About this file

This document is a request for information regarding facilities operations and maintenance support services at multiple National Institute for Occupational Safety and Health campuses. Key requirements include physical plant operations, maintenance, repair, and select support services for buildings, utilities, roadways and grounds. An 8(a) set-aside is being considered. Responses are requested to include contact information, business size classification, ability to conduct site visits, descriptive literature demonstrating ability to meet requirements, and lists of relevant contracts. Capabilities for organic or subcontracted performance are also requested. The draft performance work statement outlines requirements including facilities and physical plant operations, maintenance, repair, and select support services for the NIOSH sites in order to maintain continuous facility operations.

View the file

Other files for this federal contract opportunity

Other files attached to Request for Information: NIOSH Facilities Operations and Maintenance Support, newest first.
File Type Posted
11. PMs-Pittsburgh.docx DOCX document
13. PMs-Morgantown.xlsx XLSX spreadsheet
16. AssetsEquipment-Morgantown.xlsx XLSX spreadsheet
19. Government Furnished Equipment_Pittsburgh.pdf PDF
3. Campus Map - Morgantown.pdf PDF
5. Campus Map - Spokane.pdf PDF
10. Floor plans-Spokane.pdf PDF
18. AssetsEquipment-Spokane.xlsx XLSX spreadsheet
1. O&M DRAFT Performance Work Statement_Feb 2024_v3.docx DOCX document
4. Campus Map - Cincinnati.pdf PDF
7. Floor plans-Pittsburgh.pdf PDF
9. Floor plans-Cincinnati.pdf PDF
14. PMs-Spokane.docx DOCX document
15. AssetsEquipment-Pittsburgh.xlsx XLSX spreadsheet
2. Campus Map - Pittsburgh.pdf PDF
6. Building Gross Square Footage for all Campuses.pdf PDF
8. Floor plans-Morgantown.pdf PDF
17. AssetsEquipment-Cincinnati.xlsx XLSX spreadsheet
20. Historical Positions Data.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

All Static

TASKNUMDESCRIPTIONWOTYPEPRIORITYINSERVTASKEXPENSECLASSMULTITASKASSIGNEDTOSITEIDUPDATESTAMPUPDATEUSERCONVNUMATFIRSTNAMEATLASTNAMEEMP.EMPCODEEMP.LASTNAMEEMP.FIRSTNAMEWOTYPE(WOTYPE).WOTYPEWOTYPE(WOTYPE).DESCRIPTIONTASKEQ.EQNUMTASKEQ.LOCATIONTASKEQ.SUBLOCATION1TASKEQ.SUBLOCATION2TASKEQ.SUBLOCATION3TASKEQ.DESCRIPTIONTASKEQ.NEXTDUEDATETASKEQ.LASTPERFDATETASKEQ.SCHEDTYPETASKEQ.TASKDURATIONTASKEQ.TIMESCOMPLETEDTASKEQ.DOWNTIMETASKEQ.MUSTBEDOWNTASKEQ.DATEUNITTASKEQ.NUMOFDATETSKCRAFT.CRAFTTSKCRAFT.NUMOFPEOPLETSKCRAFT.ESTLABORHOURSTSKINSTR.INSTRCODEINSTR.INSTRTEXT
--3YNNIOSH-CIN-----DND
H-0001-MM-1HAMILTON MM ON SF-8 (COMPONENT OF A/C 1 SYSTEM)PM-SCH-M1YH-PM-SCHNDAVIDNIOSH-CIN1DAVIDWELCHDAVIDWELCHDAVIDPM-SCH-MMONTHLY - SCHEDULED PMH-SF-8HAMILTONROOF-ROOF GOV. 1SUPPLY FAN4/4/22 0:002/7/22 0:00D309NM1HVAC24H-SF-8____Chk. voltage;_____,_____,_____NAMEPLATE VOLTS 460

____Chk.air filters; Pres. drop _____(SHOULD BE .7 TO 1.2) ( FILTER SIZES 6-24X24X2, 3 24X12X2, 6-24X24X12, 3-24X12X12.

____Chk. belts;(USED 3 B148) adj. or replace as nec.

____Chk. motor; Amps_____,_____,_____; lube as nec. NAMEPLATE AMPS 18.5 AMPS ____Chk. frequency drive; reading_____% occupied. (Should be 95%) ____Chk. frequency drive; reading_____% unoccupied (Should be 47.5%) ____Chk. bearings; cln.& lube as nec.

____Chk. electric system; cln. as nec.

____Chk. for nut & bolt tightness, noise, vibration ____Chk. dampers & controls.

____Chk. blower & pulleys; cln. as nec.

____Cln. unit & area around unit. paint,etc. as nec.

____Chk. registors & grills; clean as nec.

____Chk. RPM _____(SHOULD BE APP. 800 RPM) ____Inspect safety items; signs, markers, guards.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0003-MM-1 HAMILTON MM ON EF-21 (COMPONENT OF A/C 1 SYSTEM) PM-SCH-M 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-EF-21 HAMILTON ROOF - ROOF GOV 1 SYSTEM EXHAUST FAN 4/4/22 0:00 2/7/22 0:00 D 309 N M 1 HVAC 2 4 H-EF-21 ____Chk. voltage;_____,_____,_____NAMEPLATE VOLTS 460 ____Chk.air filters; Pres. drop _____(SHOULD BE .7 TO 1.2) ( FILTER SIZES 6-24X24X2, 3 24X12X2, 6-24X24X12, 3-24X12X12.

____Chk. belts;(USED 3 B148) adj. or replace as nec.

____Chk. motor; Amps_____,_____,_____; lube as nec. NAMEPLATE AMPS 18.5 AMPS ____Chk. frequency drive; reading_____% occupied. (Should be 95%) ____Chk. frequency drive; reading_____% unoccupied (Should be 47.5%) ____Chk. bearings; cln.& lube as nec.

____Chk. electric system; cln. as nec.

____Chk. for nut & bolt tightness, noise, vibration ____Chk. dampers & controls.

____Chk. blower & pulleys; cln. as nec.

____Cln. unit & area around unit. paint,etc. as nec.

____Chk. registors & grills; clean as nec.

____Chk. RPM _____(SHOULD BE APP. 800 RPM) ____Inspect safety items; signs, markers, guards.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0005-MM-1 HAMILTON MM ON EF-26 (A/C 1 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-EF-26 HAMILTON ROOF 309 ROOF FOR HOOD IN 309 EXHAUST FAN 4/4/22 0:00 3/3/22 0:00 D 309 N M 1 HVAC 1 1 H-EF-26 EF-26 For Hood In Lab 309 (PART OF AC-1 SYSTEM) ____Chk. voltage; _____,_____;(NAMEPLATE 115 VOLTS) ____Chk. motor; Amps _____,_____; cln. & lube as nec. (NAMEPLATE AMPS 11.4) ____Chk. belts(USES 1 4L280) adj. or replace as nec.

____Chk. bearings, blower & pulleys; cln. & lube as nec.CK. RPM_____(SHOULD BE 1350 ____Chk. electric system; cln. as nec.

