Amendment 001.pdf

PDF 1 MB Posted

Attached to
Margaret Bay Restoration Road Maintenance
Solicitation number
12010920Q0059
Issued by

View the file

Other files

File Type Posted
Amendment 003.pdf PDF
Amendment 002.pdf PDF
Relevant Experience Evaluation Form.pdf PDF
Construction Wage Determination.pdf PDF
12010920Q0059.pdf PDF
Maps.docx DOCX document
Work List.docx DOCX document
SF24-16d Bid Bond Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12010920Q0059 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

JUNEAU AK 99802

709 WEST 9TH STREET

ALASKA REGIONAL OFFICE

05/14/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/11/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Margaret Restoration Access

The purpose of this Amendment is to:

1) Extend the due date to 5/26/2020 to remove conflict with a holiday, and;

2) Attach missing pieces of information related to drawings, specifications, and erosion conditions.

This Amendment also clarifies that the Government is not accepting alternate products to the log culvert (i.e. plastic or metal pipes) because some of the drainages are fish streams, and fish pipe design is outside the scope of this project.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 47

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12010920Q0059/0001

Period of Performance: 06/01/2020 to 09/30/2020

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

2%

2%

3-5%

DESIGN ROADWAY WIDTH

EXISTING GROUND

RECONDITIONED SUBGRADE

COMPACTED DEPTH AGGREGATE LIFT

EXISTING

DESIGN ROADWAY WIDTH

EXISTING GROUND

RECONDITIONED SUBGRADE

COMPACTED DEPTH AGGREGATE LIFT

TYPICAL OVERLAY SECTION - CROWNED

OUTSLOPED SECTION

INSLOPED SECTION

SEE NOTE

NOTE: IN THOSE AREAS WHERE THE EXISTING ROAD, AFTER

RECONDITIONING IS WIDER THAN THE DESIGNED WIDTH OF

AGGREGATE, CENTER THE LIFT OF AGGREGATE ON ROAD

SURFACE AND FEATHER TO EXISTING SHOULDERS. WHEN

PLACING THE ADDITIONAL XXXX WIDTH OF AGGREGATE IN

TURNOUT AREAS AND SECTIONS REQUIRING CURVE

WIDENING, PLACE ADJACENT TO CENTERLINE LIFT AND

COMPACT TOGETHER.

NOTE: OUTSLOPED ROADS SHOULD BE USED WHEN ROAD

GRADES ARE GENTLE TO MODERATE (0% TO 8%) AND WHERE

CUTSLOPES ARE DRY. OUTSLOPED ROADS SHOULD BE

CONSTRUCTED WITH ROLLING DIPS FOR DRAINAGE. THERE

SHOULD BE NO DITCH ON THE INBOARD SIDE OF THE

OUTSLOPED ROAD.

NOTE: INSLOPED ROADS SHOULD BE USED WHEN ROAD

GRADES ARE MODERATE TO STEEP (6% AND UP) AND WHERE

TERRAIN MAY BE STEEP OR SLIPPERY. INSLOPED ROADS

ARE ALSO IDEAL FOR HIGHLY ERODIBLE AREAS. EXTRA

ATTENTION SHOULD BE PAID TO ESTABLISHING DITCHES AND

DRAINAGE FOR INSLOPED ROADS.

3-5%

DESIGN ROADWAY WIDTH

EXISTING GROUND

RECONDITIONED SUBGRADE

COMPACTED DEPTH AGGREGATE LIFT

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/1 2/2

0 1 1:

R

JA

CO

BS

ON

F :\W

OR

KS

PA

CE

\K

MR

D\

MA

RG

AR

ET

\C

ON

TR

AC

T\

KM

RD

M

AR

GA

RE

T

RO

AD

R

ES

TO

RA

TI

ON

.D

W G;

R10

ALASKA REGION

Margaret Restoration Access

TONGASS NATIONAL

FOREST

KETCHIKAN MISTY FJORDS

RANGER DISTRICT

OVERLAY

ROAD SHAPE

Nov 2019

Rev 1

TNF

K. CHERRY

TNF ENG

C-01

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

EXISTING GROUND

3' ROADBED WIDTH 5' MIN

VARIABLE SLOPE AS

DESIGNATED/STAKED

DECK MERCHANTABLE TIMBER

LIMBS, TOPS, SLASH,

CULL LOGS AND

ROADWAY EXCAVATION

EXCESS TO DEBRIS MAT

OR BENCH REQUIREMENTS

BORROW AND/OR SUITABLE ROCK EXCAVATION

PREPARED GROUND SURFACE, DEBRIS MAT

EMBANKMENT: BORROW EXCAVATION TO BE USED ONLY

AFTER ALL AVAILABLE SUITABLE EXCAVATION,

CONSTRUCTION SLASH AND DEBRIS HAS BEEN UTILIZED

2' MIN

NOTE: STUMPS SHALL BE GRUBBED AND

CONSTRUCTION SLASH/DEBRIS REMOVED AT

A MINIMUM OF 5' FROM THE CONSTRUCTION

ROAD SHOULDER

TYPICAL SIDEHILL SECTION

EXCAVATION

SUBGRADE

2' MIN

10' 5' MIN

VARIABLE CLEARING LIMITS

CLEARING, UNDISTURBED STUMPS

AND CLEARING DEBRIS, SEE NOTE 3

SUBGRADE

BORROW

TYPICAL OVERLAY SECTION

GRUBBING LIMITS 5' MIN

VARIABLE CLEARING LIMITS

ORIGINAL GROUND

VARIABLE SLOPE AS

DESIGNED/STAKED

EXCAVATION

PREPARED GROUND SURFACE,

DEBRIS MAT OR BENCH

EMBANKMENT, VARIABLE DEPTH

ROCK MATERIAL, BORROW AND/OR

SUITABLE ROCK EXCAVATION

EXCESS EXCAVATED

MATERIAL

DECK MERCHANTABLE

TIMBER TYP

TYPICAL THROUGH CUT SECTION

50' 25'

