from the shoulders. All unsuitable materials removed from paved surfaces and shoulders have been placed outside the roadbed without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
lmspencer Highlight
811.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, OR as ordered by the Contracting Officer.
811.04
MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-hundredth (0.01) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-hundredth (0.01) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
811.05
PAYMENT:
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section, except payment for hauling and placing of materials will be paid under Section 832 and hauling and spreading of water will be paid under Section 891.
Pay Unit
Pay Item
811(1) Surface Maintenance: Single Lane Roads Mile Scarification not Required
811(2) Surface Maintenance: Single Lane Roads Mile Scarification Required
811(3) Surface Maintenance: Double Lane Roads, Mile Scarification not Required
811(4) Surface Maintenance: Double Lane Roads Mile Scarification Required
811(5) Roller Compaction: Single Lake Roads Mile 811(6) Roller Compaction: Double Lake Roads Mile 811(7) Shoulder Maintenance: Paved Roads Mile lmspencer Highlight
811.06 ACCEPTABLE QUALITY LEVELS:
Description Major Defect Minor Defect Allowable
Defects Required Action
Major Minor Major Minor
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10%
Gradation of surface aggregate is degraded by less than 10%
0 per pay unit
1per pay unit
Rework Rework if greater than 2 minor defects
A loss of more than 10 CY/mile
A loss of more than 10 CY/mile
0 per pay unit
0 per pay unit
Replace or recover lost material
Accept the loss of material
Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised
Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised
0 per pay unit
2 per pay unit
Rework Accept the loss of surface quality
Roller Compaction
Visible displacement occurs under hauling or spreading equipment
N/A 0 per pay unit
N/A Rework N/A
Ditches and Road Drainage Structures
Impeded flow or water diverted out of drainage structure
<20% impeded, but water will stay in channel
0 per pay unit
1 per pay unit
Rework Rework if greater than 1 minor defect
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 per pay unit
1 per pay unit
Repair and Stabilize
Revegetate if greater than 1 minor defect
Shoulder Maintenance (Paved Roads)
Elevation difference between pavement and shoulder is greater than 1-inch
N/A 0 per pay unit
N/A Rework N/A
Material greater than ¼-inch diameter remaining on the road surface
N/A 0 per pay unit
N/A Rework N/A
Surface Irregularities
Potholes greater than 1-inch deep and wider than 1-foot
N/A 0 per pay unit
N/A Rework N/A
Washboards greater than 1-inch deep and greater than 20 feet in length along road
N/A 0 per unit
N/A Rework N/A
Description Major Defect Minor Defect Allowable Defects Required Action
Major Minor Major Minor
Road Cross Section
Crown or cross slope is not within specified range on more than 5 percent of road per pay unit or does not drain properly
N/A 0 per pay unit
N/A Rework to achieve less than 10 percent length out of range.
Rework for 100 percent drainage
N/A
N/A
N/A lmspencer Highlight
SPECIAL PROJECT SPECIFICATION (01/15)
814-F1 ASPHALT SURFACE MAINTENANCE
814.01
Repair and cleaning of pavement surfaces.
814.02
A. This work is complete when the pavement is clean and free of potholes and surface irregularities.
B. Furnish Hot Asphalt Pavement Mix, ODOT Spec. 3/8” Dense Gradation, Level II HMAC, Asphalt Grade PG 64-22, as approved by the CO.
C. Remove material to a minimum depth of 4 inches, or as necessary to reach firm support. If firm support for a patch is unavailable, notify the CO prior to placing any material.
D. Saw cut edges of the prepared hole to form a vertical face in un-fractured asphalt surfacing. Make the prepared hole rectangular, and clean it of all loose material. When the hole is dry, apply emulsified asphalt to the bottom and faces of the hole. Barricade prepared sites. Patch the sites immediately after the emulsified asphalt breaks.
E. Place the asphalt concrete mixture in layers not exceeding 4 inches. Thoroughly compact each layer with mechanical tampers or rollers. For hot asphalt concrete mixtures, compact the mix while it is above 230 °F.