____Chk. for nut & bolt tightness, noise & vibration.

____Chk. dampers & controls.

____Cln. unit & area around unit; paint, etc. as nec.

____Inspect safety items; signs, markers, guards.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0006-MM-1 HAMILTON MM ON THE GP-1 (COMPONENT OF A/C 1 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-GP-1 HAMILTON ROOF - ROOF--- GAS PREHEATER 4/3/22 0:00 2/7/22 0:00 D 309 N M 1 HVAC 1 1 H-GP-1 ____Chk. voltage; _____,_____,_____ (NAMEPLATE 208 VOLTS) ____Chk. burner motor; Amps _____,_____,_____, lube as nec.(NAMEPLATE AMPS 1.5) ____Chk. exhauster motor; Amps_____,_____,_____, lube as nec.(NAMEPLATE AMPS 2.5) ____Chk. outlet temp.; _____ (Set at 52 degree's) ____Chk. electric sys.; cln. as nec.

____Chk. limit control; (SETPOINT 200) ____Chk. for nut & bolt tightness, noise, & vibration ____Cln. unit & area around unit. paint , etc. as nec.

____Chk. inlet temp. cutout; (set at 48 degree's) ____Chk. exhauster bearings; lube as nec.

____Chk. exhauster belt; adj. or replace as nec.(USES 1 A26 BELT) ____Chk. exhauster pulleys; RPM _____ (SHOULD BE APP. 1300 RPM) ____Chk. flame signal; Microamperes_____(MINIMUM 2, MAXIMUM 5)

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0007-MM-1 HAMILTON MM ON RTU-52 (COMPONENT OF A/C 1 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-RTU-52 HAMILTON ROOF - ROOF--- ROOF TOP UNITS 4/4/22 0:00 2/7/22 0:00 D 309 N M 1 HVAC 2 4 H-RTU-52 H-RTU-52 ____Chk. voltage; ___,_____,_____ (NAMEPLATE VOLTS 460) ____Chk. compressor amps; #1_____,____,____ #2____,____,____,#3____,____,____,#4____,____,____,#5____,____,____ #6____,____,____ #7.____,____,____, #8. ____,____,____, #9. ____,____,____, #10. ____,____,____

(NAMEPLATE AMPS-COMPRESSOR'S 1 & 2 = 27.2) (COMPRESSOR 3 THRU 10 = 25 AMPS)

____Chk. motor; Amps ____,____,____(NAMEPLATE AMPS 23.5) ____Chk. FREQUENCY DRIVE; READING _____% occupied (SHOULD BE APP.90%) ____Chk. FREQUENCY DRIVE; READING _____% UNOCCUPIED ( SHOULD BE APP. 45%) ____Chk. fan belts; adj. or replace as nec.(USED 2 BX-93 BELTS) ____Chk. fan bearings, blower & pulleys; cln. & lube as nec. RPM ____ (SHOULD BE APP.1100 RPM), ____Chk. for nut & bolt tightness; noise, vibration & electric system ____Cln. unit & area around the unit; paint, etc. as nec.

____Cln. drains & drain pans; add tablets to pan.

____Chk. dampers & controls.

____Chk. air temps. O/S_____, HD _____,CD_____ ( HD SET AT 90) (CD SET AT 55) ____Chk. cond. fan motors; amps 1.__X___,_____,_____2._____,_____,_____3 ____,____,____, 4 ____,____,____, 5____,____,____, 6 ____,____,____, 7 ____,____,____, 8 ____,____,____, 9 ____,____,____ 10 ____,____,____.

(ALL CONDENSER FAN NAMEPLATE AMPS 2.7)

____Chk. cond. & evap. coils; cln. as nec.

____Chk. ref. pressures & sight glasss; as nec.1 lo __X__,hi____, 2 lo___hi____, 3 lo____ hi ____, 4 lo ____, hi ____, 5 lo____ hi ____, 6 lo ____, hi ____, 7 lo ____ hi ____, 8 lo ____ hi ____, 9 lo ____ hi ____, 10 lo ____ hi ____.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0008-MM-1 HAMILTON MM ON RTU-52 BURNER PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-RTU-52 BRN HAMILTON ROOF - ROOF--- ROOF TOP UNITS 4/3/22 0:00 2/7/22 0:00 D 309 N M 1 HVAC 1 1 H-RTU52BRN ____Chk. voltage; _____,_____(NAMEPLATE VOLTS 115) ____Chk. burner motor; Amps _____,_____(NAMEPLATE AMPS 7) lube as nec.

____Chk. electric sys.; cln. as nec.

____Chk dampers & controls.

____Chk. limit control;

____Chk. for nut & bolt tightness, noise, vibration ____Cln. unit & area around the unit; paint, etc. as nec.

____Inspect the gas line; repair as nec.

____Inspect safety items; signs, markers, guards.

____Chk. hot deck temp. _____ (should be app. 90) ____Chk. outside air temp. cutoff ( should be app. 65 ) ____Chk. flame signal; Microampers _____ ( should be 2-5 )

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0009-MM-1 HAMILTON MM ON LABS 303 - 424 PM-SCH-M 3 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-LABS 303-424 HAMILTON FIRST 303-424 EAST LABS- MIXING BOXES AND CONTROLS 4/4/22 0:00 2/10/22 0:00 D 309 N M 1 HVAC 2 2 H-LABS ____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. ALARM LIGHTS AND BELLS ON HOODS AND IN CORRIDORS; CLN. OR REPAIR AS NEC.

____CHK. LABS FOR BEING NEGITIVE TO THE CORRIDOR IN OCCUPIED & UNOCCUPIED MODES. ADJ. AS NEC.

____CHK. MIXING BOXES IN LAB 303 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____ MB-3 TEMP____ ____CHK. MIXING BOXES IN LAB 309 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____, HUM._____-CAL.READING_____.

____CHK. MIXING BOXES IN LAB 313 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 317 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____.

____CHK. MIXING BOXES IN LAB 319 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP ____.

____CHK. MIXING BOXES IN LAB 321 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____.

____CHK. MIXING BOXES IN LAB 323 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____.

____CHK. MIXING BOXES IN LAB 325 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____, ____CHK. MIXING BOXES IN LAB 327 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____, ____CHK. MIXING BOXES IN LAB 402 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____, ____CHK. MIXING BOXES IN LAB 406 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 410 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 414 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 420 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 422 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 424 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOX 300 CORR. E. Z SPT____,ZT____-CAL.READING_____, MB TEMP____

____CHK. MIXING BOX 300 CORR. MID E.Z SPT____,ZT____-CAL.READING_____, MB TEMP____

____CHK. MIXING BOX 400 CORR. E. Z SPT____,ZT____-CAL.READING_____, MB TEMP____

____CHK. MIXING BOX 400 CORR. MID E.Z SPT____,ZT____-CAL.READING_____, MB TEMP____

H-0010-MM-2 HAMILTON MM ON SF-7 (COMPONENT OF A/C 2 SYSTEM) PM-SCH-M 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-SF-7 HAMILTON ROOF - ROOF GOV. 2 SUPPLY FAN 4/4/22 0:00 2/10/22 0:00 D 201 N M 1 HVAC 2 4 H-SF-7 ____Chk. voltage;_____,_____,_____NAMEPLATE 460 VOLTS ____Chk.air filters(USES 8-24X24X2 & 8-24X24X12) Pres. drop _____(SHOULD BE .7 TO 1.2) ____Chk. belts; adj. or replace as nec. (Size 4-B-158) ____Chk. motor; Amps_____,_____,_____; lube as nec.NAMEPLATE 24 AMPS ____Chk. frequency drive; reading_____% OCCUPIED ( SHOULD BE APP. 88%) ____Chk. frequency drive; reading_____% unoccupied (should be app. 44%) ____Chk. bearings; cln.& lube as nec.

