Questions_Received_from_Solicitation_DFSC_responses.docx

DOCX document 14 KB Posted

Attached to
OPTION - Relocatable Buildings Federal contract opportunity
Solicitation number
1116275
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to OPTION - Relocatable Buildings, newest first.
File Type Posted
Updated_Work_Statement_10_April.pdf PDF
Third_set_of_Questions_DFSC_response.docx DOCX document
Answers_to_Questions.docx DOCX document
PERFORMANCE_WORK_STATEMENT_Relocatables.pdf PDF
Attachment_1-_Layout.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Received from Solicitation

1. For data/comm & CCTV are we to provide box and conduit?

Government Response: No. Communication lines to include box and conduit will be installed under a separate contract.

2. Is a fire alarm/MNS system required? If so, what is the approved system?

Government Response: No, not under this contract. Customer will supply and install surface-mounted smoke detectors.

3. Part 5 Section 5.1.5 states for exterior doors to be solid core doors. Typically, exterior doors are metal doors with knock down frames.

Government Response: If a fully metal constructed door with some type of core inside (not hollow) is available that offers equal or better protection than a solid core wood door then that would be acceptable.

4. Are the standard 2x4 T8 fluorescent lighting fixture be acceptable?

Government Response: Yes, this is acceptable in accordance with the PWS.

5. There is a computer room on the plans. Is that intended for the data rack and patch panels? If so, will there be a separate split system required for that room for cooling?

Government Response: A split system will be required.

6. Standard exterior finishes are typically R-panel or smart panel. Is this acceptable?

Government Response: Yes, R-panel and Smart panel siding is acceptable.

7. Standard roofing is EPDM. Will this be acceptable?

Government Response: Yes

8. Does the modular building contractor supply utility connections to the three buildings?

Government Response: Contractor shall supply and install the hardware for all utility connections. However, the installation will make all utility tie-ins.

9. Does the modular building contractor supply furniture?

Government Response: No. Furniture is not a part of this contract.

10. Will the building pad be provided by the government?

Government Response: The Relocatables will sit upon an existing asphalt service, of which is fairly level. Contractor will be responsible for leveling and securing the structures per the PWS.

File details come from the government source that posted it.