Attach_2_McCall.Apron.Replacement.DWG_Final_7.12.2019-signed.pdf

PDF 39 MB Posted

Attached to
McCall Air Base Apron Replacement-Payette NF Federal contract opportunity
Solicitation number
12026119R0010
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Attach_2_Drawings

View the file

Other files for this federal contract opportunity

Other files attached to McCall Air Base Apron Replacement-Payette NF, newest first.
File Type Posted
McCall_Air_Base_Tarmac_Replacement_Project_Questions_(8.12.pdf PDF
Amendment__1.pdf PDF
G2.revised.8.1.2019.pdf PDF
S2.revised.8.1.2019.pdf PDF
McCall_Air_Base_Tarmac_Replacement_Project_Questions_(8.1.19).docx DOCX document
McCall.Apron.Replacement.Schedule._Items.Final.7.16.2019.pdf PDF
Attach_1_McCall_Apron_specs_FINAL.7.15.pdf PDF
Attach_5_Past_Performance_Questionnaire.pdf PDF
Attach_4_DETERMINATION_OF_RESPONSIBILITY_LETTER.doc DOC document
Attach__3_Wage_Determination.pdf PDF
Attach_4_DETERMINATION_OF_RESPONSIBILITY_LETTER.pdf PDF
R0010.pdf PDF
Attach_6_Workman's_comp_sheet_with_link.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA

United States Department of Agriculture Forest Service

R04 INTERMOUNTAIN REGION

PAYETTE NATIONAL FOREST

VALLEY COUNTY

IDAHO

McCALL AIRBASE APRON

REPLACEMENT PROJECT

VICINITY MAP

TRAVEL DIRECTIONS:

605 S. Mission St, McCall, Idaho, 83638

INDEX OF SHEETS

SHEET SHEET TITLE PAGE

G1

G2 so

S1

S2

S3

S4

S5

S6

S7

SB

S9

S10

S11

S12

S13

S14

S15

S16

S17

TITLE SHEET

SCHEDULE OF ITEMS

GENERAL NOTES AND

LEGEND

EXISTING SITE AND SURVEY

CONTROL PLAN

OVERALL SITE PLAN 5

APRON REPLACEMENT BASE

SITE PLAN

NORTH APRON ASPHALT SITE

PLAN

OPTIONAL CONCRETE

PARKING PLAN

APRON GRADING PLAN

APRON STRIPING AND

SIGNAGE PLAN

STORM DRAINAGE SYSTEM

PLAN

FUEL CONTAINMENT BASIN

AND HELIBASE PARKING

SECURITY FENCING AND

GATES

HELIPAD PAVEMENT

OVERFLOW PARKING

NORTH SMOKEJUMPER

ACCESS

AIRTANKER BASE PARKING

NORTH ACCESS ROAD

AIRTANKER RETARDANT

AREA

SMOKEJUMPER BASE

PARKING AREA

D4

FENCE AND GATE DETAILS 21

AUTOMATIC PIVOT GATE

DETAILS

SECURITY FENCE WITH

WILDLIFE DETERRENT

DETAILS

PAVEMENT SECTIONS

ACCESSIBLE PARKING

STRIPING, PATH, SWALE AND 25

BOLLARD DETAILS

DUMPSTER PAD AND WHEEL

STOP DETAILS

ROAD AND ASPHALT

PARKING DETAILS

SIGN LIST AND INSTALLATION

DETAILS

FREE ZONE BOUNDARY

DETAILS

APRON PAVEMENT SECTIONS 30

CONSTRUCTION JOINT

DETAILS

CONSTRUCTION JOINT

DETAILS CONT.

CONSTRUCTION JOINT

DETAILS CONT.

AIRCRAFT PARKING STRIPING 34

STORM DRAINAGE SYSTEM

DETAILS

TYPICAL TRENCH, PIPE

BEDDING AND PAVEMENT

PATCH DETAILS

CMP CULVERT AND

INSTALLATION DETAILS

RECOMMENDED BY:

FOREST ENGINEER

FOREST SUPE VISOR

ENGINEERING

,/it/to

DATE

07/1�

DATE

SHEET 01 OF 37

Attachment #2-12026119R0010 s/s Kim Martin 7/12/19

File details come from the government source that posted it.