____Chk. electric system; cln. as nec.

____Chk. for nut & bolt tightness, noise, vibration ____Chk. dampers & controls.

____Chk. blower & pulleys; cln. as nec.

____Cln. unit & area around unit. paint,etc. as nec.

____Chk. registors & grills; clean as nec.

____Chk. RPM _____ (780 RPM) ____Inspect safety items; signs, markers, guards.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0012-MM-2 HAMILTON MM ON EF-20 (COMPONENT OF A/C 2 SYSTEM) PM-SCH-M 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-EF-20 HAMILTON ROOF - ROOF GOV 2 SYSTEM EXHAUST FAN 4/3/22 0:00 2/10/22 0:00 D 309 N M 1 HVAC 2 4 H-EF-20 ____Chk. belts; adj. or replace as nec.(USES 3 B-133 BELTS) ____Chk. motor; Amps _____,_____,_____; lube as nec.(NAMEPLATE AMPS 12) ____Chk. bearings; cln & lube as nec.

____Chk. dampers & controls.

____Chk. blower & pulleys; cln. as nec.

____Cln. unit & area around the unit; paint, etc. as nec.

____Chk. Exhaust static pressure. _____ (should be .8 in occupied possition) ____Chk. Exhaust static pressure. _____ (should be .4 in unoccupied possition) ____Chk. frequency drive; reading_____% in occupied possition.

____Chk. frequency drive; reading_____% in unoccupied possition.

____Chk. registors & grills; cln. as nec.

____Chk. RPM _____ (SHOULD BE APP. 700) ____Inspect safety items; signs, markers, guards.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0014-MM-2 HAMILTON MM ON RTU-54 (COMPONENT OF A/C 2 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-RTU-54 HAMILTON ROOF - ROOF--- ROOF TOP UNITS 4/3/22 0:00 2/10/22 0:00 D 309 N M 1 HVAC 2 4 H-RTU-54 ____Chk. voltage; _____,_____,_____ (NAMEPLATE VOLTS 460) ____Chk. compressor amps; #1____, ____,____ #2____,____,____,#3____,____,____,#4____,____,____,#5____,____,____ #6____,____,____ #7.____,____,____, #8. ____,____,____, #9.____,____,____, #10. ____,____,____ (NAMEPLATE AMPS-COMPRESSOR'S 1 & 2= 27.2 AMPS) (COMPRESSOR'S 3 THRU 10 = 25 AMPS) ____Chk. motor; Amps ____,____,____(NAMEPLATE MOTOR AMPS 23.5) ____Chk. FREQUENCY _____% occupied (SHOULD BE APP.85%) ____Chk. frequency _____% unoccupied (should be app. 47.5%) ____Chk. fan belts; adj. or replace as nec.(USED 2 BX-93 BELTS) ____Chk. fan bearings, blower & pulleys; cln. & lube as nec. RPM _1084___ (SHOULD BE APP.1050 RPM) ____Chk. for nut & bolt tightness; noise, vibration & electric system ____Cln. unit & area around the unit; paint, etc. as nec.

____Cln. drains & drain pans; add tablets to pan.

____Chk. dampers & controls.

____Chk. air temps. O/S_____, HD _____,CD_____(HD IS SET AT 90) COLD DECK IS SET AT 55) ____Chk. cond. fan motors; amps 1._____,_____,_____2._____,_____,_____3 ____,____,____, 4 ____,____,____, 5____,____,____, 6 ____,____,____, 7 ____,____,____, 8 ____,____,____, 9 ____,____,____ 10 ____,____,____.

(ALL CONDENSER FAN NAMEPLATE AMPS 2.7)

____Chk. cond. & evap. coils; cln. as nec.

____Chk. ref. pressures & sight glasss; as nec.1 lo ____,hi____, 2 lo___hi____, 3 lo____ hi ____, 4 lo ____, hi ____, 5 lo____ hi ____, 6 lo ____, hi ____, 7 lo ____ hi ____, 8 lo ____ hi ____, 9 lo ____ hi ____, 10 lo ____ hi ____.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-0016-MM-2 HAMILTON LABS 351-460 PM-SCH-M 3 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-LABS 351-460 HAMILTON FIRST 351-460 WEST LABS- MIXING BOXES AND CONTROLS 4/3/22 0:00 2/10/22 0:00 D 308 N M 1 HVAC 2 2 H-LABS REAR ____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. ALARM LIGHTS AND BELLS ON HOODS AND IN CORRIDORS; CLN. OR REPAIR AS NEC.

____CHK. LABS FOR BEING NEGITIVE TO THE CORRIDOR IN OCCUPIED & UNOCCUPIED MODES. ADJ. AS NEC.

____CHK. MIXING BOXES IN LAB 351 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____, ____CHK. MIXING BOXES IN LAB 353 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____,MB-3 TEMP____, HUM._____-CAL.READING_____.

____CHK. MIXING BOXES IN LAB 355 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____,MB-3 TEMP____,MB-4 TEMP____,MB-5 TEMP____.

____CHK. MIXING BOXES IN LAB 361 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____,MB-3 TEMP____.

____CHK. MIXING BOXES IN LAB 450 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 452 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 454 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOXES IN LAB 456 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____,MB-3 TEMP____.

____CHK. MIXING BOXES IN LAB 458 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____.

____CHK. MIXING BOXES IN LAB 460 Z SPT____,ZT ____-CAL.READING_____, MB-1 TEMP____,MB-2 TEMP____.

____CHK. MIXING BOX 300 CORR. W. Z SPT____,ZT ____-CAL.READING_____, MB TEMP____

____CHK. MIXING BOX 300 CORR. MID W.Z SPT____,ZT ____-CAL.READING_____, MB TEMP____

____CHK. MIXING BOX 400 CORR. W. Z SPT____,ZT ____-CAL.READING_____, MB TEMP____

____CHK. MIXING BOX 400 CORR. MID W.Z SPT____,ZT ____-CAL.READING_____, MB TEMP____

H-0044 HAMILTON MM ON LAWN AND GROUNDS PM-SCH-M 3 Y H-PM-SCH N MIKE-CLYB NIOSH-CIN 1 MIKE CLYBURN MIKE-CLYB CLYBURN MIKE PM-SCH-M MONTHLY - SCHEDULED PM H-LAWN HAMILTON OUTSIDE - GROUNDS HAMILTON LAWN MAINTENANCE 4/10/22 0:00 2/25/22 0:00 D 274 N M 1 LABOR 1 40 H-LAWN ____CUT GRASS, TRIM, REMOVE WEEDS; AS NEEDED

____EMPTY TRASH CONTAINERS AND ASH TRYS IN SMOKE HUT AS NEEDED.

____EMPTY OUTSIDE TRASH CANS.

____TRIM TREE'S, SCHRUBS AT LEAST 12" AWAY FROM BUILDING; AS NEEDED

____MULCH; AS NEEDED

____FERTILIZE, PLANT, WATER BEDS AS NEEDED.

____KEEP LOT FREE OF DEBRIS; REMOVE LEAVES AND CLEAN AS NEEDED.

____CHECK AND CLEAN SIDEWALK, CURB AND KEEP OUTSIDE DRAINS CLEAR OF LEAVES, AS NEEDED.

____NOTIFY OF ANY SAFETY ITEMS NEEDING ATTENTION AROUND THE BUILDINGS.(WALKS, PARKING BARRIERS, SIGNS, LEANING TREES, ECT)

____KEEP LEAVES AND ORGANIC MATERIALS AWAY FROM SIDE OF BUILDINGS.

____SPRAY MOLDED AREAS WITH WET & FORGET AROUND BUIDLINGS.

____CHECK CULVERT PIPE UNDER DRIVE FOR OBSTRUCTIONS ONCE A MONTH; CLEAN OUT AS NECESSARY. DO NOT CLEAN IT WHILE WATER IS FLOWING THOUGH THE PIPE.