F. Compact the finished surface with an approved steel-wheel roller, as approved by the CO. Ensure that the compacted patch is approximately 1/8 to 1/4 inches above the level of the adjacent pavement.
G. Clean the existing surface of all loose material, dirt, or other deleterious substances by approved methods. Apply emulsified asphalt tack coat on a dry, unfrozen surface when the air temperature in the shade is above 35 ºF and rising.
H. Where using slow-setting emulsified asphalt, dilute by adding an equal amount of water to the emulsified asphalt. Apply the asphalt at a rate of 0.03 to 0.15 gallons per square yard. Apply the tack coat uniformly and completely by fogging with a hand spray attachment or by another approved method. If excess asphalt material is applied, squeegee the excess from the surface.
Allow the tacked surfaces to completely cure before placing the covering course. Place the covering course within 4 hours of placing the tack coat.
814-F1 ASPHALT SURFACE MAINTENANCE (01/15/15) 1
I. Seal the edges of the completed patch with emulsified asphalt, and blot with fine sand. The CO will approve the exact application rate, temperature, and area to be treated before application and may make adjustments for variations in field conditions.
J. Disposal of asphalt concrete materials removed from pothole patching operations shall be removed from National Forest lands and disposed of in a legal manner. Disposal of asphalt concrete is considered to be incidental to Pothole Patching.
814.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
814.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Ton: Material measured by the ton shall be verified by certified weight tickets.
Tonnage remaining in the haul vehicle, disposed of at an approved waste area, material that does not meet applicable specs, or material that is not placed shall have its quantity measured and shall not be included in final completed and accepted quantities for payment.
814.05
The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items.
Payment will be full compensation for the work prescribed in this Section.
814(1) Pothole Patching, Ton Per Task Order 814(2) Skin Patching, Ton Per Task Order
814-F1 ASPHALT SURFACE MAINTENANCE (01/15/15) 2
814.06 Acceptable Quality Levels
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Pothole Patching
Finished elevation does not match adjoining segments by less than 1/4 inch
N/A 0 N/A Rework N/A
Patched material does not properly adhere to adjacent surfaces
N/A 0 N/A Rework N/A
Area to be patched is not properly prepared
N/A 0 N/A Rework N/A
Skin Patching
Finished elevation does not match adjoining segments by less than 1/4 inch
N/A 0 N/A Rework N/A
Patched material does not properly adhere to adjacent surfaces
N/A 0 N/A Rework N/A
Area to be patched is not properly prepared
N/A 0 N/A Rework N/A
Surface Cleaning More than 5% of surface is not cleaned as specified
Less than 5% of surface is not cleaned as specified
0 1 per unit Rework Accept but may reduce payment.
Asphalt Quality Product and gradation does not meet Specifications and is not suitable for job.
Product and gradation does not meet Specifications but is otherwise suitable for job.
0 1 per unit Reject and replace
Accept but may reduce payment.
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance
Suspend work until in compliance
814-F1 ASPHALT SURFACE MAINTENANCE (01/15/15) 3
SECTION 832 – LOAD, HAUL, AND PLACE MATERIALS
832.01
Load, haul, and place material at designated sites.
832.02
PERFORMANCE STANDARD:
Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and re-vegetation as ordered by the Contracting Officer. Other unsuitable material, aggregate stockpiles, or slash designated for hauling has been loaded and placed in designated locations.
832.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as directed by the Contracting Officer.
832.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
CY - Mile: The pay unit of CY-Mile is the cubic yards of material hauled multiplied by the one-way (loaded) distance to the designated placement or disposal location, measured to the nearest 0.1 mile. Volume measurement will be based on the nominal struck level load (water level) of the hauling vehicle. Vehicles shall be loaded as full and densely as safely practicable.