8'

R

T

O

INTERSECTION DETAILS

NOTES

1. PROFILE ELEVATIONS ARE SHOWN TO SUBGRADE.

2. CROWN TRAVELED WAY OR ROADBED 2%.

3. UNDISTURBED STUMPS AND OTHER CLEARING DEBRIS IN EMBANKMENT

AREAS MAY BE LEFT IN PLACE IF THEY DO NOT EXTEND CLOSER THAN 24"

TO ANY SUBGRADE. (REFERENCE SPEC. 201.05B)

4. UNLESS OTHERWISE INDICATED OR STAKED, ALL FILL SLOPES SHALL BE

1:1.25 AND ALL CUT SLOPES SHALL BE 1:1 OR AS SHOWN IN THE STAKING

NOTES.

5. ROAD NO. STA. TO STA. TOLERANCE CLASS FINISH METHOD

XXXX XXXX TO XXXX XXXX XXXX

XXXX XXXX TO XXXX XXXX XXXX

XXXX XXXX TO XXXX XXXX XXXX

XXXX XXXX TO XXXX XXXX XXXX

XXXX XXXX TO XXXX XXXX XXXX

XXXX XXXX TO XXXX XXXX XXXX

XXXX XXXX TO XXXX XXXX XXXX

XXXX XXXX TO XXXX XXXX XXXX

20'

16'

25' 30' 25'

25' 50' 25'

25' 50' 25'

50' 80' 50'

ROAD DESIGN SPEED = 10 MPH

ROAD DESIGN SPEED = 20 MPH

ROAD DESIGN SPEED = 30 MPH

10' TYP

5' TYP

TURNOUT/PULLOUT DETAILS

16'

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/1 2/2

0 1 1:

R

JA

CO

BS

ON

F :\W

OR

KS

PA

CE

\K

MR

D\

MA

RG

AR

ET

\C

ON

TR

AC

T\

KM

RD

M

AR

GA

RE

T

RO

AD

R

ES

TO

RA

TI

ON

.D

W G;

R10

ALASKA REGION

Margaret Restoration Access

TONGASS NATIONAL

FOREST

KETCHIKAN MISTY FJORDS

RANGER DISTRICT

TYPICAL

CROSS-SECTION

Nov 2019

Rev 1

TNF

K. CHERRY

TNF ENG

C-02

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

PLACE LOG STRINGERS BUTT TO TIP. PENETRATING

FASTENERS or CLAMPS (6" MIN. EMBEDMENT LENGTH) MAY

BE USED UNLESS OTHERWISE INDICATED IN WRITING BY THE

C.O.

LASH AT THESE LOCATIONS

ABUTMENTS and THIRD POINTS ABUTMENTS and MIDSPAN

LASHING REQUIREMENTS

and QUARTER POINTS

ABUTMENTS, CENTER,

FOR SPANS

20-FT to 36-FT

UNDER 20-FT

OVER 36-FT

MATERIAL NOTES:

DIAMETERS ARE GIVEN IN INCHES, REPRESENTING

AVERAGE MIDSPAN DIAMETERS INSIDE BARK. REQUIRED

DIAMETERS WILL VARY WITH DEPTH OF ROCK SURFACING.

DEPTHS OF ROCK USED TO CALCULATE THIS TABLE ARE:

SPANS TO 20 FEET = 12 INCH ROCK

SPANS 20 FEET TO 36 FEET = 9 INCH ROCK

SPANS OVER 36 FEET = 6 INCH ROCK

LOGS TO BE STRAIGHT, SOUND, AND FREE OF DECAY,

EXCESSIVE TWIST (SPIRAL GRAIN MORE THAN 1 in 8) AND

ALL DEFECTS THAT MAY CONSIDERABLY AFFECT STRENGTH.

KNOT SIZE IN THE MIDDLE HALF OF THE LENGTH NOT TO

EXCEED 5". DO NOT USE STRINGERS w/ LARGE KNOTS

OPPOSITE EACH OTHER.

ROCK IN SHOT ROCK SURFACING TO BE SMALLER THAN

1/2 THE SURFACING DEPTH.

4.

3.

2.

1.

CONSTRUCTION NOTES:

CONSTRUCT BRIDGE TO ELEVATIONS AND ALIGNMENTS SHOWN ON THE DRAWINGS or STAKED ON THE GROUND.

UNLESS OTHERWISE REQUIRED, USE A SINGLE MUDSILL AT EACH ABUTMENT. PLACE MUDSILL ON SHOT ROCK

OR FIRM NATIVE MATERIAL AS DIRECTED BY THE C.O.

PLACEMENT OF RIPRAP or OTHER INSTREAM WORK IS NOT ALLOWED UNLESS APPROVED IN WRITING IN ADVANCE BY THE C.O.

INSTREAM WORK or EQUIPMENT CROSSINGS ARE NORMALLY ALLOWED ONLY AS SHOWN ON THE PLAN DRAWINGS.

EQUIPMENT CROSSINGS MUST BE APPROVED IN WRITING BY THE C.O.

BRIDGE REMOVAL SHALL BE ACCOMPLISHED AS FOLLOWS:

REMOVE SHOT ROCK FROM BRIDGE DECK USING BACKHOE AND HAND TOOLS.