-------KEEP TRACK OF MATERIALS USED EACH MONTH--------

----AMOUNT OF FERTILIZER USED________________.

----AMOUNT OF SEED USED______________.

----AMOUNT OF MULCH USED______________.

----AMOUNT OF PLANTS USED______________.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1110-MM-2 HAMILTON MM ON RTU-54 BURNER (COMPONENT OF A/C 2 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-RTU-54 BRN HAMILTON ROOF - ROOF--- ROOF TOP UNITS 4/4/22 0:00 2/9/22 0:00 D 309 N M 1 HVAC 1 1 H-BRN. ____Chk. voltage; _____,_____(NAMEPLATE VOLTS 115) ____Chk. burner motor; Amps _____,_____(NAMEPLATE AMPS 7) lube as nec.

____Chk. electric sys.; cln. as nec.

____Chk dampers & controls.

____Chk. limit control;

____Chk. for nut & bolt tightness, noise, vibration ____Cln. unit & area around the unit; paint, etc. as nec.

____Inspect the gas line; repair as nec.

____Inspect safety items; signs, markers, guards.

____Chk. hot deck temp. _____ (should be app. 90) ____Chk. outside air temp. cutoff ( should be app. 65 ) ____Chk. flame signal; Microampers _____ ( should be 2-5 )

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1114-MM-2 HAMILTON MM ON THE GP- 2 (COMPONENT OF A/C 2 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-GP-2 HAMILTON ROOF - ROOF GAS PREHEATER 4/4/22 0:00 2/8/22 0:00 D 301 N M 1 HVAC 1 1 H-GP-2 ____Chk. voltage; _____,_____,_____ (NAMEPLATE 208 VOLTS) ____Chk. burner motor; Amps _____,_____,_____, lube as nec.(NAMEPLATE AMPS 1.5) ____Chk. exhauster motor; Amps_____,_____,_____, lube as nec.(NAMEPLATE AMPS 2.5) ____Chk. outlet temp.; _____ (Set at 52 degree's) ____Chk. electric sys.; cln. as nec.

____Chk. limit control; (SETPOINT 200) ____Chk. for nut & bolt tightness, noise, & vibration ____Cln. unit & area around unit. paint , etc. as nec.

____Chk. inlet temp. cutout; (set at 48 degree's) ____Chk. exhauster bearings; lube as nec.

____Chk. exhauster belt; adj. or replace as nec.(USES 1 A28 BELT) ____Chk. exhauster pulleys; RPM _____ (SHOULD BE APP. 1900 RPM) ____Chk. flame signal; Microamperes_____(MINIMUM 2, MAXIMUM 5)

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1126-MM-3 HAMILTON MM ON EF-24 (COMPONENT OF A/C 3 SYSTEM) PM-SCH-M 3 Y H-PM-SCH Y STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-EF-24 HAMILTON OUTSIDE - S.W. CORNER OF BUILD. EXHAUST FAN FOR A/C 3 SYSTEM. 4/4/22 0:00 2/9/22 0:00 D 308 N M 1 HVAC 2 2 H-EF-24 ____Chk. voltage; _____,_____,_____(NAMEPLATE 460 VOLTS) ____Chk. motor; Amps _____,_____,_____; cln. & lube as nec.(NAMEPLATE AMPS 18.5) ____Chk. belts; adj. or replace as nec.(USES 3 C128 BELTS) ____Chk. bearings, blower & pulleys; cln. & lube as nec.

____Chk. electric system; cln. as nec.

____Chk. for nut & bolt tightness, noise & vibration.

____Chk. dampers & controls.

____Cln. unit & area around unit; paint, etc. as nec.

____Inspect safety items; signs, markers, guards.

____Chk. RPM _____(SHOULD BE APP. 800 RPM) ____CHECK EXHAUST STATIC PRESSURE; _____ FREQUENCY _____% OCCUPIED (SETPOINT 1.05) ____CHECK EXHAUST STATIC PRESSURE; _____ FREQUENCY _____% UNOCCUPIED (SETPOINT APP..55) ____Chk. registors & grills; cln. as nec.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1127-MM-3 HAMILTON MM ON EF-25 (COMPONENT OF A/C 3 SYSTEM) PM-SCH-M 3 Y H-PM-SCH Y STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-EF-25 HAMILTON OUTSIDE - O/S S.W. SIDE OF BLDG. EXHAUST FAN 4/5/22 0:00 2/9/22 0:00 D 308 N M 1 HVAC 2 2 H-EF-25 ____Chk. voltage; _____,_____,_____(NAMEPLATE 460 VOLTS) ____Chk. motor; Amps _____,_____,_____; cln. & lube as nec.(NAMEPLATE AMPS 18.5) ____Chk. belts; adj. or replace as nec.(USES 3 C109 BELTS) ____Chk. bearings, blower & pulleys; cln. & lube as nec.

____Chk. electric system; cln. as nec.

____Chk. for nut & bolt tightness, noise & vibration.

____Chk. dampers & controls.

____Cln. unit & area around unit; paint, etc. as nec.

____Inspect safety items; signs, markers, guards.

____Chk. RPM _555____(SHOULD BE APP. 800 RPM) ____Chk exhaust static pres. _____ occupied (SETPOINT 1.05) Frequency _____% ____Chk. exhaust static pres. _____ unoccupied ( setpoint .55) Frequency ______% ____Chk. registors & grills; cln. as nec.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1128-MM-3 HAMILTON MM ON EF-13 (COMPONENT OF A/C 3 SYTEM) PM-SCH-M 1 N H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-EF-13 HAMILTON ROOF B-521 LAB EXHAUST FAN 12/4/16 0:00 11/14/16 0:00 D 246 N M 1 HVAC 1 1 H-EF-13 ____Chk. voltage; _____,_____,_____(NAMEPLATE VOLTS 208) ____Chk. motor; Amps _____,_____,_____(NAMEPLATE AMPS 14) cln. & lube as nec.

____Chk. bearings, blower & pulleys; cln. & lube as nec.

____Chk. electric system; cln. as nec.

____Chk. for nut & bolt tightness, noise & vibration.

____Chk. dampers & controls.

____Cln. unit & area around unit; paint, etc. as nec.

____Inspect safety items; signs, markers, guards.

____Chk. supply blower in the hood. VOLTAGE____,____(NAMEPLATE VOLTS 115)

____CHK. SUPPLY BLOWER IN THE HOOD AMPS ____,____(NAMEPLATE AMPS 7)

____Chk. supply filter on hood; mag. reading _____(SHOULD BE APP. .2 TO .6) ____Chk VAV damper controller; Reading_____(SHOULD BE 0, CAN BE 2.5 TO 5 + OR -)

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1129-MM-3 HAMILTON MM ON AHU-55 (COMPONENT OF A/C 3 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-AHU-55 HAMILTON BAS. B-509 MECH. ROOM B-509 AIR HANDLING UNIT FOR A/C 3 SYSTEM 4/4/22 0:00 2/11/22 0:00 D 310 N M 1 HVAC 2 2 H-AHU55 ____Chk. voltage; _____,_____,_____(NAMEPLATE 460 VOLTS) ____Chk. motor; Amps _____,_____,_____(NAMEPLATE AMPS 25) cln. & lube as nec.

