| File | Type | Posted |
|---|---|---|
| McCall_Air_Base_Tarmac_Replacement_Project_Questions_(8.12.pdf | ||
| S2.revised.8.1.2019.pdf | ||
| Amendment__1.pdf | ||
| G2.revised.8.1.2019.pdf | ||
| McCall_Air_Base_Tarmac_Replacement_Project_Questions_(8.1.19).docx | DOCX document | |
| McCall.Apron.Replacement.Schedule._Items.Final.7.16.2019.pdf | ||
| Attach_1_McCall_Apron_specs_FINAL.7.15.pdf | ||
| Attach_2_McCall.Apron.Replacement.DWG_Final_7.12.2019-signed.pdf | ||
| Attach_5_Past_Performance_Questionnaire.pdf | ||
| Attach_4_DETERMINATION_OF_RESPONSIBILITY_LETTER.doc | DOC document | |
| Attach__3_Wage_Determination.pdf | ||
| Attach_4_DETERMINATION_OF_RESPONSIBILITY_LETTER.pdf | ||
| Attach_6_Workman's_comp_sheet_with_link.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR'S COPY
NOTE: Attached forms must be completed and submitted intact.
Solicitation No. RFP 12026119R0010 HELP PREVENT FOREST FIRES
IMPORTANT - NOTICE TO OFFEROR
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)
3. All questions regarding this solicitation must be in writing and addressed to the Contracting Officer email Tanya Spanfellner-tanya.spanfellner@usda.gov.
All questions must be received no later than 1630 MT on Wednesday July 30, 2019 to be considered prior to solicitation close date.
AT A MINIMUM PROVIDE THE FOLLOWING
1.SF-1442, Complete, date, and sign.
Provide DUNS NUMBER and email address. Block 14
2. Representations and Certifications Section K 52.204-8. You must complete Representations and Certifications via SAM, please only submit a response to Paragraph (b)(1) Pg. 22 and 24(as needed).
3.Provide information required Section L 452.215-71
4. Fill out the pricing schedule for all items Section B-Schedule of Items Pages 6-12, or similar providing same information. Place totals on Pages 3-5 SF-1442
5. Provide Liability insurance verification
6. Complete Determination of responsibility, Attach 4
7. Submit Bid Guarantee 52.228-1
Proposals are due August 14, 2019 by 1630 MT Hand deliver or mail to USFS ATTN: Tanya Spanfellner 1249 S Vinnell Way, Ste 200 Boise, ID 83709-1663 Or Email:tanya.spanfellner@usda.gov
Issuing Office:
U.S. Department of Agriculture Forest Service SW Idaho/Nevada Acquisition Center
ATTN:TANYA SPANFELLNER
1249 S. Vinnell Way, Suite 200 Boise, ID 83709
Offers Are Solicited For:
MCCALL AIR BASE APRON REPLACEMENT
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
SW IDAHO-NEVADA ACQUISITION CENTER
ATTN-TANYA SPANFELLNER
1249 S VINNELL WAY STE 200
BOISE ID 83709-1663
TANYA SPANFELLNER 208-373-4130
1x 07/16/2019
12026119R0010
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
McCall Air Base Apron Replacement
ESTIMATED PRICE RANGE is BETWEEN-$1,000,000-$5,000,000
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
________________________ 08/14/2019
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
SW IDAHO-NEVADA ACQUISITION CENTER
ATTN-TANYA SPANFELLNER
1249 S VINNELL WAY STE 200
BOISE ID 83709-1663
TANYA SPANFELLNER
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
Duns No.:____________________________ Email Address:_________________________
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12026119R0010
McCall Air Base Apron Replacement
Delivery Location Code: 0256
USDA FOREST SERVICE
FOREST SUPERVISOR
PAYETTE NATIONAL FOREST
MC CALL ID 83638 US
Base Bid (Aircraft Apron Asphalt Parking)
Delivery: 120 Days After Award
FOB: Destination
Optional Bid Item A - (Apron Asphalt -North)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
Optional Bid Item B (Aircraft Concrete Parking
Pads - EACH)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
Optional Bid Item C (Aircraft Concrete Parking
Area)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
Optional Bid Item D (Helipad Pavement)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
Optional Bid Item E (Overflow Parking)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12026119R0010