LAY BACK FILLS FACING THE STREAM TO A 1 (vertical) to 1-1/2 (horizontal) (max) SLOPE.

INDIVIDUALLY LIFT EACH STRINGER LOG WITHOUT CAUSING STREAM DISTRUBANCE.

PLACE LOGS IN DESIGNATED DECKING AREA. REMOVE DRIVEABLE SIDE(S) MUDSILL LOG(S).

BLOCK CROSSING AT DRIVEABLE END(S) WITH A TANK TRAP OR OTHER METHOD APPROVED BY THE C.O.

SEED AND FERTILIZE ALL DISTRUBED AREAS.

c)

e) d)

a) b)

5.

4.

2.

3.

1.

VEHICLE TYPESPAN

U54

LENGTH

(FEET) HS20 U80 U102

APPROX. STRINGER DIAMETER

(INCHES)

SITKA SPRUCE

FOR HEMLOCK USE 1 INCH SMALLER DIAMETER

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/1 2/2

0 1 1:

R

JA

CO

BS

ON

F :\W

OR

KS

PA

CE

\K

MR

D\

MA

RG

AR

ET

\C

ON

TR

AC

T\

KM

RD

M

AR

GA

RE

T

RO

AD

R

ES

TO

RA

TI

ON

.D

W G;

R10

ALASKA REGION

Margaret Restoration Access

TONGASS NATIONAL

FOREST

KETCHIKAN MISTY FJORDS

RANGER DISTRICT

LOG STRINGER

BRIDGE

Nov 2019

Rev 1

TNF

K. CHERRY

TNF ENG

C-03

AutoCAD SHX Text

MUDSILL MUST BE LONG ENOUGH TO CONTAIN FILL

AutoCAD SHX Text

TOE OF FILL

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

TRAVELED WAY WIDTH

AutoCAD SHX Text

LOG STRINGER

AutoCAD SHX Text

WIRE ROPE

AutoCAD SHX Text

MUDSILL LOG

AutoCAD SHX Text

SHOT ROCK FILL

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text PLACE RIPRAP IF REQUIRED BY THE CO OR SHOWN ON THE DRAWINGS. SEE CONSTRUCTION NOTE 3 FOR NECESSARY IN-STREAM WORK

AutoCAD SHX Text

PROVIDE CLEARANCE FOR ICE & DEBRIS AS DETERMINED BY THE CO

AutoCAD SHX Text

BRIDGE GRADE 1/2% (MIN.) TO 5% (MAX.)

AutoCAD SHX Text

SHOT ROCK FILL - SEE MATERIAL NOTE 1 FOR DEPTH

AutoCAD SHX Text

TYPE II-A SEPARATION GEOTEXTILE

AutoCAD SHX Text

BROW LOG

AutoCAD SHX Text

POLES FOR CHINKING BETWEEN STRINGERS

AutoCAD SHX Text

LASH STRINGERS & BROW LOGS TOGETHER W/ 3/4" WIRE ROPE

AutoCAD SHX Text

LOG STRINGERS - SEE TABLE FOR SIZE

AutoCAD SHX Text

28" MAX

AutoCAD SHX Text

BROW LOG

AutoCAD SHX Text 23"

AutoCAD SHX Text 21"

AutoCAD SHX Text 19"

AutoCAD SHX Text 18"

AutoCAD SHX Text 20'

AutoCAD SHX Text 34"

AutoCAD SHX Text 34"

AutoCAD SHX Text 30"

AutoCAD SHX Text 28"

AutoCAD SHX Text 50'

AutoCAD SHX Text 34"

AutoCAD SHX Text 32"

AutoCAD SHX Text 55'

AutoCAD SHX Text 60'

AutoCAD SHX Text 30"

AutoCAD SHX Text 32"

AutoCAD SHX Text 36"

AutoCAD SHX Text 38"

AutoCAD SHX Text 36"

AutoCAD SHX Text 38"

AutoCAD SHX Text 22"

AutoCAD SHX Text 24"

AutoCAD SHX Text 20"

AutoCAD SHX Text 28"

AutoCAD SHX Text 26"

AutoCAD SHX Text 23"

AutoCAD SHX Text 35'

AutoCAD SHX Text 45'

AutoCAD SHX Text 40'

AutoCAD SHX Text 27"

AutoCAD SHX Text 24"

AutoCAD SHX Text 30'

AutoCAD SHX Text 25'

AutoCAD SHX Text 21"

AutoCAD SHX Text 19"

AutoCAD SHX Text 29"

AutoCAD SHX Text 27"

AutoCAD SHX Text 32"

AutoCAD SHX Text 29"

AutoCAD SHX Text 33"

AutoCAD SHX Text 31"

AutoCAD SHX Text 25"

AutoCAD SHX Text 22"

AutoCAD SHX Text 27"

AutoCAD SHX Text 25"

AutoCAD SHX Text 18"

AutoCAD SHX Text 18"

AutoCAD SHX Text 10'

AutoCAD SHX Text 15'

AutoCAD SHX Text 18"

AutoCAD SHX Text 18"

AutoCAD SHX Text 18"

AutoCAD SHX Text 19"

AutoCAD SHX Text 18"

AutoCAD SHX Text 21"

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

1. CULVERT LENGTHS, AS SHOWN ON THE PLANS, ARE APPROXIMATE

AND ARE SUBJECT TO REVISION BY THE ENGINEER.