____Chk. frequency drive; reading _____% occupied (should be app. 70%) ____Chk. frequency drive: reading _____% unoccupied (should be app. 35%) ____Chk. belts(USES 2-5VX600) adj. or replace as nec.

____Chk. bearings, blower & pulleys; cln. & lube as nec. RPM _____(SHOULD BE APP. 750) ____Chk. for nut & bolt tightness, noise, vibration & electric system. cln as nec.

____Chk. dampers & controls.

____Cln. unit & area around unit; paint, etc. as nec.

____Chk. air filters(USES 16-24X24X2) Pres. drop _____, cln. or replace as nec.

____Cln drain & drain pans; add treatment tablets.

____Chk. chilled water 3 way valve.

____Chk. hot water heating 3 way valve.

____Chk. air temps. O/S_____, Sup._____, ENTERING AIR_____.

____Chk. registors & grills; cln. as nec.

____Chk. chilled and hot water coils; cln. as nec.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1130-MM-3 HAMILTON MM ON THE GP- 3 (COMPONENT OF A/C 3 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-GP-3 HAMILTON OUTSIDE - OUTSIDE S. SIDE GAS PRE-HEAT FOR AC-3 SYSTEM 4/4/22 0:00 2/9/22 0:00 D 223 N M 1 HVAC 1 1 H-GP-3 ____Chk. voltage; _____,_____,_____ (NAMEPLATE 208 VOLTS) ____Chk. burner motor; Amps _____,_____,_____, lube as nec.(NAMEPLATE AMPS 1.5) ____Chk. exhauster motor; Amps_____,_____,_____, lube as nec.(NAMEPLATE AMPS 2.5) ____Chk. outlet temp.; _____ (Set at 52 degree's) ____Chk. electric sys.; cln. as nec.

____Chk. limit control; (SETPOINT 200) ____Chk. for nut & bolt tightness, noise, & vibration ____Cln. unit & area around unit. paint , etc. as nec.

____Chk. inlet temp. cutout; (set at 48 degree's) ____Chk. exhauster bearings; lube as nec.

____Chk. exhauster belt; adj. or replace as nec.(USES 1 A28 BELT) ____Chk. exhauster pulleys; RPM _____ (SHOULD BE APP. 1900 RPM) ____Chk. flame signal; Microamperes_____(MINIMUM 2, MAXIMUM 5)

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1131-MM-3 HAMILTON MM ON LABS B-515 - B-525 PM-SCH-M 3 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-LAB-515-525 HAMILTON BAS. B-515 - B-525 CARCINOGEN LABS MIXING BOXES AND CONTROLS 4/4/22 0:00 2/10/22 0:00 D 309 N M 1 HVAC 2 1 H-LABS3 ____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. ALARM LIGHTS AND BELLS ON HOODS AND IN CORRIDORS; CLN. OR REPAIR AS NEC.

____CHK. LABS FOR BEING NEGITIVE TO THE CORRIDOR IN OCCUPIED & IN UNOCCUPIED MODES

H-1132-MM-3 HAMILTON QM ON HOT WATER PUMP 3 PM-SCH-Q 1 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-Q QUARTERLY SCHEDULED PM H-HWP-3 HAMILTON BAS. B-415 BACK OF CURTAIN BAS. HWP FOR REHEAT COILS IN CARCINOGEN LABS 4/18/22 0:00 2/9/22 0:00 D 199 N M 1 HVAC 1 1 H-HWP-3 ____CHK. VOLTAGE; ____,____(NAMEPLATE VOLTS 115)

____CHK. AMPS; ____,____(NAMEPLATE AMPS 1.9)

____CHK. MOTORS; LUBE AS NEC.

____CHK. COUPLINGS;

____CHK. BEARING ASSEMBLYS; LUBE AS NEC.

____CHK. NUT & BOLT TIGHTNESS, NOISE & VIBRATION

____CLN. PUMP & AREA AROUND PUMP; PAINT, ETC. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1133-MM-3 HAMILTON MM ON CARCINOGEN LAB HOT WATER RE-HEATS PM-SCH-M 1 Y H-PM-SCH Y STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-M MONTHLY - SCHEDULED PM H-HOT WATER RE-HEAT COILS HAMILTON BAS. CARCINOGEN LABS CARCINOGEN LABS RE-HEAT COILS HOT WATER RE-HEAT COILS 4/5/22 0:00 2/10/22 0:00 D 265 N M 1 HVAC 2 2 H-HW-RE-HTS ____Chk. Operation: Observe valves going to 100 % heat and back to 0 %.

____Chk. piping and coils for water leaks; clean & repair as nec.

____Chk. zone thermostats;

____Zone 514: set point ____, room temp.____ ____Zone 515: set point ____, room temp.____ ____Zone 517: set point ____, room temp.____ ____Zone 521: set point ____, room temp.____ ____Zone 521a: set point ____, room temp.____ ____Zone 523: set point ____, room temp.____ ____Zone 525: set point ____, room temp.____

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1134-MM-3 HAMILTON MM ON A/C-56 (CHILLER COMPONANTOF A/C 3 SYSTEM) PM-SCH-M 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-A/C-56 HAMILTON OUTSIDE - S.W. CORNER OF BUILDING. A/C UNIT 4/4/22 0:00 2/9/22 0:00 D 309 N M 1 HVAC 1 2 H-CHILLER ____Chk. voltage; _____,_____,_____(NAMEPLATE VOLTS 460) ____Chk. comp.; Amps #1_____,_____,_____(NAMEPLATE AMPS 92.4)#2_____,_____,_____(NAMEPLATE AMPS 61.6) ____Chk. sight glasses;

____Chk. oil level on compressors; adj. as nec.

____Chk. electric sys.; cln. as nec.

____Chk. for nut & bolt tightness, noise, vibration ____Cln. unit & area around unit; paint, etc. as nec.

____Chk. cond. fans. amps;1____,____,____,2____,____,____,3____,____,____,4____,____,____(NAMEPLATE AMPS 3.4) ____Chilled water temp.SUPPLY _____, RETURN _____ ____Chk. ref. pres. #1 lo_____,hi_____, #2 lo____,hi_____, ____Cln. cond. & evap. as nec.

____Inspect safety items; signs, markers, guards.

____CK. CHILLED WATER LOOP; PUMP PRESSURE ____(SHOULD BE APP. 40) SIGHT GLASS AT EXPANSION TANK.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1135-QM-4 HAMILTON QM ON THE BOILER 1 PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-BLRS-1 HAMILTON BAS. B-58 BOILER ROOM--- # 1 BOILER 5/12/22 0:00 2/28/22 0:00 D 169 N M 3 HVAC 1 2 H-BLRS 1 ____Chk. voltage;_____,_____ (NAMEPLATE VOLTS 115) ____Chk. burners; cln. or adj. as nec. Amps ____,____ (NAMEPLATE AMPS 13.2) ____Hot Water Temp;______ (SHOULD BE 120 TO 180) Prsssure ______ (SHOULD BE 10 TO 20 PSI) ____Inspect gas lines; repair leaks as nec.

____Chk. dampers & controls. Test low water cutoffs.

____Chk for leakage, rust, corrosion, etc.

____Cln. unit & area around unit; paint, etc. as nec.

____Make up Water meter reading. ________; (IF READING IS HIGHER THAN THE LAST READING, FIND OUT WHY ITS MAKING UP WATER.)

____Observe operation, run through a cycle; adj. as nec.

____Chk. for nut & bolt tightness, noise, vibration& electrical system

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1136-QM-4 HAMILTON QM ON THE BOILER 2. PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-BLRS-2 HAMILTON BAS. B-58 BOILER ROOM--- BOILER 5/5/22 0:00 2/24/22 0:00 D 168 N M 3 HVAC 1 2 H-BLR 2 ____Chk. voltage; _____,_____ (NAMEPLATE 115 VOLTS) ____Chk. burner; cln. or adj. as nec. Amps ____,____ (NAMEPLATE AMPS 13.2) ____Hot Water Temp;______ (SHOULD BE 120 TO 180),Prsssure ______ (SHOULD BE 10 TO 20 PSI) ____Inspect gas lines; repair leaks as nec.

____Chk. dampers & controls. Test low water cutoffs.

____Chk for leakage, rust, corrosion, etc.

____Cln. unit & area around unit; paint, etc. as nec.

____Make up Water meter reading. ________; IF HIGHER THAN THE LAST READING FIND WHY ITS MAKING UP WATER ____Observe operation, run through a cycle; adj. as nec.

____Chk. for nut & bolt tightness, noise, vibration& electrical system

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1137-AM-4 HAMILTON BOILERS ANNUAL INSPECTION PM-SCH-A 3 Y H-PM-SCH N CHRIS NIOSH-CIN 1 CHRIS THOMPSON CHRIS THOMPSON CHRIS PM-SCH-A ANNUAL - SCHEDULED PM H-BLRS-1 HAMILTON BAS. B-58 BOILER ROOM--- # 1 BOILER 6/2/22 0:00 6/8/21 0:00 D 19 N Y 1 HVAC 1 16 H-BOIL INSP

_____ HAVE BOILERS INSPECTED BY BOILER INSPECTOR.

_____ OPEN & CLEAN ONE BOILER EACH YEAR ROTATING BOILERS; BOILER OPENED_____

_____ OPEN & CLEAN THE LOW WATER CUT OFF ON THE BOILER THATS GETS OPENED UP.

_____ AFTER BOILER INSPECTION RE-ASSEMBLE BOILER AND PUT BACK ON LINE.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1137-AM-4 HAMILTON BOILERS ANNUAL INSPECTION PM-SCH-A 3 Y H-PM-SCH N CHRIS NIOSH-CIN 1 CHRIS THOMPSON CHRIS THOMPSON CHRIS PM-SCH-A ANNUAL - SCHEDULED PM H-BLRS-2 HAMILTON BAS. B-58 BOILER ROOM--- BOILER 6/24/22 0:00 6/8/21 0:00 D 19 N Y 1 HVAC 1 16 H-BOIL INSP

_____ HAVE BOILERS INSPECTED BY BOILER INSPECTOR.

_____ OPEN & CLEAN ONE BOILER EACH YEAR ROTATING BOILERS; BOILER OPENED_____

_____ OPEN & CLEAN THE LOW WATER CUT OFF ON THE BOILER THATS GETS OPENED UP.

_____ AFTER BOILER INSPECTION RE-ASSEMBLE BOILER AND PUT BACK ON LINE.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1138-AM-4 HAMILTON AM ON BOILER 1 PM-SCH-A 1 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-A ANNUAL - SCHEDULED PM H-BLRS-1 HAMILTON BAS. B-58 BOILER ROOM--- # 1 BOILER 10/5/22 0:00 11/5/21 0:00 D 26 N Y 1 HVAC 1 4 H-BLRS. A ___COMBUSTION TEST HI FIRE; CO____ CO2____ O2____ EXCESS AIR____(SHOULD BE 15% TO 25%) EFF.____

___FLUE TEMPERATURE; HI FIRE____

___CHK. DRAFT DIVERTER; ADJ. AS NEC.

___CHK. FLAME SAFEGUARD CONTROLS; FLAME SIGNAL_____(SHOULD BE 2 TO 5 VOLTS)

___CHK. FILL VALVE; CLN. & ADJ. AS NEC.

___CKK. LIMIT CONTROLS; SETTING____(SET AT 200) ACTUAL CUT OFF TEMP.___

___CHK. FOR LEAKAGE RUST OR CORRISON; REPAIR AS NEC.

___TEST LOW WATER CUTOFFS;

___CHK. CHIMNEY CLEAN OUTS; CLN. AS NEC.

H-1139-AM-4 HAMILTON AM ON BOILER 2. PM-SCH-A 1 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-A ANNUAL - SCHEDULED PM H-BLRS-2 HAMILTON BAS. B-58 BOILER ROOM--- BOILER 10/29/22 0:00 11/4/21 0:00 D 26 N Y 1 HVAC 1 4 H-BLRS. A ___COMBUSTION TEST HI FIRE; CO____ CO2____ O2____ EXCESS AIR____(SHOULD BE 15% TO 25%) EFF.____

___FLUE TEMPERATURE; HI FIRE____

___CHK. DRAFT DIVERTER; ADJ. AS NEC.

___CHK. FLAME SAFEGUARD CONTROLS; FLAME SIGNAL_____(SHOULD BE 2 TO 5 VOLTS)

___CHK. FILL VALVE; CLN. & ADJ. AS NEC.

___CKK. LIMIT CONTROLS; SETTING____(SET AT 200) ACTUAL CUT OFF TEMP.___

___CHK. FOR LEAKAGE RUST OR CORRISON; REPAIR AS NEC.

___TEST LOW WATER CUTOFFS;

___CHK. CHIMNEY CLEAN OUTS; CLN. AS NEC.

H-1141-MM HAMILTON QM ON HASKRIS WATER CHILLER 3 PM-SCH-M 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-M MONTHLY - SCHEDULED PM H-HASKRIS CHILLER 3 HAMILTON BAS. B-525A LAB HASKRIS CHILLER 3 FOR MICROSCOPE IN B-525. 4/7/22 0:00 2/11/22 0:00 D 108 N M 1 HVAC 1 2 H-HASCH 3

____Chk. for nut & bolt tightness, noise, vibration & electric system.

____Cln. unit & area around unit; paint, etc. as nec.

____Chk. condenser; FAN AMPS ____ (SHOULD BE 1.7) ____Cln. condenser coils as nec.

____REPLACE FILTER CONDENSER COIL

H-1142-QM-4 HAMILTON QM ON HASKRIS WATER CHILLER 2 PM-SCH-Q 1 N H-PM-SCH N CHRIS NIOSH-CIN 1 CHRIS THOMPSON CHRIS THOMPSON CHRIS PM-SCH-Q QUARTERLY SCHEDULED PM H-HASWCH-2 HAMILTON BAS. B-415 BACK OF CURTAIN BAS. CHILLER 3/9/20 0:00 D 161 N M 0 HVAC 1 2 H-HASCH 2 REMOVED FROM SERVICE, DUE TO SURPLUS TC 2-20-20

____Chk. voltage;_________(NAMEPLATE 208 VOLTS) ____Chk. Compressor; Amps _____,_____ (NAMEPLATE AMPS 7) ____Chk. pump; Amps __________(NAMEPLATE AMPS 2.9) ____Chk. evap. tank, intake water filter & inline water filter. cln or replace as nec.