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
007 Optional Bid Item F (Helibase Parking)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
008 Optional Bid Item G (North Smokejumper Access)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
009 Optional Bid Item H (Airtanker Base Parking Area and Retardant Area)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
010 Optional Bid Item I (North Access Road)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
011 Optional Bid Item J (Smokejumper Base Parking
Area)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
012 Optional Bid Item K (Gates and Fencing)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12026119R0010
AIRPORT RUNWAYS AND TAXIWAYS
013 Optional Bid Item L (Fuel Containment Basin)
(Option Line Item)
Product/Service Code: Z1BD
Product/Service Description: MAINTENANCE OF
AIRPORT RUNWAYS AND TAXIWAYS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Total Base and all Options $______________
USDA Forest Service
ITEM
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY Use Unit Price TOTAL
010250 Construction Staking (combined base bid and option
A) LSQ LS 1 $ $
011900 Mobilization LSQ LS 1 $ $
033545-1 Concrete Valley Gutter DQ LF 170 $ $
321311-2 Aircraft Tie-Downs (Asphalt) AQ EA 18 $ $
101400-1 Regulatory Signs - Aluminum on Galv. Steel Tube Posts AQ EA 6 $ $
312100-1 Project Site Preparation and Grading (combined original base bid and option item A) LSQ LS 1 $ $
312100-2 Excavation and Haul (assumes 11" of material is removed from the site) DQ CY 6,100 $ $
321200 Hot Mix Asphalt Pavement (Airfield) DQ Ton 5,170 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (Aggregate Base Course) DQ CY 3,250 $ $
322640-1
Pavement Markings - Aircraft Taxi Lines 6" Solid Yellow Reflective with 6" Solid Black Non Reflective both sides DQ LF 2,534 $ $
322640-2 Pavement Markings - Aircraft Taxi Parking Lines 4" Solid Yellow DQ LF 650 $ $
322640-3 Pavement Markings - Aircraft Taxi Parking Lines 4" Solid White DQ LF 350 $ $
322706-1 Pulverize Asphalt Pavement and Existing Base Coarse 8" deep DQ SY 17,914 $ $
323113-1 Chain Link Fence DQ LF 514 $ $
323113-2 Pedestrian Gate - 5 Foot Wide Opening AQ EA 1 $ $
010250 Construction Staking LSQ LS 1 $ $
321200 Hot Mix Asphalt Pavement (Airfield) DQ Ton 1,310 $ $
321311-2 Aircraft Tie-Downs AQ EA 12 $
312100-1 Project Site Preparation and Grading LSQ LS 1 $ $
312100-2 Excavation and Haul DQ CY 1,480 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (Aggregate Base Course) DQ CY 840 $ $
322640-1
Pavement Markings - Aircraft Taxi Lines 6" Solid Yellow Reflective with 6" Solid Black Non Reflective both sides DQ LF 720 $ $
ENGINEER'S ESTIMATE
McCALL APRON REPLACEMENT PROJECT
REDESIGN SUBMITTAL (6/25/2019)
Base Bid (Aircraft Apron Asphalt Parking)
Total Base
Optional Bid Item A - (Apron Asphalt -North)
Solicitation No.: 120126119R0010
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY Use Unit Price TOTAL
ENGINEER'S ESTIMATE
McCALL APRON REPLACEMENT PROJECT
REDESIGN SUBMITTAL (6/25/2019)
322640-2 Pavement Markings - Aircraft Taxi Parking Lines 4" Solid Yellow DQ LF 520 $ $
322640-3 Pavement Markings - Aircraft Taxi Parking Lines 4" Solid White DQ LF 280 $ $
322706-1 Pulverize Asphalt Pavement and Existing Base Coarse 8" deep DQ SY 4,583 $ $
010250 Construction Staking LSQ LS 1 $ $
321200 Hot Mix Asphalt Pavement (Airfield) CREDIT DQ Ton 82 -$ -$
321311-2 Aircraft Tie-Downs (Concrete) AQ EA 3 $ $
321311-3 Aircraft Tie-Downs (Asphalt) CREDIT AQ EA 3 -$ -$
321311-1 Miscellaneous Cast in place concrete (Light Aircraft Section) DQ CY 50 $ $
312100-2 Excavation and Haul DQ CY 175 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (Aggregate Base Course) DQ CY 100 $ $
321204-2 Crushed Aggregate Base Course (Imported Materials) - Frost Free Materials DQ CY 117 $ $
010250 Construction Staking LSQ LS 1 $ $
321200 Hot Mix Asphalt Pavement (Airfield) CREDIT DQ Ton 717 -$ -$