2. MINIMUM LOG CULVERT SPAN SHALL BE GREATER THAN OUTSIDE

BANKFULL WIDTH. SPAN MEASURED FROM THE INSIDE FACE

3. RIP RAP, WHEN DESIGNATED ON THE PLANS, SHALL EXTEND A

MINIMUM OF ONE FOOT BEYOND THE SIDES OF THE CULVERT.

CULVERTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH LINES,

GRADES, AND DIMENSIONS SHOWN ON DRAWINGS AND/OR AS

STAKED ON THE GROUND.

GENERAL NOTES

4. WHEN REBAR IS USED TO CONNECT STRINGERS TO SILL LOG,

A CABLE WRAP AT MIDSPAN WILL BE USED ALONG THE FULL

LENGTH OF THE LOG CULVERT.

5. CABLE WRAPS SHALL BE STAPLED ON EACH STRINGER.

6. DO NOT PLACE EXCESS AND/OR UNSUITABLE MATERIAL EXCAVATED

DURING CULVERT CONSTRUCTION ON THE SLOPES ADJACENT TO

THE STREAM OR IN THE STREAM CHANNEL.

MAXIMUM FILL DEPTHS FOR ROADWAY MATERIAL OVER LOG CULVERT (IN)

MINIMUM

STRINGER Ø

(IN.)

SPAN LENGTH (FT)

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

240 240 240 240 240 240 240 240 240 240 230 196 168 144240

240 240 240 240 240 240 240 240 240 208 172 144 122 102240

240 240 240 240 240 240 240 226 182 146 120 96 78 62240

240 240 240 240 240 240 196 152 116 88 68 50 36 24240

240 240 240 240 240 224 114 80 54 32160

240 240 240 199 146 116 36 0 070

240 150 77 38 18 0 0 0 0 00 0 0 00

28 240 240 240 240 240 240 240 240 240 240 240 240 214 186240

30 240 240 240 240 240 240 240 240 240 240 240 240 240 240240

32 240 240 240 240 240 240 240 240 240 240 240 240 227 197240

0 0 0 00

0 000

TO THE INSIDE FACE OF EACH SILL LOG.

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/1 2/2

0 1 1:

R

JA

CO

BS

ON

F :\W

OR

KS

PA

CE

\K

MR

D\

MA

RG

AR

ET

\C

ON

TR

AC

T\

KM

RD

M

AR

GA

RE

T

RO

AD

R

ES

TO

RA

TI

ON

.D

W G;

R10

ALASKA REGION

Margaret Restoration Access

TONGASS NATIONAL

FOREST

KETCHIKAN MISTY FJORDS

RANGER DISTRICT

TYPICAL LOG

CULVERT DETAILS

Nov 2019

Rev 1

TNF

K. CHERRY

TNF ENG

C-04

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

EMBANKMENT

AutoCAD SHX Text

MIDSPAN CABLE WRAP, 38" CABLE

AutoCAD SHX Text

2' MIN. SILL LOG

AutoCAD SHX Text

SEE NOTE 2

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text

#4 REBAR, 18" TO 24" LONG (DEPENDING ON STRINGER )OR FIGURE-EIGHT CABLE WRAP

AutoCAD SHX Text POLYPROPYLENE FABRIC BLANKET, TYPE II-A SEPARATION GEOTEXTILE PER SECTION 714 FP-03

AutoCAD SHX Text

12" MIN. LOG

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

DOWNHILL LOG TIED INTO BANK TO DIVERT WATER INTO CULVERT

AutoCAD SHX Text

ROAD SURFACE

AutoCAD SHX Text

CULVERT SLOPE 2% GREATER THAN SLOPE OF ROAD. MAXIMUM OF 6%

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text

SILL LOG

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

POLYPROPYLENE FABRIC BLANKET

AutoCAD SHX Text

NOTCH SILL LOG 4" MIN. AT ENDS TO FIT OUTSIDE DECKING LOGS

AutoCAD SHX Text

6" MIN. DECKING LOGS,CABLE-WRAPPED AND CLAMPED

AutoCAD SHX Text FIGURE-EIGHT WRAP DECKING LOGS AT ENDS OF CULVERT W/ " MIN. CABLE 38" MIN. CABLE TO AT LEAST A POINT VERTICALLY BELOW THE SHOULDER OF THE ROADWAY

AutoCAD SHX Text

12" MIN. LOG

AutoCAD SHX Text

24" MIN. SILL LOG

AutoCAD SHX Text RIPRAP CULVERTS THAT SPILL ONTO SIDE SLOPES BELOW OUTLET, RIP RAP SIZE AS APPROVED BY THE CO; MINIMUM CLASS II

AutoCAD SHX Text

SLOPE 2% GREATER THAN TRAVELED WAY; MAX 6%

AutoCAD SHX Text

SLOPE 2% GREATER THAN TRAVELED WAY; MAX 6%

AutoCAD SHX Text

VARIABLE SLOPE

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

EXISTING STREAMBED

AutoCAD SHX Text

2' MIN. SILL LOG

AutoCAD SHX Text

CONSTRUCT SLOPE AS STAKED

AutoCAD SHX Text

OUTLET AT STAKED ELEVATION

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

RIPRAP OUTLET WHERE REQUIRED AS APPROVED BY CO

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DOWNGRADE (20% MAX.)

TOE OF EXISTING FILL

EDGE OF EXISTING FILL

BOTTOM OF DITCH

4:1

4:1 3:1

EXCAVATED MATERIAL

CLASS 3 RIPRAP

DOWNGRADE (12% MAX.)