____Chk. for nut & bolt tightness, noise, vibration & electric system.

____Cln. unit & area around unit; paint, etc. as nec.

____Chk. condenser; sup. temp. _____, ret. _____, cln. as nec.

____Chk. chilled water supply temps. _____ (SHOULD BE APP. 63) ____Chk. drain; cln as nec.

____Chk. Ref. pressures & sight glass hi____Lo____ add freon as nec.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1143-QM-5 HAMILTON QM ON RTU-1. PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-1 HAMILTON ROOF - ROOF--- ROOF TOP HEAT & A/C UNIT 4/3/22 0:00 1/11/22 0:00 D 167 N M 3 HVAC 1 4 H-RTU-1 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____,____;(NAMEPLATE AMPS 8.5) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____ (NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BELTS, BLOWER,RPM______ (SHOULD BE APP. 1200) & PULLEYS; LUBE AS NEC.(USES 1 A39 BELT)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____; ( NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC. (USES 2 16X25X2 INSIDE) & 1 12X24X2 OUTSIDE)

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. ADD TREATMENT TABLETS.

____CHK. HEAT EXCHANGER , FLUE PASSAGES, GAS LINES; CLN. OR REPAIR AS NEC.

____CHK. BURNER; EXHAUSTER MOTOR AMPS____(NAMEPLATE .57 AMPS)CLN & ADJ. AS NEC

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1144-QM-5 HAMILTON QM ON RTU-2 PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-2 HAMILTON ROOF - ROOF--- ROOF TOP HEAT & A/C UNIT 4/12/22 0:00 1/12/22 0:00 C 167 N M 3 HVAC 1 4 H-RTU-2 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____(NAMEPLATE AMPS 10.2) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____ (NAMEPLATE AMPS 18.2)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BELTS, BLOWER, RPM_____(SHOULD BE APP. 1300) & PULLEYS; LUBE AS NEC.(USES 1 A40 BELT)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____; (NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USED 2 16X25X2 INSIDE & 1 12X24X2 OUTSIDE)

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. ADD TREATMENT TABLETS.

____CHK. HEAT EXCHANGER , FLUE PASSAGES, GAS LINES; CLN. OR REPAIR AS NEC.

____CHK. BURNER; EXHAUSTER MOTOR AMPS____ (NAMEPLATE .57) CLN & ADJ. AS NEC

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1145-QM-5 HAMILTON QM ON RTU-14 PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-14 HAMILTON ROOF N. W. 156 ROOF N. W. RTU FOR RM. 156. 4/6/22 0:00 1/12/22 0:00 D 165 N M 3 HVAC 1 4 H-RTU-14 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____,____;(NAMEPLATE AMPS 5.8) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____ (NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BELTS, BLOWER, RPM_____ (SHOULD BE APP. 1200) & PULLEYS; LUBE AS NEC.(USES 1 A39 BELT)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____;(NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USES 2 16X25X2 INSIDE & 1 12X24X2 OUTSIDE)

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. ADD TREATMENT TABLETS.

____CHK. HEAT EXCHANGER , FLUE PASSAGES, GAS LINES; CLN. OR REPAIR AS NEC.

____CHK. BURNER; EXHAUSTER MOTOR AMPS____ (NAMEPLATE AMPS .57) CLN & ADJ. AS NEC

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1146-QM-5 HAMILTON QM ON RTU-24. PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-24 HAMILTON ROOF - ROOF--- ROOF TOP HEAT & A/C UNIT 4/5/22 0:00 1/11/22 0:00 D 166 N M 3 HVAC 1 4 H-RTU-24 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____(NAMEPLATE AMPS 8.5) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____ (NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BELTS, BLOWER, RPM_____ (SHOULD BE APP. 1200)& PULLEYS; LUBE AS NEC.(USES 1 A39 BELT)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____;(NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. ADD TREATMENT TABLETS.

____CHK. HEAT EXCHANGER , FLUE PASSAGES, GAS LINES; CLN. OR REPAIR AS NEC.

____CHK. BURNER;,AMPS_____ EXHAUSTER MOTOR AMPS____CLN & ADJ. AS NEC

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1147-QM-6 HAMILTON QM ON RTU-3 PM-SCH-Q 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-3 HAMILTON ROOF - 1ST FLOOR ROOF TOP HEAT & A/C UNIT 4/5/22 0:00 1/13/22 0:00 D 164 N M 3 HVAC 1 4 H-RTU-3 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____,____;(NAMEPLATE AMPS 8.5) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____ (NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BELTS, BLOWER, & PULLEYS; LUBE AS NEC.(USES 1 A39 BELT) RPM____

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____ (NAMEPLATE 1.4 AMPS) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC. (USES 2 16X25X2 INSIDE & 1 12X24X2 OUTSIDE)

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. ADD TREATMENT TABLETS.

____CHK. HEAT EXCHANGER , FLUE PASSAGES, GAS LINES; CLN. OR REPAIR AS NEC.

____CHK. BURNER;,EXHAUSTER MOTOR AMPS____(NAMEPLATE .57 AMPS) CLN & ADJ. AS NEC

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1148-QM-6 HAMILTON QM ON RTU-4 PM-SCH-Q 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-4 HAMILTON ROOF - ROOF--- ROOF TOP HEAT & A/C UNIT 4/2/22 0:00 1/21/22 0:00 D 164 N M 3 HVAC 1 4 H-RTU-4M ____CHK. VOLTAGE;____,____,____ (NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____ (NAMEPLATE AMPS 5.9) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____(NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BLOWER, & PULLEYS; LUBE AS NEC.

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____(NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USES 2 16X25X2 INSIDE AND 1 12X24X2 OUTSIDE)

____CHK. NUT & BOLT TIGHTNESS, NOISE , VIBRATION & ELECTRIC SYSTEM.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. .

____CHK. HEAT EXCHANGER & FLUE PASSAGES & GAS LINE; CLN. OR REPAIR AS NEC.

____CHK. BURNER;, EXHAUSTER MOTOR AMPS____(NAMEPLATE .57) CLN & ADJ. AS NEC.

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1149-QM-7 HAMILTON QM ON RTU-25 PM-SCH-Q 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-25 HAMILTON ROOF 150 150 ROOF TOP HEAT & A/C UNIT 4/2/22 0:00 1/13/22 0:00 D 164 N M 3 HVAC 1 4 H-RTU-25M ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____,____(NAMEPLATE AMPS 4) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____(NAMEPLATE AMPS 19.2)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BLOWER, RPM_____ (SHOULD BE APP. 1190) & PULLEYS; LUBE AS NEC. (USES 1 A40 BELT)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____(NAMEPLATE AMPS 1.9) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USES 2 16X25X2 INSIDE AND 1 12X24X2 OUTSIDE)

____CHK. NUT & BOLT TIGHTNESS, NOISE, VIBRATION & ELECTRIC SYSTEM.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE.

____CHK. HEAT EXCHANGER, FLUE PASSAGES & GAS LINE; CLN. OR REPAIR AS NEC.

____CHK. BURNER; EXHAUSTER MOTOR AMPS____ (NAMEPLATE AMPS .57) CLN & ADJ. AS NEC

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1150-QM-7 HAMILTON QM ON RTU-26. PM-SCH-Q 3 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-26 HAMILTON ROOF - 1ST FLOOR ROOF TOP HEAT & A/C UNIT 4/5/22 0:00 1/21/22 0:00 D 167 N M 3 HVAC 1 4 H-RTU-26 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____,____(NAMEPLATE AMPS 5.8) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS #1____,____,____ #2_____,_____,_____(NAMEPLATE AMPS 13.6 EACH)

____CHK. REF. PRESSURES; #1 LO______, HI______ #2 LO_____, HI_____

____CHK. BELTS, BLOWER, & PULLEYS; LUBE AS NEC. RPM______ (SHOULD BE APP. 590)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____,(NAMEPLATE AMPS 3.8) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC. (USES 4 16X20X2 INSIDE & 1 16X20X2 & 1 20X20X2 OUTSIDE)

____CHK. NUT & BOLT TIGHTNESS, NOISE, VIBRATION & ELECTRIC SYSTEM.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE.