321311-2 Aircraft Tie-Downs (Concrete) AQ EA 9 $ $
321311-3 Aircraft Tie-Downs (Asphalt) CREDIT AQ EA 9 -$ -$
321311-1 Miscellaneous Cast in place concrete (Light Aircraft Section) DQ CY 439 $ $
312100-2 Excavation and Haul DQ CY 1,537 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (Aggregate Base Course) DQ CY 878 $ $
321204-2 Crushed Aggregate Base Course (Imported Materials) - Frost Free Materials DQ CY 1,025 $ $
010250 Construction Staking LSQ LS 1 $ $
033545-1 Concrete Valley Gutter DQ LF 531 $ $
Total Optional Bid Item A
Optional Bid Item B - (Aircraft Concrete Parking Pads - EACH)
Total Optional Bid Item B
Optional Bid Item C - (Aircraft Concrete Parking Area)
Total Optional Bid Item C
Optional Bid Item D (Helipad Pavement)
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY Use Unit Price TOTAL
ENGINEER'S ESTIMATE
McCALL APRON REPLACEMENT PROJECT
REDESIGN SUBMITTAL (6/25/2019)
312100-1 Project Site Preparation and Grading LSQ LS 1 $ $
321200-2 Hot Mix Asphalt Pavement DQ Ton 650 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" DQ CY 690 $ $
321204-2 Crushed Aggregate Base Course - Grading "G" OR Pulverized Asphalt (For Pathway) DQ CY 10 $ $
332228-2 Culvert - 12-inch PVC (Storm Drainage) DQ LF 535 $ $
332228-3 Inlet and Outlet Structures - Storm Water System LSQ LS 4 $ $
010250 Construction Staking LSQ LS 1 $ $
101400-2 Regulatory Signs - Aluminum on Galv. Steel Tube Posts AQ EA 1 $ $
312100-1 Project Site Preparation and Grading LSQ LS 1 $ $
321200-2 Hot Mix Asphalt Pavement DQ Ton 160 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (For Under Roadways) DQ CY 180 $ $
321204-2 Crushed Aggregate Base Course - Grading "G" OR Pulverized Asphalt (For Pathway) DQ CY 10 $ $
332228-1 Culvert - 12-inch Galv. Corrugated Metal Pipe (16 Gauge, 2 2/3"x1/2" Corrugations) AQ LF 60 $ $
323113-4 Pedestrian Gate - 5 Foot Wide Opening AQ EA 1 $ $
322640-4 Pavement Markings - Parking Stall Lines 4" Solid Yellow Non Reflective DQ LF 260 $ $
010250 Construction Staking LSQ LS 1 $ $
321200-2 Hot Mix Asphalt Pavement DQ Ton 30 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (For Under Roadways) DQ CY 30 $ $
322640-4 Pavement Markings - Parking Stall Lines 4" Solid Yellow Non Reflective DQ LF 200 $ $
Optional Bid Item E (Overflow Parking)
Total Optional Bid Item E
Optional Bid Item F (Helibase Parking)
Total Optional Bid Item F
Total Optional Bid Item D
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY Use Unit Price TOTAL
ENGINEER'S ESTIMATE
McCALL APRON REPLACEMENT PROJECT REDESIGN
SUBMITTAL (6/25/2019)
Optional Bid Item G (North Smokejumper
Access) ss)
010250 Construction Staking LSQ LS 1 $ $
026460-1 Dumpster Pad and Screen Enclosure AQ EA 1 $ $
101400-2 Regulatory Signs - Aluminum on Galv. Steel Tube Posts AQ EA 1 $ $
312100-1 Project Site Preparation and Grading LSQ LS 1 $ $
321200-2 Hot Mix Asphalt Pavement DQ Ton 140 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (For Under Roadways) DQ CY 160 $ $
322640-4 Pavement Markings - Parking Stall Lines 4" Solid Yellow Non Reflective DQ LF 160 $ $
322706-1 Pulverize Asphalt Pavement DQ SY 832 $ $
323113-3 Manual Slide Gate - 20 Foot Wide Opening AQ EA 1 $ $
332228-1 Culvert - 12-inch Galv. Corrugated Metal Pipe (16 Gauge, 2 2/3"x1/2" Corrugations) AQ LF 40 $ $
010250 Construction Staking LSQ LS 1 $ $
033545-2 Concrete Sidewalk DQ SF 440 $ $
101400-2 Regulatory Signs - Aluminum on Galv. Steel Tube Posts AQ EA 2 $ $
321200-2 Hot Mix Asphalt Pavement DQ Ton 380 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (For Under Roadways) DQ CY 400 $ $
322640-4 Pavement Markings - Parking Stall Lines 4" Solid Yellow Non Reflective DQ LF 660 $ $
322706-1 Pulverize Asphalt Pavement DQ SY 2,304 $ $
322640-5 Pavement Markings - Accessible Parking Symbol AQ EA 1 $ $
332228-1 Culvert - 12-inch Galv. Corrugated Metal Pipe (16 Gauge, 2 2/3"x1/2" Corrugations) AQ LF 180 $ $
010250 Construction Staking LSQ LS 1 $ $