TOE OF EXISTING FILL

EDGE OF EXISTING FILL

6:1

6:1

4:1

EXCAVATED MATERIAL

.7

' TO

.0

TYPE I DRIVEABLE WATERBAR

TYPE II DRIVEABLE WATERBAR

25° 20°

PLAN VIEW

DOWNGRADE (12% MAX.)

CUT SLOPE & DITCH

GENERAL NOTES

MINIMUM GRADE OF WATERBAR CHANNEL SHALL BE 1/2 THE DITCH

GRADE, BOTTOM WIDTH SHALL BE MIN. OF 5 FEET.

1. OLD CULVERTS SHALL BECOME THE PROPERTY OF THE CONTRACTOR

AND SHALL BE REMOVED FROM GOVERNMENT PROPERTY FOR DISPOSAL.

2. EXCAVATED MATERIAL SHALL BE PLACED AS SHOWN ON THE

DRAWINGS. ALL SLOPES SHALL BE CONSTRUCTED AS DRAWN.

3. ALL DISTURBED AREAS SHALL BE SEEDED AND FERTILIZED

AS SPECIFIED IN THE CONTRACT.

4. MATERIAL WHICH CAN NOT BE PLACED ON THE ROADWAY SHALL BE

LOADED, HAULED, AND DISPOSED OF AS SHOWN ON THE DRAWINGS OR

DIRECTED BY THE C.O.

5. OBSTRUCTED DITCH LINES SHALL BE CLEANED TO A MIN. DEPTH OF

20 INCHES, AND CROSS SLOPES SHALL BE 1:1.5.

6. RIPRAP SHALL BE SORTED FROM EXCAVATED ROADWAY MATERIALS.

EXCAVATE ROAD PRISM 3 FEET OR TO ORIGINAL GROUND.

ON ROADWAY AND IN THE DITCHLINE AGAINST THE CUTBANK (IF ANY)

ONLY.

A DITCHBLOCK SHALL BE CREATED BY PLACING EXCAVATED MATERIAL

AT THE SAME OVERALL HEIGHT ON THE DOWNGRADE SIDE OF WATERBAR

5' MIN.

5' MIN.

SKEW ANGLE OF WATERBAR SHALL BE BETWEEN 20° AND 45°

AS SPECIFIED IN THE PLANS OR DESIGNATED BY THE ENGINEER.

PURPOSE: FOR NORMAL TO HIGH CLEARANCE VEHICLE. USE TO REMOVE ROAD SURFACE

WATER ACCUMULATION AND TO PROVIDE AN OVERFLOW CHANNEL IN CASE A CULVERT

BECOMES PLUGGED. THIS WATERBAR IS NOT TO BE USED WHERE ROAD GRADES EXCEED 12%.

PURPOSE: FOR HIGH CLEARANCE VEHICLES ONLY. USE TO MANAGE

WATER FLOW OF ANNUAL CLASS 4 AND CLASS 5 STREAM CROSSINGS

TO PROVIDE DITCH RELIEF FOR SEEPS, SPRINGS OR WHEN REMOVING

CULVERTS. THE DRIVEABLE WATERBAR MUST INTERSECT THE INSIDE

DITCH AND PROVIDE A DITCHBLOCK. THE WATERBAR BOTTOM AND

SIDESLOPES MAY BE ARMORED AND SHALL BE AS WIDE AS THE UP-

STREAM CHANNEL BUT NO LESS THAN 5'.

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/1 2/2

0 1 1:

R

JA

CO

BS

ON

F :\W

OR

KS

PA

CE

\K

MR

D\

MA

RG

AR

ET

\C

ON

TR

AC

T\

KM

RD

M

AR

GA

RE

T

RO

AD

R

ES

TO

RA

TI

ON

.D

W G;

R10

ALASKA REGION

Margaret Restoration Access

TONGASS NATIONAL

FOREST

KETCHIKAN MISTY FJORDS

RANGER DISTRICT

DRIVABLE WATERBAR

May 12, 2020

PROJECT MAP

X.XXX

X.XXX

X.XXX

C-05

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

50' TYP

10' TYP

STRAW BALES, CENTERED IN DITCH LINE

SILT FENCE TYP

DITCH FLOW

PLACE SILT FENCE ALONG WATERWAY

TERMINATE AT END OF CUT TYP

SILT FENCE, SECURE AROUND INLET

TO KEEP DEBRIS OUT OF STREAM

SILT FENCE TYP 50' TYP

FILL SLOPE

EDGE OF ROAD TYP

CENTERLINE OF ROAD

CULVERT

TYPICAL SEDIMENT CONTROL AT CULVERTS

EDGE OF STREAM TYP

DIRECTION

OF FLOW

POST

WOVEN WIRE FENCE FABRIC

GEOTEXTILE FABRIC FILTER CLOTH

SECURE TO TOP OF POSTS

D

IT

C H

F L O

W

2.5'

4'

SECURE EACH BALE WITH

AT LEAST 2 STAKES BURIED

AT MIN 12" DEPTH

BOTTOM OF SILT FENCE BURIED

IN TRENCH MIN 6" DEPTH

TYPICAL SILT FENCE INSTALLATION FOR DITCHES

APPROX 6'

TYPICAL

APPROX 6'

CENTER ON DITCH

135°

STRAW BALES (2)

D

I

T

C

H

F

L

O

W

GEOTEXTILE

APPROX 10' TYP

GEOTEXTILE

WOVEN WIRE FABRIC

POST

TYPICAL SEDIMENT CONTROL AT CULVERTS

ROAD FILL SLOPE

EXISTING

GROUND

GEOTEXTILE FABRIC

BURY BOTTOM EDGE ± 6"

VARIES 5' TO 10'

VARIES 3' TO 5'

BRUSH BARRIER

SEE NOTES

TYPICAL BRUSH BARRIER

NOTES

1. SILT FENCE CONSISTS OF WOVEN WIRE FENCE FABRIC WITH A

MAXIMUM 6" MESH, MINIMUM HEIGHT 30".