832.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 832 pay item listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
832(1) Load, Haul, and Place Material CY-Mile
832.06 ACCEPTABLE QUALITY LEVELS:
Major Defect Minor Defect Allowable Defects
Required Action
Major Minor Major Minor
Slopes
Unstable material left on slopes
Material left on slopes that can be stabilized and won’t block drainages
0 per pay unit
Remove Remove or stabilize in place
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope unit
Repair and Stabilize
Revegetate if greater than 2 minor defects
Ditches, inlet/outlet channels, streams and catch basins
Water will be diverted out of the drainage structure or soil enters system
<20% impeded, but water will stay in the channel
0 1 per unit
Rework
Rework if greater than 3
Debris on Road (Primary and Secondary Roads)
Debris in traveled way that may slow or impede low clearance vehicles
Debris in traveled way that does not slow or impede low clearance vehicles
0 1 per pay unit
Rework Rework if greater than 1 minor defect
Debris on Road (Other Roads)
Objects in traveled way that impedes or obstructs high clearance vehicles
N/A 0 N/A Rework N/A
Placed material (Disposal Sites)
Unstable material on designated sites
N/A N/A Stabilize N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance
Suspend work
SECTION 833 – DRAINAGE STRUCTURE INSTALLATION OR REPLACEMENT
833.01
Install or remove drainage structures including culverts, water-bars, & cross ditches.
833.02
Drainage structure installation or replacement is complete when designated water-bars or cross ditches have been installed to the lines and grades specified.
833.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by
833.04
A. Linear Foot: Work activities by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot.
833.05 PAYMENT:
Section 833 pay item listed in the schedule of items. Payment will be full compensation
Pay Item Description Pay Unit
833(4) Construct Waterbar Each 833(5) Construct Cross Ditch Each
833.06 -ACCEPTABLE QUALITY LEVELS:
Defects Required Action
Major Minor Major Minor
Water-bars and cross ditches
More than 10% deviation from original lines and grades
10% or less deviation from original lines and grades
0 per unit
2 per unit
Rework Rework if greater than 2 minor defects
Sedimentation
Operations cause or allow sediment to leave site.
N/A 0 per unit
N/A Cease operations until sediment is controlled
N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance
Suspend work until in compliance
SECTION 834 – ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01
Clean and recondition roadway drainage systems including culverts, ditches, inlets and outlet channels, catch basins and appurtenances.
834.02
Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.
Materials produced from drainage system maintenance have been placed outside the roadway without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, materials have been hauled and placed in designated disposal areas.
834.03
A. As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the contracting Officer and;
1. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area SHOWN ON THE PLANS or in the
SUPPLEMENTAL SPECIFICATIONS.
2. Culverts – a minimum external horizontal distance of 10 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.
3. Ditches adjacent to the roadbed.
4. This work does not include bridges, cattle guards, drain dips, or water-bars.
834.04
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes or number of culverts.
834.05
Section 834 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section, except payment for hauling and placing of materials will be paid under Section 832.
Pay Item Description Pay Unit
834(1) Clean and Recondition Culverts: 24-Inch Diameter and Each Under 834(2) Clean and Recondition Culverts: Over 24-Inch Diameter Each through 48-Inch Diameter 834(3) Clean and Recondition Culverts: Over 48-Inch Diameter Each 834(4) Clean Ditches Mile 834(5) Clean Ditches and Drainage Structures Mile 834(6) General Road Maintenance Per Task Order
834.06 ACCEPTABLE QUALITY LEVELS:
Defects Required Action
Major Minor Major Minor
Blocked Culverts Greater than 20% of end area blocked
20% or less of end area blocked
0 2 per pay unit
Rework Rework if greater than 2 minor defects
Damaged Culvert inlet/outlets
Greater than 20% of end area blocked
20% or less of end area blocked
2 per greater than 2 minor defects
Impeded flow for ditches, inlet/outlet channels, catch basins.
Water will be diverted out of the drainage structure or system
<20% impeded, but water will stay in the channel
0 5 per greater than 5
Debris on Road produced by Service Provider operations
Any debris in traveled way
N/A 0 2 per pay unit
Rework N/A
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10%
Gradation of surface aggregate is degraded by 10% or less
0 1 per pay unit
Rework Rework if greater than 1
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 per unit
2 per pay unit
Repair and Stabilize
Revegetate if greater than 2 minor defects
Vegetation Woody vegetation within 5 feet of the inlet end of drainage structures or in ditches that interferes with flow
Low growing vegetation within 5 feet or more of inlet of drainage structures or in ditches that does not interfere with flow
0 N/A Remove Leave in place
Work Area Management
Not following approved Safety plan including signs, flaggers, and other temporary traffic control measures
Location or quality of signs, flaggers, or other temporary traffic control measures do not meet
MUTCD
0 0 Suspend work until in compliance
Replace or correct by next work shift
SECTION 841 – EROSION CONTROL AND REVEGETATION
841.01
Utilize erosion control practices and materials to prevent sediment delivery to streams, lakes, wetlands, to prevent invasive vegetation, and establish native species.
841.02
Seed, mulch, or both are evenly distributed on areas designated for treatment. Seed has been applied within +/- fifteen percent of the rate prescribed by the Contracting Officer for the site and species. Apply straw mulch at a rate of 3000 pounds to 4000 pounds per acre (0.62 pounds per square yard to 0.83 pounds per square yard). Where both seed and mulch have been applied, the seed has been separately distributed prior to mulch application. Mulch has been applied without delay following seeding to protect the seed.
Straw bale ditchline filters have been installed in stable configurations at locations MARKED ON
THE GROUND.
841.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as directed by
841.04
Sq. Yard: The pay unit of Sq. Yard is the surface area designated for placement of materials, based on slope measurements.
841.05
Section 841 pay item listed in the schedule of items. Payment will be full compensation
841(1) Mulching, Straw, Government Furnished Sq. Yard 841(2) Seeding, Grass, Government Furnished Sq. Yard 841(3) Straw Bale Ditch line Filters, Government Furnished Each
841.06 ACCEPTABLE QUALITY LEVELS:
Major Defect Minor Defect Allowable Defects
Required Action
Major Minor Major Minor
Seed application Less than 25% of rate specified
Less than 5% of rate specified
0 1 Apply additional seed
Apply additional seed
Mulch application
25% less than rate specified
N/A 0 N/A Apply additional mulch
N/A
Straw Ditchline Filters
Bales not stable N/A 0 N/A Re-install bales
N/A
SECTION 842 – ROADWAY VEGETATION MAINTENANCE
842.01
SERVICE REQUIRED:
Cutting all vegetative growth, including trees and other vegetation less than 5 inches in diameter measured 6 inches above the ground, on roadway surfaces and roadsides.
842.02
PERFORMANCE STANDARD:
A. General
1. Brush, trees and other vegetation are cut within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. All limbs which extend into the treated area, or over the roadbed, to a height of 14 feet above the traveled way surface elevation have been removed.
2. Items to remain will be DESIGNATED ON THE GROUND.
3. Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
4. Trees within the cutting limits, but outside the roadbed and ditch, which are over 5 inches measured at 6 inches above the ground have been limbed in lieu of cutting.
5. Limbed trees have limbs cut within 4 inches of the trunk.
6. There is minimal or no damage to trunks of remaining trees.
B. Cutting Side Vegetation
1. The treated area includes the road bed measured from the center line to each defined road edge, or to the bottom of the ditch on ditched road segments, plus an additional 4 feet on each side. Where there is no defined road edge or ditch, the treated area extends 12 feet from each side of the road center line.
2. Transitions between differing increments of cutting width have tapered lengths of not less than 50 feet and not more than 70 feet.
C. Debris
1. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter do not remain on roadway slopes within the treated area, in ditches, or within water courses.
2. Limbs and chunks in excess of 3 inches in any dimension do not remain on the traveled way or shoulders.
3. For road segments where slash reduction is identified in the ROAD LISTING as not required, materials are scattered beyond the roadbed, outside of the work area and drainages.
4. For road segments where slash reduction is identified in the ROAD LISTING as required, all materials are reduced in size to less than 12 inches in length and 3 inches in diameter by use of a masticator, mechanical chipper, or similar means. Resultant material is placed on cut slopes or outside of the work area but not in ditches or drainages. There are no accumulations of chips on steep cut slopes where the material will ravel into ditches.
842.03
As…