____CHK. HEAT EXCHANGER, FLUE PASSAGES & GAS LINE; CLN. OR REPAIR AS NEC.

____CHK. BURNER; EXHAUSTER MOTOR AMPS____ (NAMEPLATE AMPS .57) CLN & ADJ. AS NEC.

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1151-QM-8 HAMILTON QM ON RTU-5 PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-5 HAMILTON ROOF - ROOF--- ROOF TOP HEAT & A/C UNIT 4/11/22 0:00 1/25/22 0:00 D 164 N M 3 HVAC 1 4 H-RTU-5 ____CHK. VOLTAGE;____,____,____ (NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____ (NAMEPLATE AMPS 5.9) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____(NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BLOWER, & PULLEYS; LUBE AS NEC.

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____(NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USES 2 16X25X2 INSIDE AND 1 12X24X2 OUTSIDE)

____CHK. NUT & BOLT TIGHTNESS, NOISE , VIBRATION & ELECTRIC SYSTEM.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. .

____CHK. HEAT EXCHANGER & FLUE PASSAGES & GAS LINE; CLN. OR REPAIR AS NEC.

____CHK. BURNER;, EXHAUSTER MOTOR AMPS____(NAMEPLATE .57) CLN & ADJ. AS NEC.

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1152-QM-8 HAMILTON QM ON RTU-6 PM-SCH-Q 1 Y H-PM-SCH N DAVID NIOSH-CIN 1 DAVID WELCH DAVID WELCH DAVID PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-6 HAMILTON ROOF - ROOF--- ROOF TOP UNITS 4/12/22 0:00 1/27/22 0:00 D 167 N M 3 HVAC 1 4 H-RTU-6 ____CHK. VOLTAGE;____,____,____ (NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____ (NAMEPLATE AMPS 5.9) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____(NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BLOWER, & PULLEYS; LUBE AS NEC.

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____(NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USES 2 16X25X2 INSIDE AND 1 12X24X2 OUTSIDE)

____CHK. NUT & BOLT TIGHTNESS, NOISE , VIBRATION & ELECTRIC SYSTEM.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. .

____CHK. HEAT EXCHANGER & FLUE PASSAGES & GAS LINE; CLN. OR REPAIR AS NEC.

____CHK. BURNER;, EXHAUSTER MOTOR AMPS____(NAMEPLATE .57) CLN & ADJ. AS NEC.

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1153-QM-9 HAMILTON QM ON RTU-7 PM-SCH-Q 1 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-7 HAMILTON ROOF - ROOF--- ROOF TOP UNIT 4/5/22 0:00 1/19/22 0:00 D 167 N M 3 HVAC 1 4 H-RTU-7 ____CHK. VOLTAGE;____,____,____ (NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____ (NAMEPLATE AMPS 5.9) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____(NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BLOWER, & PULLEYS; LUBE AS NEC.

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____(NAMEPLATE AMPS 1.4) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USES 2 16X25X2 INSIDE AND 1 12X24X2 OUTSIDE)

____CHK. NUT & BOLT TIGHTNESS, NOISE , VIBRATION & ELECTRIC SYSTEM.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. .

____CHK. HEAT EXCHANGER & FLUE PASSAGES & GAS LINE; CLN. OR REPAIR AS NEC.

____CHK. BURNER;, EXHAUSTER MOTOR AMPS____(NAMEPLATE .57) CLN & ADJ. AS NEC.

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1155-QM-9 HAMILTON QM ON RTU-8 PM-SCH-Q 1 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-8 HAMILTON ROOF - ROOF--- ROOF TOP HEAT & A/C UNIT 4/6/22 0:00 1/20/22 0:00 D 168 N M 3 HVAC 1 4 H-RTU-8 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____,____(NAMEPLATE AMPS 7.5) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS #1____,____,____ #2_____,_____,_____(NAMEPLATE AMPS 17.9 EACH)

____CHK. REF. PRESSURES; #1 LO______, HI______ #2 LO_____, HI_____

____CHK. BELTS,(USES 1 A48 BELT) BLOWER, & PULLEYS; LUBE AS NEC. RPM______(SHOULD BE APP. 1000)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____(NAMEPLATE AMPS 3.8) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC.(USES 4 20X20X2 INSIDE & 1 20X20X2 & 1 16X20X2 OUTSIDE)

____CHK. NUT & BOLT TIGHTNESS, NOISE, VIBRATION & ELECTRIC SYSTEM.

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE.

____CHK. HEAT EXCHANGER, FLUE PASSAGES & GAS LINE; CLN. OR REPAIR AS NEC.

____CHK. BURNER; EXHAUSTER MOTOR AMPS____ (NAMEPLATE AMPD .57) CLN & ADJ. AS NEC.

____CHK. REGISTORS AND GRILLS; CLN. AS NEC.

____CHK. EVAP. AND CONDENSER COILS; CLN. AS NEC.

SUPERVISOR'S SIG:___________________PASSED___ FAILED___ CLOSED____

H-1157-QM-10 HAMILTON QM ON RTU-10 PM-SCH-Q 3 Y H-PM-SCH N STEVE-B NIOSH-CIN 1 STEVE BONAPFEL STEVE-B BONAPFEL STEVE PM-SCH-Q QUARTERLY SCHEDULED PM H-RTU-10 HAMILTON ROOF - ROOF--- ROOF TOP HEAT & A/C UNIT 4/13/22 0:00 1/21/22 0:00 D 168 N M 3 HVAC 1 4 H-RTU-10 ____CHK. VOLTAGE;____,____,____(NAMEPLATE VOLTS 208)

____CHK. MOTOR; AMPS ____,____,____;(NAMEPLATE AMPS 8.5) CLEAN & LUBE AS NEC.

____CHK. COMPRESSOR; AMPS____,____,____ (NAMEPLATE AMPS 17.7)

____CHK. REF. PRESSURES; LO______, HI______

____CHK. BELTS, BLOWER, & PULLEYS; LUBE AS NEC. RPM_____(SHOULD BE APP. 1060) (USES 1 A39 BELT)

____CHK. TEMPS. SUPPLY____, RETURN____, MIXED____,OUTSIDE____

____CHK. CONDENSER FAN; AMPS____,____ (NAMEPLATE 1.4 AMPS) CLN. & LUBE AS NEC.

____CHK. FILTERS; CLN. OR REPLACE AS NEC. (USES 2 16X25X2 INSIDE & 1 12X24X2 OUTSIDE)

____CLN. UNIT AND AREA AROUND THE UNIT. WAX OR PAINT AS NEC.

____CLN. CONDENSATE DRAIN PAN & LINE. ADD TREATMENT TABLETS.

____CHK. HEAT EXCHANGER , FLUE PASSAGES, GAS LINES; CLN. OR REPAIR AS NEC.

____CHK. BURNER;,EXHAUSTER MOTOR AMPS____(NAMEPLATE .57 AMPS) CLN & ADJ. AS NEC

____CHK. REGISTORS AND GRILLS;…