2. THE CO MAY REQUIRE ADJUSTMENTS TO ACTUAL LENGTHS OR

LOCATIONS TO FIT FIELD CONDITIONS.

3. INSPECT SILT FENCES AFTER EACH RUNOFF EVENT AND

IMMEDIATELY REPAIR ALL EROSION ALONG EDGES AND BOTTOM.

4. ACCUMULATED DEPTH OF SEDIMENT SHALL NOT EXCEED ONE

HALF OF THE ORIGINAL HEIGHT OF THE SILT FENCE.

5. IN AREAS DESIGNATED FOR BRUSH BARRIERS, LIMIT CLEARING

TO TREES, SHRUBS AND PLANTS LESS THAN 4" IN DIAMETER.

GRUBBING SHALL NOT BE PERFORMED IN THOSE AREAS.

6. BRUSH BARRIER SHALL BE CONSTRUCTED APPROXIMATELY

PARALLEL TO ORIGINAL GROUND CONTOUR. USE

WELL-INTERMINGLED MASS OF BRUSH, TRESS, TRIMMINGS ETC.

BARRIER SHALL BE POROUS ENOUGH TO ALLOW WATER TO

FILTER THROUGH. SECURE BY PLACING MATERIAL (TREES, LOGS

ETC) ON TOP OF AND THROUGHOUT THE BRUSH.

7. ADJOIN BRUSH BARRIER WITH ROADWAY SLOPE ON THE LOW END

AS NEEDED TO CONTAIN SEDIMENTS.

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/1 2/2

0 1 1:

R

JA

CO

BS

ON

F :\W

OR

KS

PA

CE

\K

MR

D\

MA

RG

AR

ET

\C

ON

TR

AC

T\

KM

RD

M

AR

GA

RE

T

RO

AD

R

ES

TO

RA

TI

ON

.D

W G;

R10

ALASKA REGION

Margaret Restoration Access

TONGASS NATIONAL

FOREST

KETCHIKAN MISTY FJORDS

RANGER DISTRICT

EROSION CONTROL

DEVICES

Nov 2019

Rev 1

TNF

K. CHERRY

TNF ENG

C-06

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

NOTES

1. ALL PITS AND QUARRIES SHALL BE APPROVED IN WRITING BY THE CO PRIOR TO

EXPLORATION, CLEARING OR DEVELOPMENT.

2. REMOVE ALL OVERBURDEN TO SOLID ROCK FOR A MINIMUM DISTANCE OF 15' FROM

THE WORKING FACE.

3. SLOPE THE CUT BANK OF THE OVERBURDEN TO THE NATURAL ANGLE OF REPOSE BUT

IN NO CASE STEEPER THAN 1:1.

4. WITHIN THE CLEARING LIMITS:

4.1. MAXIMUM STUMP HEIGHT SHALL BE IN ACCORDANCE WITH SPECIFICATIONS.

4.2. STABLE TREES UP TO 6" (DBH) NEED NOT BE CUT IF THEY WILL NOT INTERFERE

WITH BACK SLOPE STABILITY.

4.3. STUMPS AND BRUSH MAY BE LEFT IN PLACE, EXCEPT THAT ALL STUMPS THAT

PROTRUDE FROM EXCAVATED BANKS OR THAT HAVE THE POTENTIAL TO BECOME

DISLODGED AT ANY LATER DATE SHALL BE REMOVED.

5. DISPOSE OF OR STOCKPILE FOR LATER USE ALL OVERBURDEN, CLEARING,

MERCHANTABLE TIMBER AND GRUBBING DEBRIS AS SHOWN ON THE QUARRY

DEVELOPMENT PLAN.

6. FELL ALL DEAD TREES AND SNAGS WHICH ARE SUFFICIENTLY TALL TO REACH THE

WORK AREA.

7. LEAVE THE PIT/QUARRY IN A NEAT, ORDERLY AND WELL-DRAINED CONDITION.

REMOVE ALL OVERHANGS AND LOOSE ROCK.

8. AFTER EXCAVATION IS COMPLETE CLEAN THE AREA AND LEAVE AS SHOWN ON THE

QUARRY DEVELOPMENT PLAN. TREAT ANY ACCESS ROAD AS SHOWN ON THE QUARRY

DEVELOPMENT PLAN.

9. TEST SHOTS OF 1300 TO 2600 CY ARE REQUIRED AT ALL QUARRY SITES IF DESCRIBED

IN THE SPECIFICATIONS.

10. LEAVE NO MORE THAN 5% BY VOLUME OF OVERSIZE MATERIAL IN THE QUARRY.

BREAK DOWN ANY MATERIAL OVER THIS VOLUME AND USE AS SPECIFIED IN SECTIONS

651.

11. PROVISIONS FOR FUTURE QUARRY DEVELOPMENT ACCESS WILL BE PROVIDED,

UNLESS THIS REQUIREMENT IS WAVED BY THE CO.

12. INSTALL AND MAINTAIN A COMMERCIALLY AVAILABLE RAIN GAUGE MEASURING IN

UNITS OF INCHES AND FRACTIONS OF INCHES IN ACCORDANCE WITH SECTION 205.08.

13. HAUL WILL NOT BE ALLOWED BEYOND DESIGNATED SOURCES UNLESS OTHERWISE

SHOWN ON THE DRAWINGS OR AGREED TO BY THE CO.