101400-2 Regulatory Signs - Aluminum on Galv. Steel Tube Posts AQ EA 3 $ $
312100-1 Project Site Preparation and Grading LSQ LS 1 $ $
Total Optional Bid Item G
Optional Bid Item H (Airtanker Base Parking Area and Retardant Area)
Total Optional Bid Item H
Optional Bid Item I (North Access Road)
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY Use Unit Price TOTAL
ENGINEER'S ESTIMATE
McCALL APRON REPLACEMENT PROJECT
REDESIGN SUBMITTAL (6/25/2019)
321200-2 Hot Mix Asphalt Pavement DQ Ton 50 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (For Under Roadways) DQ CY 60 $ $
321204-2 Crushed Aggregate Base Course - Grading "A" (For Under Roadways) DQ CY 60 $ $
323113-3 Manual Slide Gate - 20 Foot Wide Opening AQ EA 1 $ $
322640-4 Pavement Markings - Parking Stall Lines 6" Solid White Non Reflective DQ LF 70 $ $
332228-1 Culvert - 12-inch Galv. Corrugated Metal Pipe (16 Gauge, 2 2/3"x1/2" Corrugations) AQ LF 40 $ $
010250 Construction Staking LSQ LS 1 $
101400-2 Regulatory Signs - Aluminum on Galv. Steel Tube Posts AQ EA 5 $ $
321200-2 Hot Mix Asphalt Pavement DQ Ton 890 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" (For Under Roadways) DQ CY 950 $ $
322640-4 Pavement Markings - Parking Stall Lines 4" Solid Yellow Non Reflective DQ LF 1,500 $ $
322706-1 Pulverize Asphalt Pavement DQ SY 4,938 $ $
322640-5 Pavement Markings - Accessible Parking Symbol AQ EA 4 $ $
332228-1 Culvert - 12-inch Galv. Corrugated Metal Pipe (16 Gauge, 2 2/3"x1/2" Corrugations) AQ LF 120 $ $
010250 Construction Staking LSQ LS 1 $ $
323113-1 Chain Link Fence DQ LF 1,283 $ $
323113-2 Chain Link Fence - (10 ft Wildlife Fence) DQ LF 650 $ $
323113-2 Manual Slide Gate - 20 Foot Wide Opening AQ EA 2 $ $
323113-3 Manual Slide Gate - 10 Foot Wide Opening AQ EA 1 $ $
323113-3 Swing Gate - 20 Foot Wide Opening AQ EA 1 $ $
323113-4 Vertical Pivot Gate - 18 Foot Wide Opening AQ EA 1 $ $
323113-5 Pedestrian Gate - 5 Foot Wide Opening AQ EA 3 $ $
321713 Bollards AQ EA 8 $ $
Optional Bid Item K (Gates and Fencing)
Optional Bid Item J (Smokejumper Base Parking Area)
Total Optional Bid Item J
Total Optional Bid Item I
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY Use Unit Price TOTAL
ENGINEER'S ESTIMATE
McCALL APRON REPLACEMENT PROJECT
REDESIGN SUBMITTAL (6/25/2019)
010250 Construction Staking LSQ LS 1 $ $
033545-1 Concrete Valley Gutter DQ LF 170 $ $
033545-2 Concrete Vertical Curb DQ LF 192 $ $
033545-3 6" Thick Concrete Pavement DQ SF 2,048 $ $
321204-1 Crushed Aggregate Base Course - Grading "C" DQ CY 70 $ $
321200-1 Hot Mix Asphalt Pavement DQ Ton 20 $ $
Total Optional Bid Item K
Optional Bid Item L (Fuel Containment Basin)
Total Optional Bid Item L
Total Base Bid & Options -
SECTION C - Description/specifications/Statement of Work Clauses SECTION E - Inspection and Acceptance Clauses SECTION F - Deliveries or Performance Clauses SECTION H - Special Contract Requirements Clauses SECTION I - Contract Clauses Clauses SECTION J - List of Documents, Exhibits, and Other Attachments List of Documents, Exhibits, and Other Attachments SECTION K - Representations, Certifications, and Other Statements of Offerors Clauses L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents Clauses SECTION M - Evaluation Factors for Award Clauses
SECTION C - Description/specifications/Statement of Work
Clauses 452.211-72 Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
(End of Clause)
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
(End of Clause)
SECTION E - INSPECTION AND ACCEPTANCE
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction (AUG 1996)
PART I - THE SCHEDULE
SECTION F - DELIVERIES OR PERFORMANCE
52.242-14 Suspension of Work (APR 1984)
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to
(a) commence work under this contract within 10 Days calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 120 days after notice to proceed received. The time stated for completion shall include final cleanup of the premises.
(End of clause)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
Clauses AGAR 452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Contracting Representative and Forman.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
Use of Premises
The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in such a manner as not to interrupt or interfere with the conduct of Government business.
Conformity With Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
Barricades, Warning Signs, and Other Devices
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
Conformity With Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
Local Material Sources
(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.
The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.
When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.
Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.
(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government.
Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.
Samples, Tests, Cited Specifications
Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
Weed-Free Equipment
In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.
Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract.
Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
Invoice Processing Platform (IPP)
The Forest Service is utilizing the Invoice Processing Platform (IPP) for the electronic submission and tracking of contracts/purchase orders, invoices, and payment information. IPP is a secure Government-wide, Web-based invoice processing service. Visit http://www.ipp.gov to learn more.
Upon award of a contract, Contractors must register at https://www.ipp.gov/vendors/enrollment-vendors.htm.
Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted.
Prework Conference
Prior to commencement of work, the Contracting Officer will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be developed and established in writing.
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEPT 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of
Whistleblower Rights (APR 2014) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements. (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Jul 2018) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (OCT 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records - Negotiation (OCT 2010) 52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-9 Small Business Subcontracting Plan (Aug 2018) 52.219-14 Limitations on Subcontracting (Jan 2017) 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination--Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification.(OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) 52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate I (JULY 1995) 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance -- Work on a Government Installation (Jan 1997) 52.228-11 Pledges of Assets (AUG 2018) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds-Construction (OCT 2010) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) Alternate I (DEC 1991) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-1 Performance of Work by the Contractor (Apr 1984) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-5 Payments to Small Business Subcontractors (JAN 2017) 52.242-13 Bankruptcy (JULY 1995) 52.242-14 Suspension of Work (APR 1984) 52.243-4 Changes (JUNE 2007) 52.244-6 Subcontracts for Commercial Items (JAN 2019)
52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I (SEPT
1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (Jan 1991) 452.228-71 Insurance Coverage (NOV 1996) Alternate I (NOV 1996) 452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) 452.236-72 Use of Premises. (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response. (NOV 1996)
CLAUSES INCORPORATED BY FULL TEXT
52.217-8 -- Option to Extend Services (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 10 before the contract expires.
(End of Clause)
52.217-9 -- Option to Extend the Term of the Contract (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 10 before the contract expires.; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 1 year.
(End of Clause)
52.222-35 -- Equal Opportunity for Veterans (Oct 2015)
(a) Definitions. As used in this clause--
“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at
FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.
(End of Clause)
52.222-36 – Equal Opportunity for Workers With Disabilities (Jul 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of Clause)
52.225-9 Buy American--Construction Materials (MAY 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C 40102(4), such as agricultural products and petroleum products.
"Component" means any article, material, or supply incorporated directly into construction materials.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means--
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
Item 2: _______ _______ _______
Foreign construction material _______ _______ _______
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(End of Clause)
52.228-1 Bid Guarantee (SEPT 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Clause)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulations https://www.acquisition.gov/far
Agriculture Acquisition Regulations http://www.dm.usda.gov/procurement/policy/agar.htm
(End of Clause)
Order of Precedence - Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(a) The Schedule (excluding the Specifications) (Sections A-H).
(b) The representations and other instructions (Sections K and L).
(c) Contract clauses (Section I).
(d) Special Project Specifications.
(e)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.