This document outlines the requirements for a 2019 road maintenance blanket purchase agreement to be awarded by the USDA Forest Service Pacific Northwest Region. The BPA will procure road maintenance services for the Siuslaw, Willamette, Umpqua, Rogue River-Siskiyou and Fremont-Winema National Forests, including grading, spot surfacing, load haul and place materials, rolling dips, cleaning drainage systems, and hourly equipment rental. The Forest Service intends to award multiple firm fixed price BPAs to provide adequate coverage for the geographical areas, and contractors may submit offers for any or all item numbers covering individual districts and forests. Contractors may be required to simultaneously perform work items across districts if awarded multiple items. The solicitation will be available for download on FedBizOpps on or about May 3, 2019, with an estimated effective date of July 1, 2019. Prospective awardees must be registered in the System for Award Management to receive a federal contract.
Attachment 3 - Siuslaw NF Technical Packet (1 document)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1204T019Q0023-Amendment2.pdf | ||
| 1204T019Q0023-Amendment1.pdf | ||
| Attachment001-ExperienceQuestionaire.pdf | ||
| Attachment002-ServiceWageDetermination.pdf | ||
| Attachment005b-UMP-RoadRules.pdf | ||
| Attachment006a-RRS-Items8-10-SOW.pdf | ||
| Attachment005a-UMP-Items5-7-SOW_SPECS.pdf | ||
| 1204T019Q023-Solicitation_GeneralInstructionsClausesProvisions.pdf | ||
| Attachment004-WIL-Items2-4-SOW_SPECS.pdf | ||
| Attachment006d-RRS-Item10-SPECS.pdf | ||
| Attachment006b-RRS-Item8-SPECS.pdf | ||
| 1204T019Q023-ReturnPacket.pdf | ||
| Attachment006c-RRS-Item9-SPECS.pdf | ||
| Attachment007-FW-Items11-13-SOW_SPECS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2019 Road Maintenance BPA Solicitation #: 1204T019Q0023 Siuslaw NF: ITEM 1
ATTACHMENT 1 – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SCOPE OF CONTRACT
This contract is established for the purpose of providing routine and recurring maintenance of forest and administrative use roads managed by the Central Coast and Hebo Ranger Districts, Siuslaw National Forest. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and terms of the BPA.
Maintenance work consists of a variety of road repair activities including but not limited to the following:
Blading Pavement cleaning Watering Compaction Ditch maintenance Drainage structure maintenance Roadway drainage maintenance Spot Surfacing Pothole / Skin Patching Removal and disposal of materials Roadside brushing Logging out Rock / Earth Barrier and Gate Maintenance Sign maintenance
The intent of the BPA is for the awarded Contractor to provide routine contracted-out road maintenance work.
APPLICATION OF SPECIFICATIONS, DRAWINGS AND TERMINOLOGY
Standard specifications, drawings, definitions, abbreviations and quantity measurement terms included herein may not immediately apply to the specific work identified for Base Year 2019. These standardized requirements, if included herein, are intended to normally apply to any future work identified for addition to the contract. In addition to those included herein, there may be other specifications, drawings and terminology added via mutual agreement as needed.
FURNISHING OF MATERIAL
Unless otherwise stated on a delivery order, the Contractor shall furnish all material required for performance. All material shall comply with the specifications. The Contractor shall verify the kind and amount of work that may be necessary in furnishing the material.
The Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.
The Contractor shall be responsible for furnishing warning devices and complying with the safety standards and traffic management procedures as required by the current edition of the MUTCD for the life of this contract.
ABBREVIATIONS
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows: (Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)
1. AASHTO - American Association of State Highway and Transportation Officials.
2. ASTM – American Society for Testing and Materials.
3. AWPA – American Wood Preservers Association.
4. CS - Commercial Standard Issued by U.S. Department of Commerce.
5. EPA - Environmental Protection Agency.
6. FAR - Federal Acquisition Regulation System.
7. FED SPEC - Federal Specifications.
8. FP-03 - Standard Specifications for Construction of Roads and Bridges on Federal Highway
Projects.
9. FSS - Federal Specifications and Standards.
10. MSHA - Mine Safety Health Administration.
11. MUTCD - Manual of Uniform Traffic Control Devices.
12. NBS - National Bureau of Standards.
13. OSHA - Occupational Safety and Health Act.
14. PS - Product Standard issued by the U.S. Department of Commerce.
15. UL - Underwriter's Laboratories, Inc.
QUANTITY MEASUREMENT TERMS
1. U.S. Customary Units of measure are used in conjunction with these specifications.
2. The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.
3. A station, when used as a definition of term or measurement will be one hundred feet, or a precise location along a survey line.
4. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline.
5. A CY-MI is the amount of material in the hauling vehicle, hauled one (1) mile. Sometimes referred to as a “loaded mile”.
6. The term "ton" will mean 2000 pounds. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements.
7. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.
8. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes. The measured slope distance for the length will multiply width treated and converted to a standard 10,000 square yard or acreage value of the surface area treated.
9. The term "lump sum" when used in the Schedule of Items will mean the complete unit as required by or described in the contract.
10. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawings.
MEASUREMENT AND PAYMENT
Measurement and payment for contract work will be made only for "work ordered under" those pay items included in the Schedule of Items. Measurement and payment for work or materials required to complete the project "in accordance with" the drawings and specifications and which are not included as pay items in the Schedule of Items will be considered as incidental to and included in the payment for other pay items shown and separate measurement and payment will not be made.
BASIS OF PAYMENT
Invoice payments may be made for completed units of work as determined by the Contracting Officer or the COR. Payment authorization will be dependent upon an inspection of the project and will be based on adherence to the work specifications.
AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB
1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
GENERAL NOTES
832 Load, Haul, and Place Material: Slough and Slide material that has accumulated in the ditch/roadway that is 5 CY or less shall be considered incidental to each BPA Call.
851 Hazard and Obstruction Removal: Logging out trees less than 10-inches shall be considered incidental to each BPA Call.
ATTACHMENT #2
Specification List – Road Maintenance Services for Siuslaw National Forest
SPECIFICATION
NUMBER DESCRIPTION
807 EQUIPMENT RENTAL
811 SURFACE MAINTENANCE
811-F1 SURFACE MAINTENANCE (SAND ROADS)
813 SPOT SURFACING
814 ASPHALT SURFACE MAINTENANCE
814-F1 ASHALT SURFACE MAINTENANCE (POTHOLE / SKIN PATCHING)
832 LOAD, HAUL, AND PLACE MATERIALS
834 ROADWAY DRAINAGE SYSTEM MAINTENANCE
842 ROADWAY VEGETATION MAINTENANCE
851 HAZARD AND OBSTRUCTION REMOVAL
861 MAINTENANCE OF TRAFFIC GATES AND BARRIERS
872 SIGN MAINTAINANCE
881 MOBILIZATION / EQUIPMENT MOVING
T-891 WATER SUPPLY AND WATERING
807 EQUIPMENT RENTAL
807.01 Service Required
Furnishing and operating equipment.
807.02 Performance Standard
The equipment shall be furnished as specified in the table below:
Description Max Age
Min
HP
Min Reach
Min Weight Capacity Attachments Remarks
Excavator Years
50 21’ 18,000 0.5 CY
In addition to common excavation, must be equipped to grasp and lift logs up to 36-inches diameter and boulders up to 30-inch diameter
Dozer Years
100 20,000 2.5 CY
Minimum track width 20”, minimum ground contact area of 3,500 square inches, maximum ground pressure of 4.5 pounds per square inch
Backhoe years
70 15’ 15000
1.25CY
bucket
72” front, 24” back bucket
Extend-a-hoe acceptable
Grader years
140 - 30000 12’ wide blade
Rippers
Dump Truck years
- - - 10CY
Brush Cutter years
- 14’ Rotary capable Wheeled only
Roller years
- 15,500 - Vibratory, pneumatic
Make equipment available for inspection and approval before use
807.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, included in the SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.
807.04 Acceptable Quality Levels
A. Equipment shall be clean and free of soil, plant parts, seeds, and other debris.
B. Equipment shall be well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.
C. Equipment shall be operated by a fully trained, qualified, and competent operator at all times.
807.05 Measurement
A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
C. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
D. Moving of equipment will be paid at the established hourly rate.
807.06 Payment
A: The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule if items. Payment will be full compensation for the work prescribed in this Section.
PAY ITEM PAY UNIT
807(1) Excavator Hour 807(2) Backhoe Hour 807(3) Grader Hour 807(4) Dump Truck Hour 807(5) Brush Cutter Hour 807(6) Roller Hour 807(7) Dozer Hour
807.07 ACCEPTABLE QUALITY LEVELS:
Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Weed free equipment
Equipment not weed free.
N/A 0 N/A
Equipment rejected until it can be made weed free
N/A
Maintenance of Equipment
Equipment not capable of operating at least 90% of the time
N/A 0 N/A Replace defective equipment N/A
Equipment meets all state and federal regulations
Does not meet state and federal regulations
N/A 0 N/A
Bring equipment up to state and federal regulations or replace equipment
N/A
Equipment leaks
Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment
Small leaks inherent in the specific type equipment
0 N/A
Replace equipment and restore affected site as directed by the Contracting
Officer
Place absorbent pads under equipment when not operating.
Equipment will be operated by a fully trained, qualified, and competent operator at all times.
Operator not fully trained, qualified, and competent.
N/A 0 N/A
Stop equipment operation until a fully trained, qualified, and competent operator is available.
Repair any damage done by incompetent operator as directed by the Contracting
Officer
N/A
SECTION 811 – SURFACE MAINTENANCE
811.01
SERVICE REQUIRED:
Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts and intersections. Surface maintenance includes reshaping the crown or slope of traveled way, berms, and drainage dips. Scarification, compaction, or both may be required when shown on the ROAD LISTING.