14. SEED AND FERTILIZE ALL DISTURBED AREAS SUCH AS OVERBURDEN PILES AND BENCH

SURFACES IN ACCORDANCE WITH SECTION 625.

SAMPLE QUARRY DEVELOPMENT PLAN SAMPLE QUARRY BLASTING PLAN

QUARRY DEVELOPMENT PLAN QUARRY BLASTING PLAN

QUARRY IS LOCATED RIGHT OF STA XX+XX ON ROAD NO. XXXX

ESTIMATE OF VOLUME = XXXX CY

CMP

ROAD NO. XXXX

ACCESS ROAD

STREAM

THIS AREA TO BE CLEARED

ONLY IF OVERBURDEN CANNOT

BE CONTAINED BETWEEN THE

ACCESS ROAD AND ROAD NO.

XXXX

STA XX + XX

TIMBER FROM QUARRY SITE

DECKED IN MUSKEG

CLEARING LIMIT FLAGGED

OVERBURDEN

PLAN VIEW

APPROX

ELEV XXXX

CROSS SECTION VIEW

OBD

OBD

OBD

ELEV XXXX

15' MIN

40'

15' MIN

3% SLOPE

ACCESS

ROAD

ROAD

XXXX

DEVELOPMENT PLAN

1. ALL MERCHANTABLE TIMBER WILL BE REMOVED FROM THE QUARRY SITE AND DECKED IN THE

MUSKEG LEFT OF XX+XX

2. OVERBURDEN WILL NOT BE PLACED IN THE SMALL STREAM BORDERING THE QUARRY.

3. DEVELOPMENT WILL COMPLY WITH THE GENERAL NOTES SHOWN ON THE PIT & QUARRY

DEVELOPMENT TYPICAL SHEET.

4. TEST SHOT OF APPROXIMATELY XXXX CY IS PLANNED.

REHABILITATION PLAN

1. THE ACCESS ROAD WILL BE OBLITERATED BY CUTTING A DITCH AT THE JUNCTION OF THE

ACCESS ROAD WITH ROAD NO. XXXX AND BY ROUGHING UP THE ACCESS ROAD SURFACE.

2. ALL OVERSIZE ROCK WILL BE PLACED AGAINST THE SIDES OF THE QUARRY NEXT TO THE

BACKWALL BENCH.

3. A MINIMUM OF 12" OF OVERBURDEN WILL BE EVENLY SPREAD OVER THE QUARRY FLOOR.

4. ALL DISTURBED AREAS, SUCH AS OVERBURDEN PILES, BENCH SURFACES, AND ACCESS ROAD

SURFACES WILL BE SEEDED AND FERTILIZED IN ACCORDANCE WITH SPECIFICATIONS.

5. PROVISIONS FOR FUTURE QUARRY ACCESS WILL BE PROVIDED UNLESS THIS REQUIREMENT IS

WAIVED BY THE COR.

CONTRACTOR DATE COR DATE DISTRICT RANGER DATE

THIS PLAN IS FOR THE FIRST TEST SHOT IN THE QUARRY

RIGHT OF STA. XX+XX ON ROAD NO. XXXX

STA XX+XX

ROAD NO. XXXX

SECOND

PRODUCTION

SHOT

XXXX CY

FIRST

PRODUCTION

SHOT

XXXX CY

EXISTING

QUARRY

FLOOR

R

O

K

F

A

C

E m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s m s

SEQUENTIAL TIMER

FIRING SEQUENCE - SEQUENCE OF

DELAYS IS THE SAME FOR ALL 5 ROWS

ACTUAL MILLISECOND DELAY USING

SEQUENTIAL TIMER

BOREHOLE SIZE = XX"

HOLE DEPTH = XX' TO XX'

SPACING XX'

STEMMING = XX'

TYPE OF EXPLOSIVES = XX

DENSITY = XX LB/CY

TYPE OF PRIMER & LOCATION IN HOLE = XXXX

TOTAL NUMBER OF HOLES IN SHOT = XX

TOTAL POUNDS OF POWDER IN SHOT

(INCLUDING PRIMERS) = XXXX LB

NUMBER OF CY IN SHOT = XXXX CY

MAXIMUM POUNDS OF POWDER

PER 8ms DELAY = XXXX LBS

POWDER FACTOR = XX LB/CY

NAME OF BLASTER IN CHARGE = (FULL NAME)

PLANNED SHOT DATE/TIME = XXXXX AT XXXX AM/PM

5' STEMMING

3.5" DIA HOLE

TYPICAL LOADED HOLE

EXAMPLE:

'HI DRIVE' PRIMER WITH 125ms TO 205ms

DU PONT ELECTRIC BLASTING CAP

LOCATED AT BOTTOM OF HOLE WITH ONE

3" X 6" STICK OF TOVEX USED FOR CUSHION.

HAUL DIAGRAM

E.O.P.

MP XX.XX

E.O.P.