811.02
PERFORMANCE STANDARD:
Primary and Secondary Roads
A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. Scarification to facilitate cutting potholes or other irregularities shall be required. The surface is smooth, and compact, crowned or sloped to drain, without segregation of the surfacing materials. Suitable materials have been recovered and incorporated. Crowned or in sloped road surfaces allow water to flow directly into ditches. Shoulders beyond the edges of the traveled way and turnouts have been shaped to allow drainage off and away from the road surface. Unsuitable materials have been removed from the traveled way and shoulders, placed outside the roadbed without concentrations and without obstructing drainage ways or structures.
When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
When specified in the ROAD LISTING, water has been hauled and incorporated into the surfacing material to reduce segregation and/or to improve required compaction.
When specified in the ROAD LISTING, aggregate surfacing has been roller compacted following final shaping so that no visual displacement occurs from hauling or spreading equipment.
Shoulders along paved roads are maintained to standard when unsuitable material (soil, moss, gravel, and other debris) has been removed from paved surfaces within 3-feet of pavement edges on both sides of the road. Unpaved shoulders adjacent to paved surfaces have been maintained and shaped to provide a smooth transition from the paved surface and to allow drainage off and away from the road surface or into ditches.
Shoulders without ditches are shaped for a minimum of 2-feet, up to 6-feet, from the pavement edge as necessary for drainage. Unsuitable materials have been removed from the shoulders. All unsuitable materials removed from paved surfaces and shoulders have been placed outside the roadbed without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
811.03
LOCATION OF WORK:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, OR as ordered by the Contracting Officer.
811.04
MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-hundredth (0.01) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-hundredth (0.01) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
811.05
PAYMENT:
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section, except payment for hauling and placing of materials will be paid under Section 832 and hauling and spreading of water will be paid under Section 891.
Pay Item Pay Unit
811(1) Surface Maintenance: Single Lane Roads Mile
811(2) Surface Maintenance: Double Lane Roads Mile
811(3) Roller Compaction: Single Lane Roads Mile
811(4) Roller Compaction: Double Lane Roads Mile
811(5) Shoulder Maintenance: Paved Roads Mile
811.06 ACCEPTABLE QUALITY LEVELS:
Description Major Defect Minor Defect Allowable Defects
Required Action
Major Minor Major Minor
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10%
Gradation of surface aggregate is degraded by less than 10% per pay unit
1per pay unit
Rework
Rework if greater than 2 minor defects
A loss of more than 10 CY/mile
A loss of more than 10 CY/mile per pay unit
0 per pay unit
Replace or recover lost material
Accept the loss of material
Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised
Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised per pay unit
2 per pay unit
Rework Accept the loss of surface quality
Roller Compaction
Visible displacement occurs under hauling or spreading equipment pay
Ditches and Road Drainage Structures
Impeded flow or water diverted out of drainage structure
<20% impeded, but water will stay in channel per pay unit
1 per pay unit
Rework Rework if greater than 1 minor defect
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope pay unit
1 per
Repair and Stabilize
Revegetate if greater than 1 minor defect
Shoulder Maintenance (Paved Roads)
Elevation difference between pavement and shoulder is greater than 1-inch pay
Material greater than ¼-inch diameter remaining on the road surface pay
Required Action
Major Minor Major Minor
Surface Irregularities
Potholes greater than 1-inch deep and wider than 1-foot
0 per
Rework N/A
Washboards greater than 1-inch deep and greater than 20 feet in length along road
Rework N/A
Road Cross Section
Crown or cross slope is not uniform and does not drain as specified on more than 200’ of surface per mile, and/or is less than 3%
Rework to achieve less than 10 percent length out of range.
Rework for 100 percent drainage
SPECIAL PROJECT SPECIFICATION
811-F1 – SURFACE MAINTENANCE
811.F1(01)
Maintain sand roads on the Oregon Dunes National Recreation Area. Berms along the road sides shall be pushed back onto the roadway. Undulations (oversize washboards) shall be smoothed out on the roadway surface. Wet areas shall be covered with sand. Existing culverts or geotextile/geogrid shall be covered with sand at a minimum of 18 inches in depth. Drainage channels shall be cleaned along roadway. All vehicles/equipment shall have a red or orange flag (8” x 12”) displayed 9 feet above the ground
811.F1(02)
Sand Roads
When reclaiming sand from edges of the roadway that has been displaced by users, the roadway may vary 12 feet to 24 feet. Push reclaimed sand into roadway within width specified in ROAD LISTING.
Smooth roadway surface, eliminating regularly occurring undulations (oversize washboards). Maintain overall roadway surface variations from 6 inches to 2 feet. Ensure holes and drop offs are not left in the roadway by equipment.
Depressions filled with water shall be covered with sand pushed from designated areas near the site or from waste created from smoothing road or cleaning drainage channels.
All existing culverts and exposed geotextile/geogrid shall be covered with a minimum of 18 inches of sand. Raised areas along the roadway over these sites are acceptable to achieve full coverage.
Clear drainage channels to a depth of up to 3 feet, and a width of up to 5 feet as specified in the ROAD LISTING.
Waste generated from any of the above activities shall be placed in roadway and smoothed out.
811.F1(03)
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, OR as
811.F1(04) in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-hundredth (0.01) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-hundredth (0.01) mile.
811.F1(05) the Section 811-F1 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section, except payment for hauling and placing of materials will be paid under Section 832 and hauling and spreading of water will be paid under Section 891.
811-F1(1) Surface Maintenance: Single Lane Roads Mile
811-F1(2) Surface Maintenance: Double Lane Roads Mile
813 SPOT SURFACING
813.01 Service Required
Load, haul, and place surface material to repair or stabilize road surfaces.
813.02 Performance Standard
A. Spot surfacing is complete when the designated quantity of the ordered material has been placed.
B. All materials transported onto National Forest System land will be weed-free. Written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor will be furnished to the Contracting Officer before transport of any materials onto National Forest System land.
813.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as
813.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed.
B. Material measured by the ton shall be verified by certified weight tickets.
813.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 813 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
813(1) Spot Surfacing, Government Source Cubic Yard 813(2) Spot Surfacing, Commercial Source Cubic Yard
813.06 ACCEPTABLE QUALITY LEVELS:
Major Defect Minor Defect Allowable Defects
Depth of
Dimension of spot surfacing deviates by more than 1” from depth specified. Or less than 1” from dimension specified buy is consistently high or low
Dimension of spot surfacing deviates by 1” or less than from depth specified and not consistently wide.
N/A If depth is low correct placement of aggregate to specified dimension.
If depth is high only pay for ordered amount
Accept aggregate as placed, pay only for delivered quantities
Width of
Dimension of is less than specified width or more than 1’ wider than specified
Dimension of spot surfacing is up to 1’ wider than specified but not consistently wide
N/A If width is narrow correct placement of aggregate to dimensions.
If width is to wide reshape
Accept aggregate as placed, pay only for
Length Dimension of is shorter than specified length or more than 100’ longer than specified
Dimension of spot surfacing is shorter than specified length or up to 100’ longer than specified
0 N/A
If length is shorter than specified, correct placement of aggregate to specified dimensions.
If too long pay only for ordered amount
Accept aggregate as placed, pay only for
Compaction Visible displacement occurs under heady spreading equipment
N/A 0 N/a Rework N/A
Quality
Does not meet specified gradation or durability requirements and is not suitable for intended use
N/A 0 N/A Reject and replace
Accept but may reduce payment
Material source does not meet weed free requirement
N/A 0 N/A Reject Source
N/A
Finish Quality Spot Surfacing doesn’t conform to the adjacent road segments and traffic is impeded
Spot Surfacing generally conforms to the adjacent road segments, but traffic may be slowed
0 1 Reshape or recompact surfacing as needed
Accept but may reduce payment
814 ASPHALT SURFACE MAINTENANCE
814.01
Cleaning of pavement surfaces consists of removing loose material and vegetation from paved traveled ways, including bridge decks and paved shoulders. Shape existing shoulder to allow drainage.
814.02
Clean the paved surface to the existing width. Move materials away from road centerline on double-lane roads. Blade and shape existing shoulder material the entire width to drain away from the travel way. Vegetative or other unsuitable materials may be bladed onto slopes adjacent to the roadbed unless otherwise required in SPECIAL PROJECT SPECIFICATIONS. Provide a smooth transition with final shaping to the paved surface edge. Move all material longitudinally off the deck while cleaning a bridge deck.
Equipment
A. Use equipment that has capability of removing all loose material from paved surfaces without damage to the surface.
B. Use of hydraulic flushing equipment will not be permitted within a horizontal distance of 60 meters (200 feet) of a live stream, unless approved in writing by the Government.
814.03
814.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: The work activity will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: The work activity will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
814.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
814(1) Paved Surface Cleaning (Single Lane) Mile 814(2) Paved Surface Cleaning (Double Lane) Mile
814.06 Acceptable Quality Levels
Description
Major Defect Minor Defect Allowable Defects
Surfacing Cleaning
More than 5% of surface is not cleaned as specified
N/A Rework N/A
Shoulder Maintenance
Elevation difference between pavement and shoulder is greater than 1”
Elevation difference between pavement and should is greater that 1”
0 Rework Rework
SPECIAL PROJECT SPECIFICATION (01/15)
814-F1 ASPHALT SURFACE MAINTENANCE
814.F1(01)
Repair of pavement surfaces.
814.F1(02)
This work is complete when specified pavement potholes and surface irregularities are repaired using full depth patches or skin patches. Furnish Hot Asphalt Pavement Mix, ODOT Spec. 3/8” Dense Gradation, Level II HMAC, Asphalt Grade PG 64-22, as approved by the CO.
Pothole Patching:
1. Remove material to a minimum depth of 4 inches, or as necessary to reach firm support. If firm support for a patch is unavailable, notify the CO prior to placing any material.
2. Saw cut edges of the prepared hole to form a vertical face in un-fractured asphalt surfacing. Make the prepared hole rectangular, and clean it of all loose material. When the hole is dry, apply emulsified asphalt tack coat faces of the hole.
Barricade prepared sites if patching is not performed prior to allowing traffic through the site.
3. Place the asphalt concrete mixture in layers not exceeding 4 inches. Thoroughly compact each layer with mechanical tampers or rollers. For hot asphalt concrete mixtures, compact the mix while it is above 230 °F.
4. Compact the finished surface with an approved steel-wheel roller, as approved by the CO. Ensure that the compacted patch is approximately 1/8 to 1/4 inches above the level of the adjacent pavement.
5. Seal the edges of the completed patch with emulsified asphalt, and blot with fine sand. The CO will approve the exact application rate, temperature, and area to be treated before application and may make adjustments for variations in field conditions.
6. Disposal of asphalt concrete materials removed from pothole patching operations shall be removed from National Forest lands and disposed of in a legal manner. Disposal of asphalt concrete is considered to be incidental to Pothole Patching.
Skin Patching:
1. Clean the existing surface of all loose material, dirt, or other deleterious substances by approved methods. Apply asphalt tack coat on a dry, unfrozen surface when the air temperature in the shade is above 35 ºF and rising.
2. Where using slow-setting emulsified asphalt, dilute by adding an equal amount of water to the emulsified asphalt. Apply the asphalt at a rate of 0.03 to 0.15 gallons per square yard. Apply the tack coat uniformly and completely by fogging with a hand spray attachment or by another approved method. If excess asphalt material is applied, squeegee the excess from the surface.
3. Allow the tacked surfaces to completely cure before placing the covering course. Place the covering course within 4 hours of placing the tack coat. Place the asphalt concrete mixture as shown in #3, #4 and #5, Pothole Patching.
814.F1(03)
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
814.F1(04) listed in the SCHEDULE OF ITEMS completed and accepted.
A. Ton: Material measured by the ton shall be verified by certified weight tickets.
Tonnage remaining in the haul vehicle, disposed of at an approved waste area, material that does not meet applicable specs, or material that is not placed shall have its quantity measured and shall not be included in final completed and accepted quantities for payment.
814.F1(05)
The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
814-F1(1)
Pothole Patching, Ton
Per Order
814-F1(2) Skin Patching, Ton Per Order
814.06 Acceptable Quality Levels
Major
Defect
Minor
Defect
Allowable Defects Required Action
Pothole Patching
Finished elevation does not match adjoining segments by less than 1/4
Patched material does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be patched is not properly prepared
N/A 0 N/A Rework N/A
Skin Patching
Finished elevation does not match adjoining segments by less than 1/4
Patched material does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be patched is not properly prepared N/A 0 N/A Rework N/A
Asphalt Quality
Product and gradation does not meet Specifications and is not suitable for job.
Product and gradation does not meet Specifications but is otherwise suitable for job.
1 per unit
Reject and replace
Accept but may reduce payment.
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Suspend work until in compliance
Suspend work
SECTION 832 – LOAD, HAUL, AND PLACE MATERIALS
832.01
Load, haul, and place material at designated sites.
832.02
Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and re-vegetation as ordered by the Contracting Officer. Other unsuitable material, aggregate stockpiles, or slash designated for hauling has been loaded and placed in designated locations.
832.03 directed by the Contracting Officer. Waste areas will be identified within two (2) miles of the slide site.
832.04
A. Lump Sum: Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
The quantity is designated as “All”. Estimated quantities denote one complete unit of work as required by, or described in, the contract, including necessary materials equipment and labor to complete the job.
832.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 832 pay item listed in the schedule of items. Payment will be full
832(1) Load, Haul, and Place Material (Slides >5 -20CY) LS 832(2) Load, Haul, and Place Material (Slides 21-50 CY) LS 832(3) Load, Haul, and Place Material (Slides 51 – 100 CY) LS
832.06 ACCEPTABLE QUALITY LEVELS:
Major Defect Minor Defect Allowable Defects
Slopes
Unstable material left on slopes
Material left on slopes that can be stabilized and won’t block drainages unit
Remove Remove or stabilize in place
Backslopes
Undercut result in destabilization of slope
Undercut backslope will not result in destabilization of slope unit
Repair and Stabilize
Revegetate if greater than 2 minor defects
Ditches, inlet/outlet channels, streams and catch basins
Water will be diverted out of the drainage structure or soil enters system
<20% impeded, but water will stay in the channel
0 1 per greater than 3
Debris on Road
Debris in traveled way that may slow or impede low clearance vehicles
Debris in traveled way that does not slow or impede low clearance vehicles
0 1 per pay unit
Rework Rework if greater than 1 minor defect
Placed material (Disposal Sites)
Unstable material on designated sites
N/A N/A Stabilize N/A
SECTION 834 – ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01
Clean and recondition roadway drainage systems including culverts, ditches, inlets and outlet channels, catch basins, and appurtenances.
834.02
Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel.
Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.
Materials produced from drainage system maintenance have been placed outside the roadway without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, materials have been hauled and placed in designated disposal areas.
834.03
A. As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the contracting Officer and;
1. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area SHOWN ON THE PLANS or in the SUPPLEMENTAL SPECIFICATIONS.
2. Culverts – a minimum external horizontal distance of 10 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.
3. Ditches adjacent to the roadbed.
4. This work does not include bridges, cattle guards, drain dips, or water-bars.
834.04
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes or number of culverts.
834.05 the Section 834 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section, except payment for hauling and placing of materials will be paid under Section 832.
Pay Item Description Pay Unit
834(1) Clean Ditches Mile 834(2) Clean Ditches and Drainage Structures Mile
834.06 ACCEPTABLE QUALITY LEVELS:
Defects Required Action
Major Minor Major Minor
Blocked Culverts Greater than 20% of end area blocked
20% or less of end area blocked
0 1 per pay unit
Rework Rework if greater than 1 minor defects
Damaged Culvert inlet/outlets
Greater than 20% of end area blocked
20% or less of end area blocked
0 Rework
Repair
Impeded flow for ditches, inlet/outlet channels, and catch basins
Water will be diverted out of the drainage structure or system
<20% impeded, but water will stay in the channel
0 3 per greater than 3
Debris on Road produced by Service Provider operations
Any debris in traveled way
N/A 0 N/A Rework N/A
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10%
Gradation of surface aggregate is degraded by 10% or less
0 50 Feet per feet
Rework/ Replace
Rework if greater than 1
Backslopes Undercut result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 0 Repair and Stabilize
Re-vegetate
Vegetation Woody vegetation within 5 feet of the inlet end of drainage structures or in ditches that interferes with flow
Low growing vegetation within 5 feet or more of inlet of drainage structures or in ditches that does not interfere with flow
0 N/A Remove Remove / Leave in place
SECTION 842 – ROADWAY VEGETATION MAINTENANCE
842.01
Cutting all vegetative growth, including trees and other vegetation less than 5 inches in diameter measured 6 inches above the ground, on roadway surfaces and roadsides to include sand routes. All vehicles/equipment shall have a red or orange flag (8” x 12”) displayed 9 feet above the ground when performing service on sand routes.
842.02
A. General
1. Brush, trees and other vegetation are cut within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps.
All limbs which extend into the clearing limits, or over the roadbed, to a height of 14 feet above the traveled way surface elevation have been removed.
2. Items to remain will be DESIGNATED ON THE GROUND.
3. Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
4. Trees within the cutting limits, but outside the roadbed and ditch, which are over 5 inches measured at 6 inches above the ground have been limbed in lieu of cutting.
5. Limbed trees have limbs cut within 4 inches of the trunk.
6. There is minimal or no damage to trunks of remaining trees.
B. Cutting Side Vegetation
1. The treated area includes the road bed measured from the center line to each defined road edge, or to the bottom of the ditch on ditched road segments, plus an additional 10 feet on each side. Where there is no defined road edge or ditch, the treated area extends 20 feet from each side of the road center line.
2. Transitions between differing increments of cutting width have tapered lengths of not less than 50 feet and not more than 70 feet.
C. Debris
1. Materials resulting from the cutting operation in excess of 12 inches in length or 1 inch in diameter do not remain on roadway slopes within the treated area, in ditches, or within water courses.
2. Limbs and chunks in excess of 3 inches in any dimension do not remain on the traveled way or shoulders.
842.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or ordered by the Contracting Officer.
842.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
842.05 PAYMENT:
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 842 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
842(1) Cutting Roadway Vegetation Mile
842.06 - ACCEPTABLE QUALITY LEVELS:
Required Action
Major Minor Major Minor
Tree damage Damage to more than 30% of the tree bole
Damage to less than 30% of the tree bole per pay unit
5 per pay unit
Remove or treat
Treat
Horizontal Clearance
More than 20% not cleared to limits
20% or less not cleared to limits per pay unit
0 per pay unit
Rework Rework
Vertical
More than 20% not cleared to limits
20% or less not cleared to limits per pay unit
1 per pay unit
Rework Rework
Height above ground surface
More than 20% not cleared to limits
20% or less not cleared to limits per pay unit
1 per pay unit
Rework Rework
Drainage Impeded flow or water diverted out of drainage structures
20% or less impeded, but water will stay in the channel per pay unit
1 per pay
Rework Rework
Oversized Material
Concentrations of material greater than 3” in any dimension remaining on traveled way or shoulders
Isolated pieces of material greater than 3” in any dimension remaining on traveled way or shoulders per pay unit
10 per pay unit
Rework Rework if greater than 2 minor defects
Material greater than 1” diameter and 12” in length remaining on roadway slopes, ditches or water courses.
N/A 0 per pay unit
N/A Rework N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures per pay unit
0 per
Suspend work until in compliance
Suspend work
SECTION 842A – ROADWAY VEGETATION MAINTENANCE
842A.01
Cutting all vegetative growth, including trees and other vegetation less than 5 inches in diameter measured 6 inches above the ground, on roadway surfaces and roadsides to include sand routes. All vehicles/equipment shall have a red or orange flag (8” x 12”) displayed 9 feet above the ground when performing service on sand routes.
842A.02
A. General
1. Brush, trees and other vegetation are cut within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps.
All limbs which extend into the clearing limits, or over the roadbed, to a height of 14 feet above the traveled way surface elevation have been removed.
2. Items to remain will be DESIGNATED ON THE GROUND.
3. Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
4. Trees within the cutting limits, but outside the roadbed and ditch, which are over 5 inches measured at 6 inches above the ground have been limbed in lieu of cutting.
5. Limbed trees have limbs cut within 4 inches of the trunk.
6. There is minimal or no damage to trunks of remaining trees.
B. Cutting Side Vegetation
1. The treated area includes the road bed measured from the center line to each defined road edge, or to the bottom of the ditch on ditched road segments, plus an additional 5 feet on each side. Where there is no defined road edge or ditch, the treated area extends 15 feet from each side of the road center line.
2. Transitions between differing increments of cutting width have tapered lengths of not less than 50 feet and not more than 70 feet.
C. Debris
1. Materials resulting from the cutting operation in excess of 12 inches in length or 1 inch in diameter do not remain on roadway slopes within the treated area, in ditches, or within water courses.
2. Limbs and chunks in excess of 12 inches in any dimension do not remain on the traveled way or shoulders.
842A.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or ordered by the Contracting Officer.
842A.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
842A.05 PAYMENT:
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 842 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
842A(1) Cutting Roadway Vegetation Mile
842A.06 - ACCEPTABLE QUALITY LEVELS:
Required Action
Major Minor Major Minor
Tree damage Damage to more than 30% of the tree bole
Damage to less than 30% of the tree bole per pay unit
5 per pay unit
Remove or treat
Treat
Horizontal
More than 20% not cleared to limits
20% or less not cleared to limits per pay unit
0 per pay unit
Rework Rework
Vertical
More than 20% not cleared to limits
20% or less not cleared to limits per pay unit
1 per pay unit
Rework Rework
Height above ground surface
More than 20% not cleared to limits
20% or less not cleared to limits per pay unit
1 per pay unit
Rework Rework
Drainage Impeded flow or water diverted out of drainage structures
20% or less impeded, but water will stay in the channel per pay unit
1 per pay
Rework Rework
Oversized Material
Concentrations of material greater than 12” in any dimension remaining on traveled way or shoulders
Isolated pieces of material greater than 12” in any dimension remaining on traveled way or shoulders per pay unit
10 per pay unit
Rework Rework if greater than 2 minor defects
Material greater than 1” diameter and 12” in length remaining on roadway slopes, ditches or water courses.
N/A 0 per pay unit
N/A Rework N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures per pay unit
0 per
Suspend work until in compliance
Suspend work
851 HAZARD AND OBSTRUCTION REMOVAL
851.01
Remove and/or stabilize hazards and obstructions.
851.02
Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
851.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or
851.04
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
851.05
A. Payment will be made under:
851(1) Logging Out Mile 851(2) Logging Out, and Disposal of Trees, Each 10-inches to 24-inches in Diameter 851(3) Logging Out and Disposal of Trees, Each Greater than 24-inches in Diameter 851(4) Hazard or Obstruction Removal Each
851.06 -Acceptable Quality Levels
Defect Defect Major Minor Major Minor
Utilization of Timber
Log lengths do not meet utilization standards (see BPA Call)
N/A 0 N/A
Charge for loss of stumpage or Recut to acceptable length
N/A
Stump Heights
Exceed Specified Height by more than 12 inches
Exceed Specified Height by up to 6 inches
0 per pay unit
2 per pay unit
Rework
Rework if greater than
4 minor defects
Tree damage caused by Service Provider's operations
Damage to more than 30% of the tree bole
Damage to 30% or less of the tree bole
0 per pay unit
0 per pay unit
Remove or Treat
Treat
Impeded flow for ditches, inlet/outlet channels, and catch basins caused by Service Provider's Operations
Water will be diverted out of the drainage structure or system
20% or less impeded, but water will stay in the channel.
2 per pay unit
Rework
Rework if greater than
2 minor defects
Hazards that interfere with the use of the road
Unstable hazards that remain in the Clearing Limits
0 N/A Rework N/A
Log Out
Horizontal clearance -more than 20% not cleared to specified distance
Horizontal clearance - 20% or less not cleared to specified distance
1 per pay unit
Rework
Rework if greater than
1 minor defect
Vertical clearance -more than 20% not cleared to specified distance
Vertical clearance - 20% or less not cleared to specified distance
1 per pay unit
Rework
Rework if greater than
1 minor defect
Work Area Management
Not following approved safety plan which may include signs, flaggers, & other temporary traffic control measures
N/A 0 0 Suspend work until in
861 MAINTENANCE of TRAFFIC GATES and BARRIERS (8/07)
861.01
Maintain traffic gates and barriers. Install and Remove traffic gates and barriers.
861.02
A. Traffic gate maintenance is complete when it is free of structural defects, the gate and all associated posts are stable and the locking mechanism is in working order, the surfaces are free of oxidation and painted, and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters.
B. Rock and earth barrier installation or maintenance is complete when it is stable, aligned and at the dimensions SHOWN ON THE PLANS, and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters. Earth and rock material required other than what is available onsite, when designated in the ROAD LISTING, will be obtained from designated sources.
861.03
861.04 listed in the SCHEDULE OF ITEMS completed and accepted.\
Linear Foot: Work activities by the linear foot measured by using standard survey methods rounded to the nearest one (1) foot.
861.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 861 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section, except payment for hauling and placing of materials will be paid under Section 832 and sign installations will be paid under Section 872.
861(1) Maintain traffic gate Each
861(2) Install or Maintain rock/earth barrier Each
861.05 - Acceptable Quality Levels
Defect Defect Major Minor Major Minor
Metal Surfaces
Exposed metal, rust , or oxidation, greater than 25% of surface
Exposed metal, rust, or oxidation, 25% or less of surface 0 10% per unit Paint or Coat
Repair if greater than 3 minor defects
Penetrated rust or oxidation that compromises structural integrity
Penetrated rust or oxidation that does not compromise structural integrity
0 0 Replace component Paint or Coat and notify
Structural Integrity
Major cracks, broken, decomposed, or missing components and fasteners.
Minor cracks, loose components and fasteners.
0 0
Replace component and/or fasteners
Repair component and/or fasteners
Alignment
Greater than 10% deviation from original lines and grades, or non-functional.
10% or less deviation from original lines and grades.
1 per unit
Repair or replace
Repair if greater than 1 minor defect
Vaults & drainage
Greater than 50% of the vault is full or drainage is impeded.
50% or less of the vault is full and drainage is not impeded.
1 per unit
Clean Repair if greater than 1 minor defect
Signs & Markers
Missing, non-functional or non-readable
Bent or damaged, but still functional and readable 0 2 per unit
Repair or replace
Repair or replace if greater than 2 minor defects
Debris produced by operations.
Debris left on road or placed in drainage structures.
N/A 0 N/A Remove from road or drainage
N/A
Removed materials or pieces left on National Forest
Unserviceable posts, rails, or other materials left on National Forest
N/A 0 N/A Remove from
National Forest
N/A
Materials and Methods
Does not conform to AASHTO, ASTM, AWPA, and MUTCD standards and does not meet or exceed the original materials used
N/A 0 N/A Reject and replace
872 SIGN MAINTENANCE
872.01
Furnish, install, and maintain forest entrance, destination, route markers, and traffic signs.
872.02
Sign Maintenance is complete when designated signs meet the quality standards of Forest Service Handbook EM 7100-15 - Sign and Poster Guidelines for the Forest Service, and installed according to the current edition of Forest Service Sign Installation Guide 6E62H99 – Sign Installation Field Guide, available at http://fsweb.wo.fs.fed.us/eng/programs/signs.htm
872.03
As specified on roads listed on the road listing, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
872.04
A. Mile: Work activity will be measured along the centerline of the road
872.05
A. Payment will be made under:
872(1) Install or Replace Single Post and Sign, Each Government Furnished 872(2) Install or Replace Double Post and Sign, Each Government Furnished 872(3) Install or Replace Sign, Each Government Furnished
872.06
Acceptable Quality Levels
Defect Defect Major Minor Major Minor
Materials
Signs, posts and other materials do not meet applicable standards
N/A 0 N/A Reject and replace N/A
Installation
Not installed according to applicable standards
(MUTCD)
Greater than 6” variance on sign height
0 1 Rework Rework
Maintenance
Not maintained according to applicable standards
N/A 0 N/A Rework N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A 0 0 Suspend work until in
SECTION 881 – MOBILIZATION / EQUIPMENT MOVING
881.01
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02
A. Mobilization is complete when 100% of the personnel, equipment, and materials necessary to complete the work have been moved to the project site.
B. Moving is complete when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
881.03
As specified on roads listed on the ROAD LISTINGS, SHOWN ON THE PLANS, or as
881.04
A. Mile: Work activity…