MP XX.XX

MP XX.XX

MP XX.XX

ROAD XXXX ROAD XXXX

R

O

D

X

X

X

O

M

A

F

DESIGNATED

ROCK SOURCE

DIRECTION

OF HAUL

40' MAX

15' MIN 40' MAX

15' MIN

15' MIN

OVERBURDEN

CLEARING LIMITS

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/1 2/2

0 1 1:

R

JA

CO

BS

ON

F :\W

OR

KS

PA

CE

\K

MR

D\

MA

RG

AR

ET

\C

ON

TR

AC

T\

KM

RD

M

AR

GA

RE

T

RO

AD

R

ES

TO

RA

TI

ON

.D

W G;

R10

ALASKA REGION

Margaret Restoration Access

TONGASS NATIONAL

FOREST

KETCHIKAN MISTY FJORDS

RANGER DISTRICT

PIT & QUARRY

DEVELOPMENT

Nov 2019

Rev 1

TNF

K. CHERRY

TNF ENG

C-07

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

102 - Bid¸ Award¸ and Execution of Contract

103 - Scope of Work

104 - Control of Work

106 - Acceptance of Work

107 - Legal Relations and Responsibility to the Public

108 - Prosecution and Progress

109 - Measurement and Payment

155 - Schedules for Construction Contracts

157 - Soil Erosion and Sediment Control

201 - Clearing and Grubbing

204 - Excavation and Embankment

303 - Road Reconditioning

572 - Log Stringer Bridges

Preface Preface_wo_05_13_2020

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_1_22_2020

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.06_National_11_9_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements.

Use prevailing industry standards in the absence of specific contract requirements or tolerances.

107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

108 - Prosecution and Progress 108.00_National_11_9_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment 109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

Bituminous Materials; Pavements;

Bed Course Materials

0.01

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1 Ton Mile 1

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

157 - Soil Erosion and Sediment Control 157.04_National_5_13_2020

Delete Subsection 157.04 and replace with the following:

157.04 General.

Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.

When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.

201 - Clearing and Grubbing 201.00_Forest_5_13_2020

Delete Section 201 in its entirety and replace with the following.

Section 201. — CLEARING AND GRUBBING Description

201.01 This work consists of clearing and grubbing within the clearing limits designated in the plans.

Material

201.02 Conform to the following Subsection:

Backfill material 704.03

Construction Requirements

201.03 General. Construct erosion control measures according to Section 157. Perform work within designated limits.

Do not damage vegetation designated to remain. If damage occurs, repair or replace the vegetation in an acceptable manner. Where possible, preserve vegetation adjacent to bodies of water. Treat cuts or scarred surfaces of trees and shrubs with tree wound dressing.

201.04 Clearing. Within the clearing limits clear trees, brush, and other vegetation as follows:

(a) Cut trees so they fall within the clearing limits;

(b) In areas of cut slope rounding, cut stumps flush with or below the finished ground line;

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 6 inches of the ground; and

(d) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 14 feet. Trim tree limbs as near flush with the trunk as practicable.

201.05 Grubbing. Grub deep enough to remove stumps, roots, buried logs, moss, turf, or other vegetative matter as follows:

(a) Grub areas to be excavated, accept for cut slope rounding areas;

(b) Grub embankment areas. Undisturbed stumps less than 24 inches in diameter may be left in place if they protrude less than 6 inches above the original ground and will be covered with more than 48 inches of embankment. Remove all other stumps;

(c) Grub pits, channel changes, and ditches only to the depth necessary for the excavation;

(d) Backfill stump holes and other grubbing holes with backfill material to the level of the surrounding ground according to Subsection 209.09. Compact backfill according to Subsection 209.10; and

(e) Utilization standards for merchantable timber are listed below. Fall and buck merchantable material into lengths not to exceed 40 feet. Pieces (logs) meet utilization standards when such pieces would have met Utilization Standards if bucking lengths were varied to include such material.

Minimum Utilization Standards

Length = 16 feet.

Diameter (Inside Bark) at small end = 7 inches

33-1/3 Net Scale in % Gross for Sawlog

201.06 Disposal. Merchantable timber is Government property. Dispose of clearing and grubbing debris according to Subsection 203.05.

201.07 Acceptance. Clearing and grubbing will be evaluated under Subsection 106.02.

Material for tree wound dressing will be evaluated under Subsection 106.03.

Backfilling and compacting of stumps and grubbing holes will be evaluated under Section 209.

Measurement

201.08 Measure the Section 201 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:

Do not make deductions from the area computation unless excluded areas are shown on the plans.

Do not measure clearing and grubbing of borrow sources.

Payment

201.09 The accepted quantities will be paid at the contract price per unit of measurement for the Section 201 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

204 - Excavation and Embankment 204.00_Forest_5_13_2020

Delete Section 204 in its entirety and replace with the following.

Section 204. — EXCAVATION AND EMBANKMENT Description

204.01 This work consists of excavating material and constructing embankments. This work also includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. Material excavated from within the right-of-way or easement areas, except subexcavation covered in Subsection 204.02(a)(2) and structure excavation covered in Sections 208 and

209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original ground-line in embankment sections. Subexcavation excludes the work required by Subsection

204.05 or 204.06.

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, and topping.

(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:

(1) Preparing foundation for embankment;

(2) Constructing roadway embankments;

(3) Benching for side-hill embankments;

(4) Constructing dikes, ramps, mounds, and berms; and

(5) Backfilling subexcavated areas, holes, pits, and other depressions.

(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.

Material

204.03 Conform to the following Subsections:

Topping 704.05

Unclassified borrow 704.06

Water 725.01(c)

Construction Requirements

204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.

Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation and embankment. Maintain drainage during pioneering operations.

204.05 Conserved Topsoil. When designated, conserve topsoil from roadway excavation and embankment foundation areas. Stockpile conserved topsoil in low windrows immediately beyond the rounding limits of cut and embankment slopes or in other approved locations. Separate conserved topsoil from other excavated material.

When designated, place conserved topsoil on completed slopes according to Section 624.

204.06 Roadway Excavation. Excavate as follows:

(a) Rock cuts. Blast rock according to Section 205.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .